[{"name":"Scotts Ferry Road Bridge Replacement","government":"Bay County","category":"Bridge Repair","status":"in_progress","pct_complete":30,"promised_cost":null,"programmed_cost":420000,"actual_cost":null,"fiscal_years":"FY2021","location":"Unincorporated Bay County","lat":30.35132,"lng":-85.409677,"description":"Scotts Ferry Road is a two lane paved roadway connecting Bay County and Calhoun County. The road currently has a structurally deficient one lane wooden bridge that has flooded during past rain events due to its low elevation. This project will construct a new two lane bridge at a higher elevation.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D5&outFields=*&outSR=4326&f=json","schedule_programmed_total":520000,"schedule_fy_amounts":{"2021":420000,"2024":100000},"schedule_line":"Scotts Ferry Road Bridge Replacement (design); Replace Scotts Ferry Road Bridge (75% FDOT)","schedule_match_method":"exact name; name words + category","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Deer Point Dam Bridge Repair","government":"Bay County","category":"Bridge Repair","status":"completed","pct_complete":100,"promised_cost":500000.0,"programmed_cost":474834,"actual_cost":null,"fiscal_years":"FY2017","location":"Unincorporated Bay County","lat":30.268325,"lng":-85.605938,"description":"County Road 3221 is a major collector roadway connecting U.S. Highway 231 and State Road 77. At the dam, the bridge deck has multiple cracks and minor deterioration needing repair. Additionally, the existing fishing walkway needs significant repairs. The proposed project will make repairs to the existing bridge structure before any further damage occurs.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D6&outFields=*&outSR=4326&f=json","schedule_programmed_total":474834,"schedule_fy_amounts":{"2017":474834},"schedule_line":"Deer Point Dam Bridge Rehabilitation","schedule_match_method":"name words + category","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":"2016-10-01","date_end":"2017-09-30","date_precision":"fiscal_year"},{"name":"13th Street Bridge Replacement","government":"Bay County","category":"Bridge Repair","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Unincorporated Bay County","lat":30.171248,"lng":-85.627128,"description":"The 13th Street Bridge in Cedar Grove serves local traffic. It is functionally obsolete and structurally deficient, requiring weight- limit restrictions. The project proposes to replace this local bridge with a new structure.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D7&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"County Road 2301 Bridge Replacement","government":"Bay County","category":"Bridge Repair","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Unincorporated Bay County","lat":30.288144,"lng":-85.540316,"description":"County Road 2301 is a major collector roadway connecting County Road 388 and U.S. Highway 231. The existing bridge is extremely narrow and functionally obsolete. Accidents occur at this location due to the restrictiveness of the bridge. The proposed project will construct a new two- lane bridge with adequate shoulders.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D8&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Scott Road Bridge Replacement","government":"Bay County","category":"Bridge Repair","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Unincorporated Bay County","lat":30.555253,"lng":-85.435177,"description":"Scott Road is a two lane paved roadway serving local traffic. The roadway currently has a structurally deficient one- lane wooden bridge prone to flooding during rain due to its low elevation. The proposed project will construct a new two lane bridge at a higher elevation.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D9&outFields=*&outSR=4326&f=json","schedule_programmed_total":100000,"schedule_fy_amounts":{"2024":100000},"schedule_line":"Replace Scott Road Bridge (FDOT)","schedule_match_method":"name words + category","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Transmitter Road at US Highway 231 Intersection Improvements","government":"Bay County","category":"Intersection Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Unincorporated Bay County","lat":30.213131,"lng":-85.60753,"description":"This project will consist of the addition of a dedicated right-turn lane for south-bound traffic at the intersection of Transmitter Road and U.S. Highway 231. Motorists on U.S. Highway 231 endure significant delays because of the time that is needed for the traffic signal to serve Transmitter Road. This project will enhance daily traffic by reducing both stops and delays for all approaches at the intersection.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D10&outFields=*&outSR=4326&f=json","schedule_programmed_total":1384000,"schedule_fy_amounts":{"2022":259000,"2023":1125000},"schedule_line":"Transmitter Rd & US 231 (SB Rt Turn Lane) ($1,384,000 FDOT Grant)","schedule_match_method":"name words + category","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"County Road 389 at US Highway 231 Intersection Improvements","government":"Bay County","category":"Intersection Improvement","status":"completed","pct_complete":100,"promised_cost":800000.0,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2017","location":"Unincorporated Bay County","lat":30.200774,"lng":-85.624889,"description":"This project will consist of the addition of a dedicated right-turn lane for south-bound traffic at the intersection of County Road 389 (East Avenue) and U.S. Highway 231. Motorists on U.S. Highway 231 experience significant delays because of the time that is needed for the traffic signal to serve County Road 389. This project will enhance daily traffic by reducing both stops and delays for all approaches at the intersection.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D11&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2016-10-01","date_end":"2017-09-30","date_precision":"fiscal_year"},{"name":"County Road 389 and State Road 77","government":"Bay County","category":"Intersection Improvement","status":"completed","pct_complete":100,"promised_cost":400000.0,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2017","location":"Unincorporated Bay County","lat":30.24068,"lng":-85.648765,"description":"This project will consist of the addition of a left-turn lane for west bound traffic on County Road 389 turning onto State Road 77. At this heavily traveled intersection, vehicles heading west through the intersection are forced to wait for left-turning motorists to move before they can proceed through the intersection. This project will enhance daily traffic by decreasing congestion and improving the flow of vehicles through the intersection.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D12&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2016-10-01","date_end":"2017-09-30","date_precision":"fiscal_year"},{"name":"Star Avenue and US Highway 231 Intersection Improvements","government":"Bay County","category":"Intersection Improvement","status":"in_progress","pct_complete":10,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Unincorporated Bay County","lat":30.248754,"lng":-85.557193,"description":"This project will include the construction of a second left-turn lane at the intersection of Star Avenue and U.S. Highway 231 for vehicles turning off of Star Avenue. This intersection is heavily trafficked, and because of the close proximity to the intersection of Star Avenue and John Pitts Road there is limited turn lane space for vehicles turning onto U.S. Highway 231.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D13&outFields=*&outSR=4326&f=json","schedule_programmed_total":2000000,"schedule_fy_amounts":{"2024":2000000},"schedule_line":"Star Ave @ US 231","schedule_match_method":"name words + category + cross streets","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Pedestrian Safety, City Sidewalks","government":"City of Lynn Haven","category":"Roadway Safety","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Lynn Haven","lat":30.246498,"lng":-85.642895,"description":"This project would add 7.5 miles of sidewalks in the city limits, specifically on parts of: West 26th St, Tennessee Ave, East 26th St, Minnesota Ave, Maine Ave, West 14th St, West 5th St, East 8th St, Illinois Ave and East 39th St.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D23&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Joan Avenue at North Lagoon Drive Intersection Improvements","government":"Bay County","category":"Intersection Improvement","status":"in_progress","pct_complete":10,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Unincorporated Bay County","lat":30.172199,"lng":-85.789786,"description":"This project will consist of the addition of left turn lanes for all approaches at the intersection of Joan Ave and North Lagoon Dr. Vehicles on all four approaches are forced to wait for a vehicle in the front of the queue to make a left turn before they can proceed through the intersection. The project will enhance daily traffic by decreasing congestion and improving the flow of vehicles through the intersection.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D41&outFields=*&outSR=4326&f=json","schedule_programmed_total":1200000,"schedule_fy_amounts":{"2022":200000,"2023":1000000},"schedule_line":"Joan Ave at North Lagoon Dr","schedule_match_method":"name words + category + cross streets","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Sherman Avenue and 15th Street (US Highway 98) Intersection Improvements","government":"Bay County","category":"Intersection Improvement","status":"in_progress","pct_complete":10,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Unincorporated Bay County","lat":30.174943,"lng":-85.633369,"description":"This project will include the construction of left-turn lanes for Sherman Avenue at its intersection with 15th Street (U.S. Highway 98). This intersection endures significant traffic volumes, forcing vehicles to wait for left-turning vehicles before they can proceed through the intersection. The project will enhance daily traffic by decreasing congestion and improving the flow of vehicles through the intersection.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D42&outFields=*&outSR=4326&f=json","schedule_programmed_total":888000,"schedule_fy_amounts":{"2022":138000,"2023":750000},"schedule_line":"Sherman Avenue & 15th Street","schedule_match_method":"name words + category","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Bay Head Road at County Road 2301 Intersection Improvements","government":"Bay County","category":"Intersection Improvement","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Unincorporated Bay County","lat":30.304799,"lng":-85.54871,"description":"This project will include the construction of a left turn lane for traffic turning from County Road 2301 onto Bay Head Road. This intersection is heavily trafficked by left-turning vehicles. This project will enhance roadway safety by placing turning vehicles in their own lane, thus reducing the likelihood of a rear-end collision.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D43&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Moylan Road at Panama City Beach Parkway Intersection Improvements","government":"Bay County","category":"Intersection Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Unincorporated Bay County","lat":30.19058,"lng":-85.792696,"description":"This project will include the construction of a dedicated right- turn lane for vehicles turning from Moylan Road onto Panama City Beach Parkway. This additional lane will reduce congestion and increase storage for vehicles on Moylan Road.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D45&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Grand Lagoon Regional Stormwater Facility","government":"Bay County","category":"Stormwater Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":275730,"actual_cost":null,"fiscal_years":"FY2023","location":"Unincorporated Bay County","lat":30.185013,"lng":-85.781908,"description":"Grand Lagoon is one of the older developed areas of Panama City Beach. The Grand Lagoon area suffers from a lack of stormwater treatment, flooding, and it is in critical need of stormwater facilities. The proposed project includes a stormwater treatment facility designed to improve water quality flowing into Grand Lagoon and reduce the recurring flooding in the Vecuna Circle and Faith Lane Areas.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D115&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"11th and Sherman Drainage Improvement Project","government":"Bay County","category":"Stormwater Improvement","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Unincorporated Bay County","lat":30.168058,"lng":-85.63331,"description":"There has been repetitive property flooding at the northeast corner of Sherman Ave and 11th St located in the Watson Bayou Drainage Basin. Bay County and the City of Panama City has contracted with CDM to develop the Watson Bayou Stormwater Management Master (SWMM) Plan.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D116&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Industrial Drive and Redwood Aveue Outfall Improvements Project","government":"Bay County","category":"Stormwater Improvement","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Unincorporated Bay County","lat":30.169508,"lng":-85.63758,"description":"The goal of this project is to improve the water quality of Watson Bayou in the St. Andrews Bay System and to reduce upstream flooding of the 670- acre basin. This will be accomplished by installation of a 48- inch pipe and the addition of a nutrient separating baffle box.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D117&outFields=*&outSR=4326&f=json","schedule_programmed_total":1445697,"schedule_fy_amounts":{"2022":1445697},"schedule_line":"Industrial Drive & Redwood Ave Outfall Improvement (CDBG-DR)","schedule_match_method":"name words + category","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"State Avenue Box Culvert Replacement Project","government":"Bay County","category":"Stormwater Improvement","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Unincorporated Bay County","lat":30.210658,"lng":-85.666397,"description":"State Avenue is a collector road with a high traffic volume. It serves as an access road to multiple businesses, schools, hospitals, and residential areas. State Avenue recurrently floods during large rain events, resulting in the closure of the roadway, significant erosion and wash out of the downstream shoulder.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D118&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Stormwater Improvements","government":"City of Mexico Beach","category":"Stormwater Improvement","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Mexico Beach","lat":29.945943,"lng":-85.410456,"description":"As Mexico Beach continues to grow, a greater emphasis has to be placed on the protection of our citizens from flooding.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D954&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"mb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Pedestrian Safety, City Sidewalks","government":"City of Lynn Haven","category":"Roadway Safety","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Lynn Haven","lat":30.218718,"lng":-85.654959,"description":"This project would add 7.5 miles of sidewalks in the city limits, specifically on parts of: West 26th St, Tennessee Ave, East 26th St, Minnesota Ave, Maine Ave, West 14th St, West 5th St, East 8th St, Illinois Ave and East 39th St.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D2170&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Pedestrian Safety, City Sidewalks","government":"City of Lynn Haven","category":"Roadway Safety","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Lynn Haven","lat":30.240802,"lng":-85.655565,"description":"This project would add 7.5 miles of sidewalks in the city limits, specifically on parts of: West 26th St, Tennessee Ave, East 26th St, Minnesota Ave, Maine Ave, West 14th St, West 5th St, East 8th St, Illinois Ave and East 39th St.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D2171&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Pedestrian Safety, City Sidewalks","government":"City of Lynn Haven","category":"Roadway Safety","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Lynn Haven","lat":30.218602,"lng":-85.636403,"description":"This project would add 7.5 miles of sidewalks in the city limits, specifically on parts of: West 26th St, Tennessee Ave, East 26th St, Minnesota Ave, Maine Ave, West 14th St, West 5th St, East 8th St, Illinois Ave and East 39th St.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D2172&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Pedestrian Safety, City Sidewalks","government":"City of Lynn Haven","category":"Roadway Safety","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Lynn Haven","lat":30.230207,"lng":-85.644493,"description":"This project would add 7.5 miles of sidewalks in the city limits, specifically on parts of: West 26th St, Tennessee Ave, East 26th St, Minnesota Ave, Maine Ave, West 14th St, West 5th St, East 8th St, Illinois Ave and East 39th St.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D2173&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Pedestrian Safety, City Sidewalks","government":"City of Lynn Haven","category":"Roadway Safety","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Lynn Haven","lat":30.21846,"lng":-85.626617,"description":"This project would add 7.5 miles of sidewalks in the city limits, specifically on parts of: West 26th St, Tennessee Ave, East 26th St, Minnesota Ave, Maine Ave, West 14th St, West 5th St, East 8th St, Illinois Ave and East 39th St.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D2175&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Pedestrian Safety, City Sidewalks","government":"City of Lynn Haven","category":"Roadway Safety","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Lynn Haven","lat":30.246453,"lng":-85.637885,"description":"This project would add 7.5 miles of sidewalks in the city limits, specifically on parts of: West 26th St, Tennessee Ave, East 26th St, Minnesota Ave, Maine Ave, West 14th St, West 5th St, East 8th St, Illinois Ave and East 39th St.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D2176&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Pedestrian Safety, City Sidewalks","government":"City of Lynn Haven","category":"Roadway Safety","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Lynn Haven","lat":30.250413,"lng":-85.651667,"description":"This project would add 7.5 miles of sidewalks in the city limits, specifically on parts of: West 26th St, Tennessee Ave, East 26th St, Minnesota Ave, Maine Ave, West 14th St, West 5th St, East 8th St, Illinois Ave and East 39th St.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D2177&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Pedestrian Safety, City Sidewalks","government":"City of Lynn Haven","category":"Roadway Safety","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Lynn Haven","lat":30.237783,"lng":-85.662426,"description":"This project would add 7.5 miles of sidewalks in the city limits, specifically on parts of: West 26th St, Tennessee Ave, East 26th St, Minnesota Ave, Maine Ave, West 14th St, West 5th St, East 8th St, Illinois Ave and East 39th St.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D2178&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Pedestrian Safety, City Sidewalks","government":"City of Lynn Haven","category":"Roadway Safety","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Lynn Haven","lat":30.233165,"lng":-85.661464,"description":"This project would add 7.5 miles of sidewalks in the city limits, specifically on parts of: West 26th St, Tennessee Ave, East 26th St, Minnesota Ave, Maine Ave, West 14th St, West 5th St, East 8th St, Illinois Ave and East 39th St.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D2179&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Mashburn Road Bridge Replacement","government":"Bay County","category":"Bridge Repair","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Unincorporated Bay County","lat":30.40211,"lng":-85.543202,"description":"Mashburn Road is a dirt roadway serving local traffic in the area. The roadway currently has a one lane wooden bridge that is structurally deficient. The existing bridge has flooded during past rain events due to its low elevation. The proposed project will construct a new two lane bridge at a higher elevation.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D2586&outFields=*&outSR=4326&f=json","schedule_programmed_total":800000,"schedule_fy_amounts":{"2024":100000,"2025":700000},"schedule_line":"Replace Mashburn Rd Bridge","schedule_match_method":"name words + category","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Otter Creek Bridge Replacement","government":"Bay County","category":"Bridge Repair","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Unincorporated Bay County","lat":30.390209,"lng":-85.938896,"description":"Otter Creek Road is a two lane unpaved roadway serving local traffic in the area. The roadway currently has a one lane wooden bridge that is structurally deficient. The existing bridge has flooded during past rain events due to its low elevation. The proposed project will construct a new two lane bridge at a higher elevation.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D2589&outFields=*&outSR=4326&f=json","schedule_programmed_total":1800000,"schedule_fy_amounts":{"2025":100000,"2026":1700000},"schedule_line":"Repair Replace Otter Creek Bridge (75% LMS)","schedule_match_method":"name words + category","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Alvie Holmes Road Bridge Replacement","government":"Bay County","category":"Bridge Repair","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Unincorporated Bay County","lat":30.114879,"lng":-85.420775,"description":"Alvie Holmes Road is a dirt roadway serving local traffic in the area. The roadway currently has a one lane wooden bridge that is structurally deficient. The existing bridge has flooded during past rain events due to its low elevation. The proposed project will construct a new two lane bridge at a higher elevation.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D2590&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Pinecrest Road Bridge Replacement","government":"Bay County","category":"Bridge Repair","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Unincorporated Bay County","lat":30.451697,"lng":-85.418833,"description":"Pinecrest Road is a two lane dirt roadway serving local traffic in the area. The roadway currently has a one lane wooden bridge that is structurally deficient. The existing bridge has flooded during past rain events due to its low elevation. The proposed project will construct a new two lane bridge at a higher elevation.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D2591&outFields=*&outSR=4326&f=json","schedule_programmed_total":470000,"schedule_fy_amounts":{"2025":70000,"2026":400000},"schedule_line":"Replace Pinecrest Rd Bridge","schedule_match_method":"name words + category","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"County Road 389 at Dundee Lane Intersection Improvements","government":"Bay County","category":"Intersection Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"Unincorporated Bay County","lat":30.227357,"lng":-85.628412,"description":"This project will consist of the addition of a left turn lane for westbound traffic on CR 389 turning onto Dundee Lane. At this heavily traveled intersection, vehicles heading west are forced to wait for left turning vehicles to move before they can proceed. This project will enhance daily traffic by improving vehicle storage and the flow of vehicles on Cr 389.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D2592&outFields=*&outSR=4326&f=json","schedule_programmed_total":250000,"schedule_fy_amounts":{"2021":250000},"schedule_line":"CR 389 @ Dundee Lane Construct Left Turn Lane","schedule_match_method":"name words + category + cross streets","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Manhole Replacement Hwy 22A","government":"City of Parker","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"350 S Highway 22A","lat":30.14085,"lng":-85.599598,"description":"This \"critical necessity\" project replaced 14 vertical feet of concrete manhole, replaced an 8\" force main, and repaired and replaced portions of an 8\" water line","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D2595&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"parker","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"CA-24 Sewerlift Station Rehab","government":"City of Callaway","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Callaway","lat":30.151544,"lng":-85.559834,"description":"This project consists of the rehab of Callaway Lift Station CA-24, located south of E Highway 22 between Nelle St and Sukoshi Dr.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D2596&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"cw","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Citywide Fire Hydrant Shutoff Valve Insertion Project","government":"City of Callaway","category":"Utility Capacity Improvement","status":"in_progress","pct_complete":50,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Callaway","lat":30.143759,"lng":-85.576139,"description":"This city wide project consists of the insertion of missing shut off valves at all hydrants.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D2597&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"cw","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"24\" Stormwater Pipe","government":"City of Springfield","category":"Stormwater Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Flight Ave","lat":30.163733,"lng":-85.60149,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city has made improvements to the sewer system in this area. The road was resurfaced in the area where repairs were made to sewer system. Additionally stormwater improvements were made by installing a 24\" pipe.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D2999&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility Improvements","government":"City of Springfield","category":"Utility Capacity Improvement","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Springfield","lat":30.158819,"lng":-85.600985,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is making improvements to the water system in this area.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3000&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility Improvements","government":"City of Springfield","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Springfield","lat":30.164353,"lng":-85.619429,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city has made improvements to the sewer system in this area. Additionally Forestdale Ave, Greentree Rd, and 8th St from School Ave to Everitt were resurfaced.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3003&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility & Road Improvements","government":"City of Springfield","category":"Utility Capacity Improvement","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Springfield","lat":30.158407,"lng":-85.618299,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is making improvements to the water system and roads in this area E 5th Ct.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3004&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility Improvements","government":"City of Springfield","category":"Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Springfield","lat":30.150915,"lng":-85.601194,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city has made improvements to the sewer system in this area.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3007&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Road Improvements","government":"City of Springfield","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Springfield","lat":30.159633,"lng":-85.612885,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is making improvements to the roads in this area.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3008&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"CR 2297 Bridge Replacement","government":"Bay County","category":"Bridge Repair","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":789942,"actual_cost":null,"fiscal_years":"FY2017","location":"Unincorporated Bay County","lat":30.133268,"lng":-85.506314,"description":"This project will consist of the removal and construction of CR 2297 (Cooks Bayou) Bridge.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3011&outFields=*&outSR=4326&f=json","schedule_programmed_total":789942,"schedule_fy_amounts":{"2017":789942},"schedule_line":"CR 2297 Bridge Replacement (Grant / Surtax)","schedule_match_method":"exact name","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":"2016-10-01","date_end":"2017-09-30","date_precision":"fiscal_year"},{"name":"East Avenue Bridge Replacement","government":"City of Panama City","category":"Bridge Repair","status":"completed","pct_complete":100,"promised_cost":850000.0,"programmed_cost":734124,"actual_cost":null,"fiscal_years":null,"location":"East Avenue Bridge","lat":30.141167,"lng":-85.625175,"description":"Joint project with Bay County, Port Authority, DOT. Bridge Number 464201 on CR 389 (South East Avenue) over Watson Bayou is structurally deficient with a sufficiency rating of 14.0. The 51 year old structure has spalls, cracks, and section loss throughout the structure. FDOT has recommended the structure of replacement.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3411&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Pavement Evaluation Study","government":"City of Callaway","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Callaway","lat":30.153591,"lng":-85.576772,"description":"The City of Callaway has contracted with Transmap to conduct a pavement evaluation study for 65 miles of paved roads within the city.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3811&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"cw","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Road Improvements","government":"City of Springfield","category":"Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Springfield","lat":30.158973,"lng":-85.610556,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city has made improvements to the roads in this area. Additionally improvements to the water and sewer system were completed.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3813&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Naples Ave Liftstation","government":"City of Springfield","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"2419 Naples Ave","lat":30.19194,"lng":-85.609424,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is rehabing the sewer lift station on Naples Ave in conjuntion with other water and sewer improvements. Additionally Naples Ave is being resurfaced","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3814&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Berthe Bridge","government":"City of Callaway","category":"Bridge Repair","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"432 S Berthe Ave","lat":30.138389,"lng":-85.574457,"description":"This project consists of the rehab and reenforcement of the existing bridge.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3815&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"cw","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Betty Ln Liftstation","government":"City of Springfield","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"1435 Betty Ln","lat":30.172579,"lng":-85.610634,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is making improvements to the sewer system and roads in this area (Betty Lane).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3818&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Driver Safety, City Hall","government":"City of Lynn Haven","category":"Roadway Safety","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Lynn Haven","lat":30.245389,"lng":-85.64851,"description":"This project will make improvements to the Lynn Haven City Hall parking lot by striping parking spaces. These improvements will help to enhance ingress and egress for its users.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3819&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Cocoa Ave Liftstation","government":"City of Springfield","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"2300 Cocoa Ave","lat":30.18902,"lng":-85.619708,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is upgrading S Cocoa Ave. water, sewer upgrades, road resurfacing Douglas Rd - End SPR 26.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3820&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Everitt Ave Liftstation","government":"City of Springfield","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"145 Everitt Ave","lat":30.148369,"lng":-85.621291,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is rehabing the sewer lift station on Everitt Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3823&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"Cherry St Liftstation","government":"City of Springfield","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"4060 Cherry St","lat":30.145519,"lng":-85.60641,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is rehabing the sewer lift station on Cherry St.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3824&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Detroit Ave Liftstation","government":"City of Springfield","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Detroit Ave","lat":30.151439,"lng":-85.609666,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is rehabing the sewer lift station on Detroit Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3825&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Robindale Liftstation","government":"City of Springfield","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"801 Huntington Dr","lat":30.162736,"lng":-85.617895,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is rehabing the sewer lift station on Huntington Dr.and replacing two (2) Pumps at the Robindale Lift Station.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3826&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"8th Ct Liftstaion","government":"City of Springfield","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"4010 8th Ct","lat":30.165283,"lng":-85.602741,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is rehabing the sewer lift station and replacing two (2) Pumps at the 8th Ct. Lift Station .","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3827&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"4602 7th St Liftstation","government":"City of Springfield","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"4602 E 7th St","lat":30.160167,"lng":-85.603738,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is rehabing the sewer lift station on E 7th St and replacing Sewer ByPass Pumps","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3828&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Flight Ave Liftstation Rehabilitation","government":"City of Springfield","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"805 Flight Ave","lat":30.164252,"lng":-85.601569,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is rehabing the sewer lift station on Flight Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3829&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E 11th Ct Liftstation","government":"City of Springfield","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"5118 11th Ct","lat":30.168342,"lng":-85.59586,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is rehabing the sewer lift station on 11th Ct.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3830&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"12th Ct Liftstation","government":"City of Springfield","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"4004 12th Ct","lat":30.169369,"lng":-85.601276,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is rehabing the sewer lift station on 12th Ct.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3831&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Twins Pine Ln Liftstation","government":"City of Springfield","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"1405 Twin Pines","lat":30.173957,"lng":-85.603267,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is rehabing and replacing Sewer ByPass Pumps at the sewer lift station on Twin Pines Ln.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3832&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Avon Rd Liftstation","government":"City of Springfield","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"2632 Wheat Rd","lat":30.196423,"lng":-85.603657,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is rehabing the sewer lift station on Avon Rd.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3833&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E. Baldwin Rd :Liftstation","government":"City of Springfield","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"E. Baldwin Rd","lat":30.202282,"lng":-85.603278,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is rehabing the sewer lift station on E Baldwin Rd.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3834&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"2920 Avon Rd","government":"City of Springfield","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Cocoa Ave & Avon Rd","lat":30.196794,"lng":-85.619744,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is rehabing the sewer lift station at Cocoa Ave and Avon Rd.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3835&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Ten Acre Rd Liftstation","government":"City of Springfield","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"2551 Ten Acre Rd","lat":30.195229,"lng":-85.627059,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is rehabing the sewer lift station on Ten Acre Rd.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3836&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E. Baldwin Rd Liftstation","government":"City of Springfield","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"E. Baldwin Rd and Glenview Ave","lat":30.202062,"lng":-85.614301,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is rehabing the sewer lift station on E Baldwin Rd.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3837&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Brentwood PL Liftstation","government":"City of Springfield","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"3504 Brentwood PI","lat":30.191345,"lng":-85.60675,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is rehabing the sewer lift station and replacing two (2) Pumps on Brentwood Pl Liftstation.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3838&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Tram Rd Liftstation","government":"City of Springfield","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"4421 Tram Rd","lat":30.174517,"lng":-85.587559,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is rehabing the sewer lift station and replacing Sewer ByPass Pumps on Tram Rd.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3839&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E 3rd St Sewerlne relining","government":"City of Springfield","category":"Utility Capacity Improvement","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"E 3rd St","lat":30.152954,"lng":-85.605398,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is relining gravity sewer mains on E 3rd St near Martin Lake.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3840&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Transmitter Rd Manholes Rehab","government":"City of Springfield","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Transmitter Rd","lat":30.148088,"lng":-85.607095,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is rehabing the manholes at the south end of Transmitter Rd.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3841&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E 5th St Manholes Rehab","government":"City of Springfield","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"School Ave to Everitt Ave","lat":30.156698,"lng":-85.617872,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is rehabing the manholes on E 5th St between School Ave and Springfield Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3842&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"2712 Altha Ave","government":"City of Springfield","category":"Stormwater Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"2712 Altha Ave","lat":30.197603,"lng":-85.62275,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city has made Stormwater repairs at 2712 Altha Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3851&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"5th St and Helen Ave","government":"City of Springfield","category":"Stormwater Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"5th St & Helen Ave","lat":30.156699,"lng":-85.613362,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city has made Stormwater repairs at 5th & Helen Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3852&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility Improvements - Automated Metering System","government":"City of Springfield","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"City-wide","lat":30.168598,"lng":-85.608322,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city has implemented a City-wide Automated Metering System.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3853&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Huntington Dr and Greentree Rd","government":"City of Springfield","category":"Stormwater Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"HuningtonDr and Greentree Rd","lat":30.166644,"lng":-85.619441,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city has made Stormwater repairs at Huntington Dr & Greentree Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3854&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"7th St and School Ave","government":"City of Springfield","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"7th St. & School Ave","lat":30.160494,"lng":-85.616505,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city has made manhole repairs at 7th & School Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3856&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"12th St and Hammonds Dr","government":"City of Springfield","category":"Stormwater Improvement","status":"in_progress","pct_complete":25,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"12th St","lat":30.169174,"lng":-85.59635,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city has made Stormwater repairs at 12th & Hammonds Dr.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3857&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility Improvements","government":"City of Panama City","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":0,"actual_cost":null,"fiscal_years":null,"location":" Airport Rd Liftstation","lat":30.17843,"lng":-85.661337,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, installation of new sewer force main on Airport Rd.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3858&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Stanford Road Lift Station","government":"City of Panama City","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":0,"actual_cost":null,"fiscal_years":null,"location":"3111 Stanford Rd","lat":30.202896,"lng":-85.675654,"description":"Using funds from the half-cent surtax, relocation, replacement, and capacity upgrade for Sanitary Sewer Lift Station.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3859&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Lisenby Avenue Box Culvert","government":"City of Panama City","category":"Stormwater Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":0,"actual_cost":null,"fiscal_years":null,"location":" East of 2803 Lisenby Ave","lat":30.199752,"lng":-85.683186,"description":"Using funds from the half-cent surtax, Repair of existing box culvert to shore up errosion and structural support.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3860&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Five Area Sewer","government":"City of Panama City","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":0,"actual_cost":null,"fiscal_years":null,"location":"North of 1125 St Andrews Blvd","lat":30.204346,"lng":-85.678294,"description":"Using funds from the half-cent surtax, Water and sewer line were relocated due to the relocation of the Master Lift Station #34 to the Southwest corner of 39th Street and Stanford Road..","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3861&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Lannie Rowe","government":"City of Panama City","category":"Stormwater Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":0,"actual_cost":null,"fiscal_years":null,"location":" ","lat":30.145688,"lng":-85.645569,"description":"Using funds from the half-cent surtax, Design services for a new regional stormwater management system as part of the Cherry Street Infrastructure Improvement Project.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3862&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Breezy Lane Box Culvert Replacement","government":"City of Panama City","category":"Stormwater Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":0,"actual_cost":null,"fiscal_years":null,"location":" ","lat":30.190347,"lng":-85.67084,"description":"Using funds from the half-cent surtax, Replacement of aging stormwater infrastructure with installation of new concrete box culvert under Breezy Lane and repavement of roadway.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3863&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Complete Streets Design","government":"City of Panama City","category":"Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":0,"actual_cost":null,"fiscal_years":null,"location":"501 Harrison Ave","lat":30.157344,"lng":-85.660703,"description":"Review of the City's transportation related documents, a transportation study and completion of Recommended Street Design Drawings.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3864&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Pump Station 11 Improvements","government":"City of Panama City","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":0,"actual_cost":null,"fiscal_years":null,"location":"4919 Collegiate Dr","lat":30.188462,"lng":-85.724937,"description":"Using funds from the half-cent surtax, Improvements to Pump Station 11.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3865&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Breezy Lane Box Culvert Replacement","government":"City of Panama City","category":"Stormwater Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Between 2423 and 2425 Breezy Lane","lat":30.193004,"lng":-85.67187,"description":"Replacement of aging stormwater infrastructure with installation of new concrete box culvert under Breezy Lane and repavement of roadway.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3866&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Emergency Generators","government":"City of Springfield","category":"Capacity Improvement","status":"in_progress","pct_complete":50,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"408 School Ave","lat":30.155021,"lng":-85.616094,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing emergency Generators (Police & Fire).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3876&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"City Hall Parking Lot Paving","government":"City of Springfield","category":"Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"408 School Ave","lat":30.155197,"lng":-85.615958,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is improving 408 School Ave-City Hall Parking Lot Paving","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3877&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E 8th St","government":"City of Springfield","category":"Stormwater Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"E 8th St and Sanders Ln","lat":30.164146,"lng":-85.611349,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing stormwater Infrastructure at 8th St. & Sanders Ln..","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3881&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Sewer Line crossing Russ Lake  at E 7th St","government":"City of Springfield","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Russ Lake Tributary at 7th St Bridge","lat":30.160263,"lng":-85.603308,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is securing Sewer Line crossing Russ Lake Tributary at 7th St Bridge.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3882&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"7135 N Lagoon Dr","government":"Bay County","category":"Stormwater Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"7135 N Lagoon Dr ","lat":30.161765,"lng":-85.766875,"description":"FY2023","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3884&outFields=*&outSR=4326&f=json","schedule_programmed_total":372730,"schedule_fy_amounts":{"2023":372730},"schedule_line":"7135 N Lagoon Dr (HMGP Grant 100%)","schedule_match_method":"exact name","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"1716 Vecuna Cir","government":"Bay County","category":"Stormwater Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Bay County Property Purchase, 1716 Vecuna Cir","lat":30.186052,"lng":-85.783929,"description":"FY2023","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3885&outFields=*&outSR=4326&f=json","schedule_programmed_total":275730,"schedule_fy_amounts":{"2023":275730},"schedule_line":"1716 Vecuna Cir (HMGP Grant 100%)","schedule_match_method":"exact name","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Sports Ln Park","government":"City of Springfield","category":"Utility Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Sports Ln","lat":30.155864,"lng":-85.600337,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city replaced Sewer Pump at Sports Lane Park Concession","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3886&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E 9th St","government":"City of Springfield","category":"Stormwater Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"9th St and Detroit Ave","lat":30.165838,"lng":-85.609851,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing Stormwater Line - 9th St & Detroit Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3890&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Liftstation Rehabilitation","government":"City of Callaway","category":"Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"City wide","lat":30.153477,"lng":-85.577056,"description":"This project consists of the rehabilitation of Callaway Lift Station City Wider.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3892&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"cw","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"New Fire Engs","government":"City of Callaway","category":"Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"266 N Star Ave","lat":30.151152,"lng":-85.565399,"description":"This project consists of adding new fire engines to the city of Callaway Fire Station","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3893&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"cw","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"John B Gore Park","government":"City of Callaway","category":"Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"522 Beulah Ave","lat":30.137926,"lng":-85.571951,"description":"This project rehabilitated the John B Gore Park.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3894&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"cw","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Berthe Spillway Replacement","government":"City of Callaway","category":"Stormwater Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"432 S Berthe Ave","lat":30.138482,"lng":-85.57462,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3895&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"cw","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Berthe Drainange","government":"City of Callaway","category":"Stormwater Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"433 S Berthe Ave","lat":30.138466,"lng":-85.574333,"description":"This project is reinforcing pond enbankment.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3896&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"cw","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Fire Hydrant Valve Insertion","government":"City of Callaway","category":"Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"City wide","lat":30.153683,"lng":-85.577177,"description":"This project consists of Valve insertion on various Fire Hydrants City Wider.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3897&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"cw","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Storm Water Projects","government":"City of Callaway","category":"Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"City wide","lat":30.153804,"lng":-85.576851,"description":"This project consists of the rehabilitation of storm water projects of various location across the City Wider.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3898&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"cw","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Thomas Dr Drainage Rehab","government":"Bay County","category":"Stormwater Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"From Bristol St to Joan Ave (5616311)","lat":30.156744,"lng":-85.77251,"description":"FY2017","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3900&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Jamaican Lake Basin Model","government":"Bay County","category":"Stormwater Improvement","status":"in_progress","pct_complete":10,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Jamaican Lake","lat":30.264183,"lng":-85.976931,"description":"FY2023","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3903&outFields=*&outSR=4326&f=json","schedule_programmed_total":100000,"schedule_fy_amounts":{"2023":100000},"schedule_line":"Jamaican Lake Basin Model","schedule_match_method":"exact name","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Cedar Ave Seawall - 2020","government":"City of Parker","category":"Stormwater Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":15480,"actual_cost":null,"fiscal_years":null,"location":"Next to 1531 Cedar Ave","lat":30.118856,"lng":-85.603311,"description":"Covered Engineering cost for repairs to the seawall due to damage from Hurricane Michael.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3904&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"parker","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Melendy Walking Park - 2024","government":"City of Parker","category":"Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"824 N 11th St, Panama City, FL, 32404, USA","lat":30.131223,"lng":-85.595854,"description":"The stormwater pond helped with water retention and it better alleviated stormwater runoff in surrounding neighborhoods","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3907&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"parker","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"26th Street Connector Road","government":"Bay County","category":"Capacity Improvement","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Hwy 77 to Minnesota Ave","lat":30.218625,"lng":-85.647315,"description":"This project will include the construction of a new roadway from Minnesota Ave at 26th St to the intersection of State Road 77 and 26th St. This will provide another access route from State Road 77 to County Road 389 as well as an additional route to the schools in the vicinity.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(2)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Laird Street Roadway Safety Project","government":"Bay County","category":"Roadway Safety","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2017","location":"Joan Ave to Treasure Palm Dr","lat":30.178515,"lng":-85.78123,"description":"Bay County to construct a sidewalk along Laird St from Joan Ave to Treasure Palm Dr. This project will extend these sidewalks all of the way to Joan Ave improving connectivity from several neighborhoods to Thomas Dr as well as to Patronis Elementary.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(53)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2016-10-01","date_end":"2017-09-30","date_precision":"fiscal_year"},{"name":"County Road 388 Roadway Repaving","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"CR 2301 to U.S. Hwy 231","lat":30.384129,"lng":-85.484396,"description":"This project will include resurfacing County Road 388 from County Road 2301 to U.S. Highway 231. County Road 388 is a heavily traveled corridor spanning northeastern Bay County with significant failures in the existing pavement.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(54)&outFields=*&outSR=4326&f=json","schedule_programmed_total":2361570,"schedule_fy_amounts":{"2021":2361570},"schedule_line":"CR 388","schedule_match_method":"name words + category","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Frankford Avenue Roadway Safety Project","government":"Bay County","category":"Roadway Safety","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"Bridge to Dead-end","lat":30.192125,"lng":-85.69174,"description":"This project will include the addition a sidewalk along Frankford Avenue from 23rd Street to State Road 390. This project will tie into the sidewalk currently being constructed along Frankford Avenue south of 23rd Street and will provide connectivity to the bike and pedestrian features that will be added to State Road 390 with its widening. This project will include resurfacing this segment of roadway.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(57)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"North Lagoon Drive Repaving and Roadway Safety Project","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":523416.0,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY 2018","location":"Joan Ave to Thomas Dr","lat":30.17327,"lng":-85.792565,"description":"This heavily traveled collector road is a main thoroughfare used by tourists and residents to avoid traffic on Thomas Drive, causing significant pavement deterioration. Sidewalks and bike lanes will be installed along this section of roadway increasing pedestrian safety. The project consists of repaving and installing sidewalk and bike lanes on North Lagoon Drive from Thomas Drive to Joan Avenue.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(61)&outFields=*&outSR=4326&f=json","schedule_programmed_total":579416,"schedule_fy_amounts":{"2017":56000,"2018":523416},"schedule_line":"North Lagoon (Joan Ave to Thomas Drive)/Multi Use Path","schedule_match_method":"name words + category + cross streets","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Thomas Drive drainage rehab and Repaving","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":9970412.0,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2017,FY2018,  FY2019, FY2020, FY2021","location":"Bristol St to Joan Ave","lat":30.154574,"lng":-85.769537,"description":"This heavily traveled corridor is one of the main thoroughfares used by tourists and is severely deteriorated. This important project consists of repaving Thomas Drive from Bristol Street to Joan Avenue.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(63)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2016-10-01","date_end":"2021-09-30","date_precision":"range"},{"name":"County Road 389 (East Avenue) Repaving","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"SR390 to Baldwin Rd","lat":30.217351,"lng":-85.628933,"description":"This heavily traveled collector road connects Lynn Haven and State Road 390 traffic with U.S. Highway 231. The roadway is also a primary travel corridor for families with children in Hiland Park Elementary School and Bay Haven Charter Academy. This section of road is significantly deteriorated. This project consists of repaving County Road 389 (East Avenue) from State Road 390 to Baldwin Road.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(65)&outFields=*&outSR=4326&f=json","schedule_programmed_total":1348197,"schedule_fy_amounts":{"2020":1348197},"schedule_line":"CR 389 (East Ave) 390 to Baldwin","schedule_match_method":"name words + category + cross streets","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"County Road 2297 Repaving","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Airway St to Allanton Rd","lat":30.074979,"lng":-85.467584,"description":"County Road 2297 is a collector road serving as the main access to Allanton and the Eastern Shipbuilding facility. This section of road is severely rutted and cracked. This project consists of repaving County Road 2297 from Airway Road to Allanton Road.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(66)&outFields=*&outSR=4326&f=json","schedule_programmed_total":3428273,"schedule_fy_amounts":{"2023":3428273},"schedule_line":"CR 2297 (Grant 75%)","schedule_match_method":"name words + category","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"County Road 2300 Repaving","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":351540.0,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018, FY2019","location":"Hwy 77 to Dead end","lat":30.289919,"lng":-85.688729,"description":"This project consists of repaving County Road 2300 from State Road 77 to the Lansing Smith facility entrance. County Road 2300 serves as the link to the steam plant and the Bay County Emergency Operations Center, as well as ongoing residential development in the area. With substantial pavement deterioration along this stretch, improving this connection and upgrading the pavement to account for the expected increase in traffic is essential.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(67)&outFields=*&outSR=4326&f=json","schedule_programmed_total":0,"schedule_fy_amounts":{},"schedule_line":"CR 2300 (Grant & Non Surtax Funding)","schedule_match_method":"name words + category","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":"2017-10-01","date_end":"2019-09-30","date_precision":"range"},{"name":"Laird Street","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Laurie Ave to Treasure Palm Dr","lat":30.178565,"lng":-85.78118,"description":"Laird Street is used by many residents to avoid traffic on Front Beach Road and North Lagoon Drive. This section of road has deteriorated to the point of rutting and cracking. The project consists of repaving Laird Street from Joan Avenue to Treasure Palm Drive.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(68)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Harvard Boulevard Repaving","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"SR 390 to E 12th St","lat":30.236895,"lng":-85.61456,"description":"Harvard Boulevard is one of the primary collector roads available to access residences in the College Point area. This section of road has experienced pavement deterioration resulting in rutting and cracking. The project consists of repaving Harvard Boulevard from 12th St to County Road 390.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(70)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Wildwood Road Repaving","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Big Daddy Dr to US 98","lat":30.195135,"lng":-85.761215,"description":"Wildwood Rd is the only collector road to service the residential area near West Bay and the Hathaway Bridge. This section of road has experienced significant pavement deterioration resulting in rutting and cracking. The project consists of repaving Wildwood Rd from Big Daddy Dr St to US Highway 98.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(71)&outFields=*&outSR=4326&f=json","schedule_programmed_total":235750,"schedule_fy_amounts":{"2020":235750},"schedule_line":"Wildwood Road","schedule_match_method":"name words + category","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Bayou George Drive Repaving","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"Us 231 to Cluster Rd","lat":30.261124,"lng":-85.523401,"description":"Bayou George Drive is a collector road that serves as the outlet to U.S. Highway 231 for numerous businesses and residential developments and has experienced significant pavement deterioration. The project consists of repaving Bayou George Drive from U.S. Highway 231 to Cluster Road.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(72)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Merritt Brown Road Repaving","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Cherokee Heights Rd to Star Ave","lat":30.23916,"lng":-85.5621,"description":"This collector road is the primary access for two schools: Tommy Smith Elementary School and Merritt Brown Middle School. The section of roadway being repaved is deteriorated, resulting in rutting and cracking. The project consists of repaving Merritt Brown Road from Cherokee Heights to Star Avenue.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(73)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Silver Lake Road Repaving","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2017","location":"US Hwy 231 to Deep Spriing Rd","lat":30.486836,"lng":-85.433105,"description":"This is a collector road that services the Fountain community and has experienced significant pavement deterioration in the form of weathering and numerous patches that have been placed as temporary pavement repairs. The project consists of repaving Silver Lake Rd from US Highway 231 to Deep Springs Rd.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(74)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2016-10-01","date_end":"2017-09-30","date_precision":"fiscal_year"},{"name":"New Church Road Repaving","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Long Rd to Kingwood Rd","lat":30.307055,"lng":-85.61133,"description":"New Church Road is deteriorated due to weathering and block cracking. The project consists of repaving New Church Road from Long Road to Kingwood Road.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(75)&outFields=*&outSR=4326&f=json","schedule_programmed_total":133400,"schedule_fy_amounts":{"2019":133400},"schedule_line":"New Church Road","schedule_match_method":"name words + category","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Long Road Repaving","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"New Church Rd to Resota Beach Rd","lat":30.303499,"lng":-85.604855,"description":"Long Road’s pavement has deteriorated markedly in the form of weathering, block cracking, and via patches that have been placed as temporary pavement repairs. The project consists of repaving Long Road from New Church Road to Resota Beach Road.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(76)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Resota Beach Road Repaving","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Hitchcock Rd to Cedar Bluff Rd","lat":30.339488,"lng":-85.599523,"description":"Resota Beach Road endures heavy truck traffic and has significantly deteriorated in the form of longitudinal cracking. Extensive patching is in place.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(77)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"County Road 2302 Repaving","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":325000.0,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Liberty Ave to Lemieux Creek Br","lat":30.287597,"lng":-85.651258,"description":"County Road 2302 is a heavily traveled collector road servicing residential traffic and traffic associated with Southport Elementary School. It has developed substantial pavement deterioration via alligator cracking, block cracking, and rutting. This project consists of repaving County Road 2302 from Liberty Avenue to Lemieux Creek Bridge.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(78)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Center Drive","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":262092.0,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2017","location":"Camellia St to Silver Lake Rd","lat":30.47303,"lng":-85.424145,"description":"This is a local road that services the Fountain community and has experienced significant pavement deterioration in the form of block cracking and longitudinal cracking. The project consists of repaving Center Dr from Camellia St to Silver Lake Rd.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(79)&outFields=*&outSR=4326&f=json","schedule_programmed_total":262092,"schedule_fy_amounts":{"2017":262092},"schedule_line":"Center Dr","schedule_match_method":"exact name","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":"2016-10-01","date_end":"2017-09-30","date_precision":"fiscal_year"},{"name":"Camellia Street Repaving","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":29783.0,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2017","location":"Hwy 231 to Center Dr","lat":30.4666,"lng":-85.423485,"description":"This is a local road that services the Fountain community and has experienced significant pavement deterioration in the form of block cracking. The project consists of repaving Camellia St from US Highway 231 to Center St.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(80)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2016-10-01","date_end":"2017-09-30","date_precision":"fiscal_year"},{"name":"Allison Avenue","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Front Beach Rd to North Lagoon Rd","lat":30.176155,"lng":-85.78656,"description":"This collector road is used by local traffic to transit from North Lagoon Drive to Front Beach Road, and the section of road to be repaved is rutted and cracked. The project consists of repaving Allison Avenue from Front Beach Road to North Lagoon Drive.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(81)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Frankford Avenue Repaving","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Bridge to End of the Road","lat":30.213519,"lng":-85.691692,"description":"This collector road is used primarily by local traffic to access businesses on the north end of the corridor. This section of road is deteriorated, resulting in pavement rutting and cracking. This project consists of repaving Frankford Avenue from the bridge to the end of the road.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(82)&outFields=*&outSR=4326&f=json","schedule_programmed_total":300000,"schedule_fy_amounts":{"2021":300000},"schedule_line":"Frankford Ave","schedule_match_method":"name words + category","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Pine Log Road Repaving","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"Hyw 79 to Mullins Rd","lat":30.389999,"lng":-85.895048,"description":"This collector road has deteriorated substantially in many forms: alligator cracking, block cracking, depressions, edge cracking, longitudinal cracking, patching, potholes, and rutting. The project consists of repaving Pine Log Road from State Road 79 to Mullins Road.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(83)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Highpoint Road Repaving","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":275000.0,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"CR 2311 to Bridge 464093","lat":30.296327,"lng":-85.581644,"description":"This is a local road that has experienced significant pavement deterioration in the form of block cracking, potholes, weathering, and numerous patches that have been placed as temporary pavement repairs. The project consists of repaving Highpoint Rd from County Road 2311 to the bridge.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(84)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"East Callaway Drive Repaving","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"SR22 to End of Pavement","lat":30.170045,"lng":-85.489825,"description":"This collector road is used primarily by local traffic but is also heavily traveled by logging trucks. This section of road is significantly deteriorated, resulting in rutting and cracking. It is especially bad at the stop sign at the intersection of State Road 22 where heavy trucks come to a stop. This project consists of repaving East Callaway Drive from State Road 22 to the end of the county road.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(85)&outFields=*&outSR=4326&f=json","schedule_programmed_total":740000,"schedule_fy_amounts":{"2021":740000},"schedule_line":"East Callaway Dr","schedule_match_method":"name words + category","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Cherokee Heights Road Repaving","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Nehi Rd to End of Pavement","lat":30.23648,"lng":-85.56745,"description":"This collector road services a high volume of residential traffic to and from U.S. Highway 231 and is a connection to Tommy Smith Elementary and Merritt Brown Middle schools. Cherokee Heights Road from U.S. Highway 231 to the intersection of Nehi Road was recently repaved as part of the Bay County’s Fiscal Year 2015 Annual Resurfacing Project - Phase 2.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(87)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Edwards Road","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Roseta Beach Rd to Huckleberry Ln","lat":30.32156,"lng":-85.594495,"description":"Edwards Road is a collector road that has deteriorated significantly due to weathering and raveling. The project consists of repaving Edwards Road from Resota Beach Road to Huckleberry Lane.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(88)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Laird Street","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Treasure Palm Dr to Thomas Dr","lat":30.17861,"lng":-85.766535,"description":"Laird Street is used by many residents to avoid traffic on Front Beach Road and North Lagoon Drive. This section of road is rutted and cracked. The project consists of repaving Laird Street from Thomas Drive to Treasure Palm Drive.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(89)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Allison Avenue","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"PCb Pkwy to Front Beach Rd","lat":30.185785,"lng":-85.78665,"description":"This collector road is used by local traffic to transit from the Panama City Beach Parkway to Front Beach Road. This section of road is rutted and cracked. The project consists of repaving Allison Avenue from Front Beach Road to Panama City Beach Parkway.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(90)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Indian Bluff Road","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":253047.0,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"CR 2301 to Indian Bluff Dr","lat":30.325437,"lng":-85.564262,"description":"Indian Bluff Road is a local road that has been significantly deteriorated due to block cracking, edge cracking, and numerous patches used as temporary pavement repairs. The project consists of repaving Indian Bluff Road from County Road 2301 to Indian Bluff Drive.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(91)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"County Road 389 (East Avenue) North Repaving","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":1325143.0,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"SR 390 to Hwy 77","lat":30.240349,"lng":-85.635362,"description":"This section of East Ave is an arterial road that provides alternative traffic flow for State Road 390. This section of road has experienced pavement deterioration resulting in rutting and cracking. The project consists of repaving County Road 389 (East Avenue) from State Road 390 to State Road 77.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(92)&outFields=*&outSR=4326&f=json","schedule_programmed_total":1325143,"schedule_fy_amounts":{"2019":1325143},"schedule_line":"CR 389 (East Ave) SR 77 to 390","schedule_match_method":"name words + category + cross streets","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"15th Street Multi-Use Path","government":"City of Mexico Beach","category":"Roadway Safety","status":"unknown","pct_complete":null,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"15th Street Multi-Use Path","lat":29.942766,"lng":-85.398271,"description":"The 15th St corridor funnels significant traffic from Hwy 386 to Hwy 98. Many pedestrians utilize 15th St as their path to the beach.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(572)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"mb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Oleander Avenue Resurfacing","government":"City of Mexico Beach","category":"Resurfacing","status":"unknown","pct_complete":null,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Oleander Avenue Resurfacing","lat":29.93343,"lng":-85.39707,"description":"Oleander Ave from Sea St to 8th St has experienced significant pavement deterioration and is in need of resurfacing.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(1774,1775)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"mb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Jenks Avenue Widening with Bike Lanes","government":"Bay County","category":"Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":8.0,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2017 - FY2021","location":"Jenks Avenue Widening with Bike Lanes","lat":30.213819,"lng":-85.662189,"description":"This heavily traveled corridor is significantly deteriorated and is in need of additional lanes. The project consists of widening Jenks Avenue to four lanes from Baldwin Road to State Road 390 to include the addition of bike lanes. This will provide for four lanes of traffic along Jenks Avenue from U.S. Highway 98 to State Road 390. Bike lanes will provide for safer connectivity for bicyclists traveling from Baldwin Road to State Road 390.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(1788)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2016-10-01","date_end":"2021-09-30","date_precision":"range"},{"name":"Sorrells Drive Paving","government":"Bay County","category":"Stormwater Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Sorrells Drive Paving","lat":30.47545,"lng":-85.39849,"description":"This unpaved roadway is part of the Webber Road Notice of Violation project (NOV 35-37). This project consists of paving Sorrells Dr from Webber Road to Edith Hite Dr to reduce sedimentation entering the adjacent waterbodies.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(1798)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"W Linger Longer Road Paving","government":"Bay County","category":"Stormwater Improvement","status":"in_progress","pct_complete":33,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"W Linger Longer Road Paving","lat":30.412509,"lng":-85.443795,"description":"This section of West Linger Longer Road is under an environmental Notice of Violation (NOV). This project consists of paving West Linger Longer Road from US 231 to Joshua Drive to reduce sedimentation from entering adjacent waterbodies.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(1799)&outFields=*&outSR=4326&f=json","schedule_programmed_total":2174270,"schedule_fy_amounts":{"2023":2174270},"schedule_line":"W. Linger Longer Rd (V33-34) (DEP Grant 40%)","schedule_match_method":"name words + category","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Webber Road Paving","government":"Bay County","category":"Stormwater Improvement","status":"completed","pct_complete":100,"promised_cost":950000.0,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2017","location":"Webber Road Paving","lat":30.47206,"lng":-85.410135,"description":"This unpaved connector is the subject of several environmental Notices of Violation (NOV 35-37). This project consists of paving Webber Road from US 231 to Sorrells Drive to reduce sedimentation entering the adjacent waterbodies.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(1800)&outFields=*&outSR=4326&f=json","schedule_programmed_total":587379,"schedule_fy_amounts":{"2017":587379},"schedule_line":"Webber Road (NOV 35-37) (Non Sales Tax Funds = $500,000)","schedule_match_method":"name words + category + cross streets","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":"2016-10-01","date_end":"2017-09-30","date_precision":"fiscal_year"},{"name":"County Road 30 (Front Beach Road) Safety Projcet","government":"Bay County","category":"Roadway Safety","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018; FY2021","location":"County Road 30 (Front Beach Road) Safety Projcet","lat":30.24288,"lng":-85.931595,"description":"This project will include the addition of a sidewalk along County Road 30 (Front Beach Road) from Twin Lakes Drive to East Lakeside Drive. This will allow for safe pedestrian connectivity to the many neighborhoods along Front Beach Road.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(2199,3409)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2021-09-30","date_precision":"range"},{"name":"Baldwin Road Widening","government":"Bay County","category":"Capacity Improvement","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Baldwin Road Widening","lat":30.202315,"lng":-85.635225,"description":"This heavily traveled corridor has experienced significant pavement deterioration and is in need of additional lanes. This project consists of widening Baldwin Road to four lanes of traffic from Minnesota Avenue to CR 389 completing the 4 laning of the corridor from SR 390 to CR 389.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(2599)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Alvie Holmes Road Paving","government":"Bay County","category":"Stormwater Improvement","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Alvie Holmes Road Paving","lat":30.097169,"lng":-85.428798,"description":"This unpaved roadway is the subject of several environmental Notices of Violation (NOV 27-28). This project consists of stabilizing Alvie Holmes Road from CR 2297 to Sandy Creek Road to reduce sedimentation entering the adjacent waterbodies.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(2600)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Old Allanton Road Paving","government":"Bay County","category":"Stormwater Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Old Allanton Road Paving","lat":30.11759,"lng":-85.468844,"description":"This unpaved local is the subject of several environmental Notices of Violation (NOV 24-25). This project consists of Stabilizing Old Allanton Road from Highway 22 to CR 2297 to reduce sedimentation entering the adjacent waterbodies.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(2601)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Bertha Nelson Road Paving","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Bertha Nelson Road Paving","lat":30.243345,"lng":-85.572705,"description":"This local road is the only County-owned road between Highway 2321, Titus Road and US 231 that remains unpaved. This project consists of paving Bertha Nelson Road from US 231 to Titus Road.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(2602)&outFields=*&outSR=4326&f=json","schedule_programmed_total":497710,"schedule_fy_amounts":{"2017":497710},"schedule_line":"Bertha Nelson Road (US 231 to Titus Road)","schedule_match_method":"name words + category + cross streets","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Wendy Road Paving","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"US 231 to Coe Road","lat":30.2678,"lng":-85.536015,"description":"Paving this local road would provide another access to the properties northeast of Highway 2301 and help to relieve some of the traffic load on Highway 2301. This project consists of paving Wendy Road from US 231 to Coe Road.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(2603)&outFields=*&outSR=4326&f=json","schedule_programmed_total":428220,"schedule_fy_amounts":{"2017":428220},"schedule_line":"Wendy Road (US 231 to Coe Road)","schedule_match_method":"name words + category + cross streets","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Veal Road Paving","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Davenport Ave to Hwy 231 to Bear Paw Ln","lat":30.334325,"lng":-85.43142,"description":"This section of Veal Road is the last remaining unpaved collector road in this area. This project consists of paving Veal Road from on both sides of US 231.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(2606)&outFields=*&outSR=4326&f=json","schedule_programmed_total":1545557,"schedule_fy_amounts":{"2020":1545557},"schedule_line":"Veal Road (Grant)","schedule_match_method":"name words + category","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Silver Lake Road Paving","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"S. Silver Lake Road to Deep Springs Rd","lat":30.487415,"lng":-85.46443,"description":"This is the last unpaved section of the collector road between US 231 and S. Silver Lake Road. This project consists of paving Silver Lake Road from S. Silver Lake Road to Deep Springs Road.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(2607)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Owenwood Road Paving","government":"Bay County","category":"Dirt Road Stabilization","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Owenwood Road Paving","lat":30.50919,"lng":-85.460945,"description":"This is the last unpaved portion of this rural collector road. This project consists of paving Owenwood Road from Deep Springs Road to Ring Road.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(2608)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"South Silver Lake Road Paving","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":419236.0,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"South Silver Lake Road Paving","lat":30.480415,"lng":-85.476395,"description":"This unpaved road connects two collector roads in the Fountain area. This project consists of paving South Silver Lake Road from Silver Lake Road to Cowels Road.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(2609)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Roll O Home Road Paving","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":360000.0,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2017","location":"Roll O Home Road Paving","lat":30.4573,"lng":-85.390531,"description":"This unpaved connector is the main access for the residents of Fountain who live north of Highway 20 and east of US 231. This project consists of paving Roll O Home Road from SR 20 to Sorrells Drive.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(2610)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2016-10-01","date_end":"2017-09-30","date_precision":"fiscal_year"},{"name":"Sweetwater Branch Road Paving","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Sweetwater Branch Road Paving","lat":30.535547,"lng":-85.426609,"description":"Paving this road would provide paved access between Scott Road and Ownwood Road, two collectors roads that serve the west side population of Fountain. This project consists of paving Sweetwater Branch Road from Owenwood Road to Scotts Road.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(2611)&outFields=*&outSR=4326&f=json","schedule_programmed_total":3624116,"schedule_fy_amounts":{"2022":3624116},"schedule_line":"Sweetwater Branch Road (DEP Grant 40%)","schedule_match_method":"name words + category","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"County Line Road Paving","government":"Bay County","category":"Dirt Road Stabilization","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"County Line Road Paving","lat":30.567565,"lng":-85.43454,"description":"This is the last section of County Line Road needing to be paved. Doing so would complete the paved access between Scott Road and US 231; two roads that serve the west side population of Fountain. This project consists of paving County Line Road from the currently paved section of County Line Road to Scott Road.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(2612)&outFields=*&outSR=4326&f=json","schedule_programmed_total":2200000,"schedule_fy_amounts":{"2023":900000,"2024":1300000},"schedule_line":"County Line Road DEP Grant","schedule_match_method":"name words + category","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Scott Road Paving","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Scott Road Paving","lat":30.560315,"lng":-85.4359,"description":"This is the last unpaved section of Scott Road between County Line Road and Highway 231, in the Fountain area. This project consists of paving Scott Road from County Line Road to Oak Tree Ln.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(2613)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Steel Field Road Paving","government":"Bay County","category":"Dirt Road Stabilization","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Steel Field Road Paving","lat":30.354611,"lng":-85.960905,"description":"This is the last section of Steelfield Road needing to be paved. This project consists of paving Steelfield Road from the currently paved section of Steelfield Road to the county line.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(2614)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Ivydell Street Paving","government":"Bay County","category":"Dirt Road Stabilization","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Ivydell Street Paving","lat":30.472272,"lng":-85.434946,"description":"Ivydell Road is an unpaved collector road that serves a large portion of the population of Fountain. This project consists of paving Ivydell Road from US 231 to the dead end.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(2615)&outFields=*&outSR=4326&f=json","schedule_programmed_total":550000,"schedule_fy_amounts":{"2026":550000},"schedule_line":"Ivydell Street","schedule_match_method":"name words + category","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Cowels Road Paving","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":2.131812,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Cowels Road Paving","lat":30.473221,"lng":-85.450698,"description":"This local collector provides a more direct routing for the residents of the Bear Pond area to access their properties from Highway 231. This project consists of paving Cowels Road from Silver Lake Road to South Silver Lake Road.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3010)&outFields=*&outSR=4326&f=json","schedule_programmed_total":2090708,"schedule_fy_amounts":{"2018":2090708},"schedule_line":"Cowels Road","schedule_match_method":"name words + category","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Nehi Road Paving","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Star Ave to Hwy 231","lat":30.225916,"lng":-85.566245,"description":"Nehi Road provides a more direct connection between Callaway and Lynn Haven by allowing access to East Highway 390 from Star Avenue. Paving this road would also reduce the amount of traffic on Star Avenue in the area of Merritt Brown School. This project consists of paving Nehi Road from Star Avenue to US 231.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3011)&outFields=*&outSR=4326&f=json","schedule_programmed_total":2144401,"schedule_fy_amounts":{"2019":2144401},"schedule_line":"Nehi Road (Grant)","schedule_match_method":"name words + category","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Connecticut Avenue Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Connecticut Avenue Repaving","lat":30.24016,"lng":-85.666985,"description":"This project resurfaces Connecticut Avenue from W 14th Steet to Sallie Mae Drive along with stormwater improvements at W 13th Street.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3809)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"W 17th Street Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"W 17th Street Repaving","lat":30.233345,"lng":-85.66997,"description":"This project resurfaces W 17th Street from Northshore Road to Maryland Avenue.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3810)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Vermont Ave Repaving & Stormwater Improvements","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Vermont Ave Repaving & Stormwater Improvements","lat":30.232445,"lng":-85.663715,"description":"This project resurfaces Vermont Avenue from W 19th Street to W 16th Street along with stormwater improvements.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3811)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Maine Ave Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Maine Ave Repaving","lat":30.237805,"lng":-85.66133,"description":"This project resurfaces Maine Avenue from W 19th Street to W 16th Street.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3812,4657)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"W 19th Street Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"W 19th Street Repaving","lat":30.230135,"lng":-85.66377,"description":"This project resurfaces W 19th Street from Maryland Avenue to Carolina Avenue along with stormwater improvments east of Montana Avenue.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3813)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Carolina Ave Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Carolina Ave Repaving","lat":30.234785,"lng":-85.657975,"description":"This project resurfaces Carolina Avenue from SR 390 to W 12th Street.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3816,5066)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"W 10th Street Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"W 10th Street Repaving","lat":30.24383,"lng":-85.65209,"description":"This project resurfaces W 10th Street from Tennessee Avenue to Ohio Avenue.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3817,6721)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Kentucky Ave Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Kentucky Ave Repaving","lat":30.24593,"lng":-85.65661,"description":"This project resurfaces Kentucky Avenue from W 7th Street to W 10th Street.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3818,5085,5881)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"W 7th Street Repaving & Stormwater Improvements","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"W 7th Street Repaving & Stormwater Improvements","lat":30.247975,"lng":-85.657145,"description":"This project resurfaces W 17th Street from Carolina Avenue to Kentucky Avenue along with water system improvements.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3819)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Tennessee Ave Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"W 6th St to W 7th St","lat":30.24857,"lng":-85.65541,"description":"This project resurfaces Tennessee Avenue from W 6th Street to W 7th Street","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3820)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"W 6th Street Repaving & Sewer Improvments","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"W 6th Street Repaving & Sewer Improvments","lat":30.249245,"lng":-85.657865,"description":"This project resurfaces W 6th Street from Tennessee Avenue to the west end of the road along with sewer system improvements.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3821)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"W 5th St Repaving & Sewer Improvments","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"W 5th St Repaving & Sewer Improvments","lat":30.25054,"lng":-85.658845,"description":"This project resurfaces W 5th Street from Tennessee Avenue to the west end of the road along with sewer system improvements and replacement of fire hydrant at Montana Avenue.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3822)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Georgia Ave Repaving & Sewer Improvments","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Georgia Ave Repaving & Sewer Improvments","lat":30.251685,"lng":-85.651925,"description":"This project resurfaces Georgia Avenue from W 3rd Street to W 5th Street along with sewer system improvements.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3823)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"W 4th St Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"W 4th St Repaving","lat":30.251635,"lng":-85.64896,"description":"This project resurfaces W 4th St from Florida Avenue to Ohio Avenue.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3824)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Minnesota Avenue Repaving, Water, Sewer, & Stormwater Improvements","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Minnesota Avenue Repaving, Water, Sewer, & Stormwater Improvements","lat":30.24777,"lng":-85.64403,"description":"This project resurfaces Minnesota Avenue from E 2nd Street to E 9th Street along with sewer system improvements, sewer system improvements north of E 5th Street, and and stormwater improvements at E 8th Street.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3826,6718)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Pennsylvania Ave Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Pennsylvania Ave Repaving","lat":30.23989,"lng":-85.6476,"description":"This project resurfaces Pennsylvania Avenue from E 12th Street to E 13th Street.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3827,6716)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Indiana Ave Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Indiana Ave Repaving","lat":30.24294,"lng":-85.64527,"description":"This project resurfaces Indiana Avenue from E 10th Street to E 11th Stree.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3828)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E 13th Plaza Repaving & Water Improvements","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"E 13th Plaza Repaving & Water Improvements","lat":30.238015,"lng":-85.63181,"description":"This project resurfaces E 13th Plaza along with stormwater improvements.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3829)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E 14th Court Repaving & Water Improvements","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"E 14th Court Repaving & Water Improvements","lat":30.237105,"lng":-85.63183,"description":"This project resurfaces E 14th Court along with stormwater improvements.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3830)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Minnesota Avenue Repaving & Stormwater Improvements","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Minnesota Avenue Repaving & Stormwater Improvements","lat":30.229925,"lng":-85.64461,"description":"This project resurfaces Minnesota Avenue from W 17th Street to old railroad along with stormwater improvements.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3831)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E Pine Forest Drive Repaving & Stormwater Improvements","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"E Pine Forest Drive Repaving & Stormwater Improvements","lat":30.228274,"lng":-85.641378,"description":"This project resurfaces E Pine Forest Drive for its entire length along with stormwater improvements.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3833)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E Amy Street Repaving & Stormwater Improvements","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"E Amy Street Repaving & Stormwater Improvements","lat":30.22993,"lng":-85.64291,"description":"This project resurfaces E Amy Street for its entire length along with stormwater improvements.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3834)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Hummingbird Street Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Hummingbird Street Repaving","lat":30.22688,"lng":-85.642605,"description":"This project resurfaces Hummingbird Street for its entire length.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3835)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Sparrow Street Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Sparrow Street Repaving","lat":30.228405,"lng":-85.642935,"description":"This project resurfaces Sparrow Street for its entire length.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3836)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Tammy Street Repaving & Stormwater Improvements","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Tammy Street Repaving & Stormwater Improvements","lat":30.229165,"lng":-85.642925,"description":"This project resurfaces Tammy Street for its entire length along with stormwater improvements.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3837)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Redbird Street Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Redbird Street Repaving","lat":30.22764,"lng":-85.64296,"description":"This project resurfaces Redbird Street for its entire length.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3838)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Dundee Lane Repaving & Stormwater Improvements","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Dundee Lane Repaving & Stormwater Improvements","lat":30.226469,"lng":-85.632679,"description":"This project resurfaces E Pine Forest Drive for its entire length along with stormwater improvements between the creek and Highway 389 (East Avenue) and at Sutherland Court.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3839)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Pentland Road Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Pentland Road Repaving","lat":30.225473,"lng":-85.636947,"description":"This project resurfaces Pentland Road from E 24th Street to Sutherland Road.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3841)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Sutherland Plaza Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Sutherland Plaza Repaving","lat":30.22279,"lng":-85.63673,"description":"This project resurfaces Sutherland Plaza for its entire length","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3842)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E 24th Street Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"E 24th Street Repaving","lat":30.22219,"lng":-85.632845,"description":"This project resurfaces E 24th Street from Pentland Road to Highway 389 (East Avenue).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3843)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Petty Drive Repaving & Stormwater Improvements","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Petty Drive Repaving & Stormwater Improvements","lat":30.220898,"lng":-85.651477,"description":"This project resurfaces Petty Drive for its entire length along with stormwater improvements.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3844)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Easement Drive Repaving & Stormwater Improvements","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Easement Drive Repaving & Stormwater Improvements","lat":30.220305,"lng":-85.650235,"description":"This project resurfaces Easement Drive for its entire length along with stormwater improvements.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3845)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"W 26th Street Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"W 26th Street Repaving","lat":30.21867,"lng":-85.65585,"description":"This project resurfaces W 26th Street for its entire length.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3846)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"W Peachtree Drive Repaving & Water Improvements","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"W Peachtree Drive Repaving & Water Improvements","lat":30.22608,"lng":-85.65036,"description":"This project resurfaces W Peachtree Drive for its entire length with water system improvements.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3847)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E 7th Street Repaving & Sewer Improvments","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"E 7th Street Repaving & Sewer Improvments","lat":30.247795,"lng":-85.645685,"description":"This project resurfaces E 7th Street from Illinois Ave to SR 77 with sewer system improvements.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3849)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Tyndall Parkway Beautification","government":"City of Callaway","category":"Roadway Safety","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Tyndall Parkway Beautification","lat":30.156585,"lng":-85.59098,"description":"Using funds from the half-cent surtax, the City has a project for the beautification of Tyndall Parkway.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(4649)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"cw","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Cherry Street Reabilitation","government":"City of Callaway","category":"Resurfacing","status":"in_progress","pct_complete":15,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Cherry Street Reabilitation","lat":30.145475,"lng":-85.57855,"description":"Using funds from the half-cent surtax, the Cityis reabilitating and drainage of Cherry Street from Tyndall Parkway to Star Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(4650)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"cw","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"S Berthe Avenue Repaving (Cherry to Boat Race)","government":"City of Callaway","category":"Resurfacing","status":"unknown","pct_complete":null,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"S Berthe Avenue Repaving (Cherry to Boat Race)","lat":30.13822,"lng":-85.5745,"description":"Using funds from the half-cent surtax, the City Resurfaced is resurfacing S Berthe Ave from Cherry Street to Boat Race Rd.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(4651)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"cw","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"S Berthe Avenue Repaving (Boat Race to End of S Berthe Ave)","government":"City of Callaway","category":"Resurfacing","status":"unknown","pct_complete":null,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"S Berthe Avenue Repaving (Boat Race to End of S Berthe Ave)","lat":30.124245,"lng":-85.57464,"description":"Using funds from the half-cent surtax, the City is resurfacing S Berthe Ave from Boat Race Rd to the end of S Berthe Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(4652)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"cw","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Boatrace Rd Repaving (Tyndall Pkwy to S Berthe Ave)","government":"City of Callaway","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Tyndall Pkwy to S Berthe Ave","lat":30.13105,"lng":-85.582865,"description":"Using funds from the half-cent surtax, the City Resurfaced Boat Race Rd from Tyndall Pkwy to S Berthe Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(4653)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"cw","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Arthur Drive Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Arthur Drive Repaving","lat":30.244185,"lng":-85.667675,"description":"This project resurfaces Arthur Drive from Sallie Mae Drive to Maryland Avenue.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(4655)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Redbird Cir Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Redbird Cir Repaving","lat":30.228827,"lng":-85.645936,"description":"This project resurfaces Redbird Circle along its entire length.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(4656)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"W 19th Ct Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"W 19th Ct Repaving","lat":30.228935,"lng":-85.66064,"description":"This project resurfaces W 19th Court from Maine Avenue to eastern end.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(4658)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Rhode Island Ave Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Rhode Island Ave Repaving","lat":30.234015,"lng":-85.665965,"description":"This project resurfaces Rhode Island Avenue between W 14th Street and W 19th St.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(4659)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Massachusettes Ave Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Massachusettes Ave Repaving","lat":30.234,"lng":-85.66483,"description":"This project resurfaces Massachusettes Avenue between W 14th Street and W 19th St.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(4660)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Missouri Ave Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Missouri Ave Repaving","lat":30.253085,"lng":-85.65873,"description":"This project resurfaces Missouri Avenue between W 18th Street and W 19th St.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(4661,4662,5088,5089)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"MIssissippi Ave Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"MIssissippi Ave Repaving","lat":30.24731,"lng":-85.6372,"description":"This project resurfaces MIssissippi Avenue from E 8th Street to northern end.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(4663)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Texas Ave Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Texas Ave Repaving","lat":30.242755,"lng":-85.63387,"description":"This project resurfaces Texas Avenue between E 9th Street and E 12th Street.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(4664)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Wisconsin Ave Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Wisconsin Ave Repaving","lat":30.25153,"lng":-85.64166,"description":"This project resurfaces Wisconsin Avenue between E 13th Street and E 14th Street.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(4665,5106,5107,5108,5109)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E 3rd St Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"E 3rd St Repaving","lat":30.25288,"lng":-85.644605,"description":"This project resurfaces E 3rd Street between Ohio Avenue and Wisconsin Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(5065)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Arkansas Ave Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Arkansas Ave Repaving","lat":30.239,"lng":-85.63965,"description":"This project resurfaces Arkansas Avenue between E 12th Street and E 14th St.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(5067)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Cashel Mara Dr Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Cashel Mara Dr Repaving","lat":30.263562,"lng":-85.644529,"description":"This project resurfaces Cashel Mara Drive along its entire length.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(5070)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Colorado Ave Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Colorado Ave Repaving","lat":30.24343,"lng":-85.63614,"description":"This project resurfaces Colorado Avenue between Country Club Drive and E 8th Street.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(5071,5072)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E 17th St Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"E 17th St Repaving","lat":30.232815,"lng":-85.63694,"description":"This project resurfaces E 17th Street between Colorado Avenue and Mississippi Avenue.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(5073)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E 2nd St Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"E 2nd St Repaving","lat":30.253805,"lng":-85.64275,"description":"This project resurfaces E 2nd Street between Indiana Avenue and Iowa Avenue.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(5074)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E 4th St Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"E 4th St Repaving","lat":30.25152,"lng":-85.64167,"description":"This project resurfaces E 4th Street between Indiana Avenue and Iowa Avenue.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(5075)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E 6th St Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"E 6th St Repaving","lat":30.24903,"lng":-85.64231,"description":"This project resurfaces E 6th Street between Illinois Avenue and Wisconsin Avenue.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(5076)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E 8th St Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"E 8th St Repaving","lat":30.246395,"lng":-85.638365,"description":"This project resurfaces E 8th Street between Iowa Avenue and Colorado Avenue.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(5077)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Georgia Ave Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Georgia Ave Repaving","lat":30.23842,"lng":-85.652055,"description":"This project resurfaces Georgia Avenue between W 13th Street and W 14th Street.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(5079,5081,5879)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Illinois Ave Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Illinois Ave Repaving","lat":30.247765,"lng":-85.642885,"description":"This project resurfaces Illinois Avenue between E 5th Street and E 9th Street.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(5082,5884,5885)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Iowa Ave Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Iowa Ave Repaving","lat":30.25202,"lng":-85.640525,"description":"This project resurfaces Iowa Avenue between E 2nd Street and E 5th Street.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(5083,5084)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Louisiana Ave Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Louisiana Ave Repaving","lat":30.23898,"lng":-85.638505,"description":"This project resurfaces Louisiana Avenue between E 12th Street and E 14th Street.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(5086)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Mosley Dr Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Mosley Dr Repaving","lat":30.21129,"lng":-85.645785,"description":"This project resurfaces Mosley Drive between Highway 77 and Mosley High School.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(5090)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Ravenwood Ct Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Ravenwood Ct Repaving","lat":30.21645,"lng":-85.65725,"description":"This project resurfaces Ravenwood Court along its entire length.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(5091)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Tennessee Ave Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Tennessee Ave Repaving","lat":30.240025,"lng":-85.65558,"description":"This project resurfaces Tennessee Avenue between W 11th Street and W 14th Street.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(5092)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Texas Ave Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"E 8th St to E 9th St","lat":30.245705,"lng":-85.63381,"description":"This project resurfaces Texas Avenue between E 8th Street and E 9th Street.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(5093)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Virginia Ave Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Virginia Ave Repaving","lat":30.252355,"lng":-85.65419,"description":"This project resurfaces Virginia Avenue between W 10th Street and W 11th Street.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(5094,5095)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"W 11th St Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"W 11th St Repaving","lat":30.242285,"lng":-85.652185,"description":"This project resurfaces W 11th Street between Highway 77 and Tennessee Avenue.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(5096)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"W 12th St Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"W 12th St Repaving","lat":30.240805,"lng":-85.65672,"description":"This project resurfaces W 12th Street between Tennessee Avenue and Carolina Avenue.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(5097)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"W 15th St Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"W 15th St Repaving","lat":30.2362,"lng":-85.6568,"description":"This project resurfaces W 15th Street between Tennessee Avenue and Carolina Avenue.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(5098)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"W 3rd St Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"W 3rd St Repaving","lat":30.252965,"lng":-85.651895,"description":"This project resurfaces W 3rd Street from Alabama Avenue to the western end.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(5100)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"W 6th St Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"W 6th St Repaving","lat":30.24913,"lng":-85.65027,"description":"This project resurfaces W 6th Street between Florida Avenue and New York Avenue.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(5101)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"W 7th St Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"W 7th St Repaving","lat":30.247905,"lng":-85.65263,"description":"This project resurfaces W 7th Street between Highway 77 and Kentucky Avenue.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(5102)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"W 8th Cir Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"W 8th Cir Repaving","lat":30.246313,"lng":-85.659433,"description":"This project resurfaces W 8th Circle along its entire length.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(5103)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"W 9th St Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"W 9th St Repaving","lat":30.2454,"lng":-85.654905,"description":"This project resurfaces W 9th Street between Alabama Avenue and Kentucky Avenue.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(5104)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"East Avenue Road Reconstruction","government":"City of Panama City","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":" ","lat":30.14315,"lng":-85.625175,"description":"Due to the installation of utilities for the new Port facility, the road will be damaged. This project will include the reconstruction of East Ave from south of Cherry St to the new Port facility. In addition, the new roadway will be designed to accommo","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(5465)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"4th Street Reconstruction Design","government":"City of Panama City","category":"Resurfacing","status":"in_progress","pct_complete":5,"promised_cost":1250000.0,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"4th Street Reconstruction Design","lat":30.15517,"lng":-85.65504,"description":"These funds will provide for the design of the subject project. Project consists of reconstructing 4th Street between Luverne Avenue and Cove Boulevard. This street consists of a concrete pavement overlaid by asphalt.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(5469)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Baker Ct Utility Improvements","government":"City of Panama City","category":"Capacity Improvement","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":" ","lat":30.16592,"lng":-85.680599,"description":"Due to aging water and sewer lines with heavy tuberculation, this project will replace water and sewer lines that serve residents on 10th St and Baker Ct. The road will also be repaved.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(5865)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"New York Ave Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"New York Ave Repaving","lat":30.239955,"lng":-85.65103,"description":"This project resurfaces New York Avenue between W 11th St and W 14th Street.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(5880)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Philip Griffitts Sr. Parkway","government":"City of Panama City Beach","category":"Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Philip Griffitts Sr. Parkway","lat":30.228481,"lng":-85.854569,"description":"This project is the connection of Bay Parkway Phase 1 eastward down the power line easement and ties into Nautilus St. This will be a public roadway with associated connector road crossing to help facilitate movement from east to west.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6279)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E 9th Street Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"E 9th Street Repaving","lat":30.24528,"lng":-85.645745,"description":"This project resurfaces E 9th Street from Illinois Ave to SR 77.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6282)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Michigan Ave Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Michigan Ave Repaving","lat":30.2478,"lng":-85.646305,"description":"This project resurfaces Michigan Avenue between E 5th Street and E 9th Street.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6715)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Florida Ave Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Florida Ave Repaving","lat":30.23531,"lng":-85.64998,"description":"This project resurfaces Florida Avenue between W 14th St and W 17th Street.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6719)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Florida Ave Repaving 2","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Florida Ave Repaving 2","lat":30.24147,"lng":-85.649865,"description":"This project resurfaces FloridaAvenue between W 10th St and W 13th Street.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6720)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"11th Street Drainage, Sewer, & Easements","government":"City of Panama City","category":"Stormwater Improvement","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"11th Street Drainage, Sewer, & Easements","lat":30.168045,"lng":-85.683775,"description":"This project provides for the drainage and sewer improvements along W 11th St from Balboa Ave to Frankford Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6723)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E 6th Plaza","government":"City of Springfield","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"School Ave to Everitt Ave","lat":30.160245,"lng":-85.618665,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, 6th Plaza repaved from School Ave. to Evirett Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6724)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Road Improvements","government":"City of Springfield","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Road Improvements","lat":30.159365,"lng":-85.60918,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, 6th Plaza will be repaved from Transmitter to Harlem Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6725)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"School Ave Resurfacing","government":"City of Springfield","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"School Ave Resurfacing","lat":30.164455,"lng":-85.616485,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is making improvements is resurfacing School Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6726)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"School Ave Gravity Line Replacement","government":"City of Springfield","category":"Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"School Ave Gravity Line Replacement","lat":30.164045,"lng":-85.61649,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replaceing a portion of the gravity sewer main on School Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6727)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Greentree Rd Gravity Line Replacement","government":"City of Springfield","category":"Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Greentree Rd Gravity Line Replacement","lat":30.165001,"lng":-85.61947,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replaceing the gravity sewer main on Greentree Rd.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6728,6729)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Huntington Dr Gravity Line Replacement","government":"City of Springfield","category":"Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Hunington - 8th St","lat":30.165834,"lng":-85.617831,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replaceing the gravity sewer main on Huntington Dr.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6730)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"School Ave Resurfacing","government":"City of Springfield","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"School Ave","lat":30.165875,"lng":-85.61645,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is resurfacing School Ave. 8th St - 11th St.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6731)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Transmitter Ave","government":"City of Springfield","category":"Utility Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Transmitter Road","lat":30.171965,"lng":-85.6077,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city made improvements to water & sewer lines on Transmitter Rd.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6732)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Wakulla Ave","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Douglas Rd to Ten Acre Rd","lat":30.19326,"lng":-85.621815,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is resufacing Wakulla Ave. Water and sewer updates will be made in conjunction with this project.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6733)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility & Road Improvements","government":"City of Springfield","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Ormond Ave","lat":30.195985,"lng":-85.61658,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is making improvements is resurfacing Ormond Ave. Water and sewer updates .","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6734)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Sanders Ln","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"8th St to E 11th St","lat":30.165775,"lng":-85.612125,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water lines - and resurfacing Sanders Ln (8th St - 11th St).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6735)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"13th Ct","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"Bob Little Rd to End","lat":30.171615,"lng":-85.598425,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water - lines & road paving 13 Ct.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6736)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"Evergreen Ct","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"Delisa Ave to End","lat":30.17135,"lng":-85.6005,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water, sewer lines & road paving - Evergreen Ct.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6737)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"Delisa Ct","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"Delisa Ave to End","lat":30.172055,"lng":-85.602225,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water, sewer lines & road paving - Delisa Ct.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6738)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"Ridgewood Ave","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"E 14th St to E 15th St","lat":30.173885,"lng":-85.601035,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water lines & road paving - Ridgewood Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6739)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"E 14th St","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"Transmitter Rd to Tyndall Pkwy","lat":30.172995,"lng":-85.600365,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water, sewer lines and road paving on 14th st (Transmitter Rd to 15th St).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6740)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"E 13th Ct","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"Transmitter Rd to E 14th St","lat":30.171874,"lng":-85.605173,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water lines & road paving - 13th Ct.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6741)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"David Ave","government":"City of Springfield","category":"Resurfacing","status":"in_progress","pct_complete":35,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"David Ave","lat":30.162202,"lng":-85.605403,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is making improvements to water & sewer lines on David Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6742)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Delisa Ave","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"Bob Little Rd to E 14th St","lat":30.170907,"lng":-85.601522,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water, sewer lines & road paving - Delisa Ave","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6743)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"Allegheny Ave","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"E 14th St to E 15th St","lat":30.17391,"lng":-85.60208,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water lines & road paving - Allegheny Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6744)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"13th St","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"Bob Little Rd to End","lat":30.171125,"lng":-85.598425,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water lines & road paving - 13th St.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6745)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"24\" Stormwater Pipe","government":"City of Springfield","category":"Stormwater Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Lake Charles Blvd","lat":30.163705,"lng":-85.60044,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is making improvements to Stormwater lines and culverts replacement - Lake Charles (Bob Little Rd - Flight Ave).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6746)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Luckie Ave","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"E 14th St to E 15th St","lat":30.173925,"lng":-85.604455,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water, sewer lines & road paving - Luckie Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6747)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"Twin Pines Ln","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"E 14th St to End","lat":30.173485,"lng":-85.603125,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water lines & road paving - Twin Pines.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6748)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Poinsettia Dr","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Poinsettia Dr","lat":30.20697,"lng":-85.854584,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6749)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Escanaba Ave","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Escanaba Ave","lat":30.231488,"lng":-85.880803,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6750)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Lynn St","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Cathy Pl to S Vestavia St","lat":30.235995,"lng":-85.911795,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6753)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"CATHY PL","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"CATHY PL","lat":30.235305,"lng":-85.911815,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6754)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Villa Ct","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Villa Ct","lat":30.22635,"lng":-85.880645,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6756)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"San Gabriel St","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"San Gabriel St","lat":30.226535,"lng":-85.8844,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6757)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Sundial St","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Sundial St","lat":30.232068,"lng":-85.904229,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6758)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Santo Thomas Dr","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Santo Thomas Dr","lat":30.227705,"lng":-85.886735,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6759)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Fernwood St","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Fernwood St","lat":30.200405,"lng":-85.839845,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6762)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Habanero Ave","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Habanero Ave","lat":30.225295,"lng":-85.88011,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6765)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Half Acre Ln","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Half Acre Ln","lat":30.230095,"lng":-85.882405,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6766)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"SKY AVE","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"SKY AVE","lat":30.224445,"lng":-85.88012,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6767)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Castile Ave","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Castile Ave","lat":30.226821,"lng":-85.881742,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6768)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"CASTILE CIR","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"CASTILE CIR","lat":30.22664,"lng":-85.882225,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6769)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Dogwood St","government":"City of Panama City Beach","category":"Resurfacing","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Front Beach Rd to Hibiscus St","lat":30.198135,"lng":-85.84149,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6770)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"HIBISCUS AVE","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"HIBISCUS AVE","lat":30.211175,"lng":-85.856555,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6779)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Gardenia  St","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Gardenia  St","lat":30.20036,"lng":-85.838985,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6783)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"SUNTIME ST","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"SUNTIME ST","lat":30.23267,"lng":-85.90355,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6786)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Oleander Ct","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Oleander Ct","lat":30.211835,"lng":-85.85593,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6787)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Lakeside Cir","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Lakeside Cir","lat":30.227546,"lng":-85.882177,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6798)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"EL CENTRO BLVD","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"EL CENTRO BLVD","lat":30.22668,"lng":-85.885275,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6800)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Poinsettia Ct","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Poinsettia Dr to Dead end","lat":30.207035,"lng":-85.85603,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6804)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Windridge Ln","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Windridge Ln","lat":30.214945,"lng":-85.861275,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6808)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Sandalwood Ln","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Sandalwood Ln","lat":30.214715,"lng":-85.860275,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6810)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Woodtrail Dr","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Woodtrail Dr","lat":30.21451,"lng":-85.860485,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6812)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Loblorry Ct","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Summerwood Dr to End","lat":30.21529,"lng":-85.85904,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6813)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Sundial Ct","government":"City of Panama City Beach","category":"Resurfacing","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Sundial Ct","lat":30.23369,"lng":-85.904295,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6819)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Sands St","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Sands St","lat":30.23474,"lng":-85.911135,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6825)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Connector Rd","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Half Acre Ln to Escanaba Ave","lat":30.231445,"lng":-85.882035,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6827)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"SHADOW BAY DR","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"SHADOW BAY DR","lat":30.2258,"lng":-85.843285,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6830)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Colony Harbour Rd","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Colony Harbour Rd","lat":30.226805,"lng":-85.84328,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6831)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Colony Bay Harbour Dr","government":"City of Panama City Beach","category":"Resurfacing","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Colony Bay Harbour Dr","lat":30.2261,"lng":-85.84353,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6832)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Evergreen St","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Evergreen St","lat":30.20402,"lng":-85.840855,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6835)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Sunset Cir","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Twilight Bay Dr to Dead end","lat":30.22592,"lng":-85.84042,"description":"Funded by Half-Cent Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6837)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Fairway Cir","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Fairway Blvd to End","lat":30.211825,"lng":-85.844445,"description":"This project resurfaces Fairway Circle from Fairway Blvd to the end of cul-de-sac.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6838)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Edna St","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Edna St","lat":30.20123,"lng":-85.83884,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6839)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Fernwood Pl","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Fernwood St to Dead end","lat":30.20126,"lng":-85.840515,"description":"This project resurfaces Fernwood Place from Edna St to the end of cul-de-sac.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6840)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Aaron Bessant Acess Rd","government":"City of Panama City Beach","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Aaron Bessant Acess Rd","lat":30.219845,"lng":-85.8765,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6841)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pcb","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Star Avenue Forcemain","government":"City of Panama City","category":"Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Line - Star Ave from Nadine Rd to North of Nehi Rd","lat":30.228035,"lng":-85.556835,"description":"Installation of new forcemain to serve existing and future development in Panama City North.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6842)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Harrison Streetscape Project - Phase 1","government":"City of Panama City","category":"Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":" Harrison Ave between Government Street and 4th Street","lat":30.154205,"lng":-85.66164,"description":"Reconstruction of Harrison Avenue from Government Street to 4th Street, including replacing water and sewer infrastructure.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6843)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Highway 390 Utilities Replacement","government":"City of Panama City","category":"Utility Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"Completed FY2021","location":" ","lat":30.197426,"lng":-85.684757,"description":"Relocation of underground utilities along S.R. 390 between 23rd Street and Jackson Way for the Florida Department of Transportation's S.R. 390 Widening Project.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6844)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"FDOT Manhole Replacement","government":"City of Panama City","category":"Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Beck Avenue from US98 to W. 9th Street to W. Beach Drive.","lat":30.164715,"lng":-85.68992,"description":"Installation of 49 manholes, 23 valve box adjustments and water main relocation between S.R. 30 (USB 98) from S.R. 30A (U.S. 98 to west of S.R. 75 (U.S. 231/Harrison Avenue).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6845)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Lindenwood Dr","government":"City of Panama City","category":"Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":" ","lat":30.186787,"lng":-85.680095,"description":"Reconstruction of the existing roadway, drainage infrastructure, and water and sewer utilities for Lindenwood Drive, approximately 2,250 linear feet.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6846)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Harrison Avenue Water Main Upgrade","government":"City of Panama City","category":"Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Harrison Ave from 6th to 7th","lat":30.159765,"lng":-85.66034,"description":"Upgrade of approx 650 LF of 6\" watermain to 12\" watermain on Harrison from 6th to 7th Street inorder to increase fire flow to the area south of 7th and Harrison and adjacent blocks to Harrison.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6847)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Cherry St Utilities","government":"City of Panama City","category":"Capacity Improvement","status":"in_progress","pct_complete":30,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":" ","lat":30.139953,"lng":-85.644831,"description":"This project consists of replacing water mains, force mains, and gravity mains along Cherry St from Beach Dr to Tyndall Dr, as well as Corto St and S Palo Alto.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6848,6849,6850)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Cherry St Utilities","government":"City of Panama City","category":"Capacity Improvement","status":"in_progress","pct_complete":81,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Cherry Street Between Beach Dr East to Water","lat":30.145995,"lng":-85.64657,"description":"This project consists of replacing water mains, force mains, and gravity mains along Cherry St from Beach Dr to Tyndall Dr, as well as Corto St and S Palo Alto.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6851)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Panama City North Sewer Forcemain","government":"City of Panama City","category":"Utility Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"West of 114A Airport Rd","lat":30.184418,"lng":-85.658989,"description":"Installation of sewer force main to serve new developments in Panama City North.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6852)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"39th Street Sewer","government":"City of Panama City","category":"Utility Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"W 39th St  (West of SR 390)","lat":30.218605,"lng":-85.670575,"description":"Additional work as part of the Highway 390 Utilities Replacement Project. The project installed a new 10\" directional bore force main for connection to Lift Station #102.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6853)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Betty Lane","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"E 15th St to Dead End","lat":30.1731,"lng":-85.610505,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is improving the water system and roads in this Betty Lane area.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6854)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility & Road Improvements","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Greentree Ave","lat":30.16445,"lng":-85.620205,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing Greentree gravity line (Everritt - Forestdale).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6855)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"David Ave","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"E 14th St to E 15th St","lat":30.17392,"lng":-85.60613,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water, sewer lines & road paving - David Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6856)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"Utility Improvements","government":"City of Springfield","category":"Utility Improvement","status":"in_progress","pct_complete":90,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Etheridge Ave","lat":30.172395,"lng":-85.59264,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing Replace / Upgrade water lines - Etheridge Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6858)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility Improvements","government":"City of Springfield","category":"Utility Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Wakulla Ave (2811, 2813, 2815, 2817)","lat":30.19914,"lng":-85.622845,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing the gravity sewer main on Huntington Dr.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6860)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"7th St and Sanders Ln","government":"City of Springfield","category":"Utility Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"7th St. & Sanders Ln.","lat":30.162245,"lng":-85.611445,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is making improvements to the water & sewer system in this area (7th & Sanders Ln).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6861)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Hammond Dr","government":"City of Springfield","category":"Utility Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"12th St & Hammonds Dr","lat":30.169715,"lng":-85.597405,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing the gravity sewer main on Hammond Dr.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6863)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Alabama Ave Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Alabama Ave – 17th St to Mowat School Road","lat":30.23119,"lng":-85.65349,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6866)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Virginia Ave Repaving","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Virginia Ave – 17th to Mowat school Road","lat":30.23043,"lng":-85.654625,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6867)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Illinois Ave Pavement","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Illinois Ave – SR-390 to 17th Street","lat":30.235215,"lng":-85.643135,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6869)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Minnesota Ave Pavement","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Minnesota Ave – 24th to 25th Street","lat":30.22125,"lng":-85.64526,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6870)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"25th St Pavement","government":"City of Lynn Haven","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"25th Street – SR 77 to Minnesota Ave.","lat":30.220425,"lng":-85.64738,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6872)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility Improvements","government":"City of Springfield","category":"Utility Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Utility Improvements","lat":30.1622,"lng":-85.609975,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city has made improvements to the water and sewer system in this area. Additionally, 8th St from Transmitter Rd to School Ave, was resurfaced.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6873)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Road Improvements","government":"City of Springfield","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Harlem Ave. between 5th St & 7th St","lat":30.158555,"lng":-85.610605,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is upgrading Water Main on Harlem Ave. between 5th St & 7th St.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6874)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility Improvements","government":"City of Springfield","category":"Utility Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Wheat Rd (Avon Rd - Lane Rd)","lat":30.195415,"lng":-85.60382,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city installed new Sewer4\" sewer line Wheat Rd (Avon Rd - Lane Rd).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6875)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Central Ave","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"Cherry St to End","lat":30.147245,"lng":-85.61796,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water, sewer lines & road paving - Central Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6877)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"Wabash Ave","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"Cherry St to E Business Hwy 98","lat":30.147326,"lng":-85.616969,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water, sewer lines & road paving - Wabash Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6879)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"E 4th St","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"Everitt Ave to E Business Hwy 98","lat":30.15492,"lng":-85.62002,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water, sewer lines & road paving - 4th St (Everitt Ave - US Bus 98).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6880)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"E 2nd Plz","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"N Everitt Ave to E Business Hwy 98","lat":30.15221,"lng":-85.61882,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, Replace water, sewer lines & road paving - 2nd Plaza (Everitt Ave - US Bus 98).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6881)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"E 2nd Ct","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"N Everitt Ave to E Business Hwy 98","lat":30.15035,"lng":-85.618475,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water, sewer lines & road paving - 2nd Ct (Everitt Ave - US Bus 98).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6882)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"E 2nd St","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"N Everitt Ave to E Business Hwy 98","lat":30.14939,"lng":-85.618395,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water, sewer lines & road paving - 2nd St (Everitt Ave - US Bus 98).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6883)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"Utility & Road Improvements","government":"City of Springfield","category":"Utility  and Road Improvement","status":"in_progress","pct_complete":35,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"St John St","lat":30.147845,"lng":-85.61363,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water, sewer lines & road paving - St John St (Wabash - Us Bus 98).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6884)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E 2nd Pl","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"N Everitt Ave to E Business Hwy 98","lat":30.151255,"lng":-85.618605,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water, sewer lines & road paving - 2nd Place (Everitt Ave - US Bus 98).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6885)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"Springfield Ave","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"Cherry St to E Business Hwy 98","lat":30.15035,"lng":-85.619135,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is Replace water, sewer lines & road paving - Springfield Ave (Cherry St - US Bus. 98).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6886)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"N Everitt Ave","government":"City of Springfield","category":"Utility Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"Cherry St to US Bus Hwy 98","lat":30.150835,"lng":-85.620995,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water sewer lines - Everitt Ave (Cherry St - US Bus. 98).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6887)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"Magnolia Beach Road Roadway Safety Project","government":"Bay County","category":"Roadway Safety","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Magnolia Beach Road Roadway Safety Project","lat":30.158915,"lng":-85.747605,"description":"This project will include the addition of a sidewalk along Magnolia Beach Rd from Delwood Beach Rd east to the end of the roadway. This will provide for safe pedestrian connectivity to the recently completed multi-use path along Magnolia Beach Dr to the many neighborhoods along the eastern section of Magnolia Beach Dr.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6892,6893)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Merritt Brown Road Sidewalk","government":"Bay County","category":"Roadway Safety","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Merritt Brown Road Sidewalk","lat":30.23923,"lng":-85.562105,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6894)&outFields=*&outSR=4326&f=json","schedule_programmed_total":595229,"schedule_fy_amounts":{"2020":595229},"schedule_line":"Merritt Brown Road Sidewalk","schedule_match_method":"exact name","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Utility & Road Improvements","government":"City of Springfield","category":"Utility  and Road Improvement","status":"in_progress","pct_complete":35,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Lane Rd","lat":30.1943,"lng":-85.60562,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing sewer lines & road paving - Lane Rd.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6896)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility & Road Improvements","government":"City of Springfield","category":"Utility  and Road Improvement","status":"in_progress","pct_complete":35,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Usery Rd","lat":30.19543,"lng":-85.605745,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing sewer lines & road paving - Usery Rd.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6897)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility & Road Improvements","government":"City of Springfield","category":"Utility  and Road Improvement","status":"in_progress","pct_complete":35,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Pearcy Rd","lat":30.19542,"lng":-85.6048,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing sewer lines & road paving - Pearcy Rd.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6898)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility & Road Improvements","government":"City of Springfield","category":"Utility  and Road Improvement","status":"in_progress","pct_complete":35,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Flight Ave","lat":30.16341,"lng":-85.601225,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replace water lines South Flight Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6900,6904)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility & Road Improvements","government":"City of Springfield","category":"Utility  and Road Improvement","status":"in_progress","pct_complete":35,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Barton Ave","lat":30.15858,"lng":-85.601045,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water lines Barton Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6901)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility & Road Improvements","government":"City of Springfield","category":"Utility  and Road Improvement","status":"in_progress","pct_complete":35,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Martin Ct","lat":30.15724,"lng":-85.600535,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is rehabing the manholes on E 5th St between School Ave and Springfield Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6902)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility & Road Improvements","government":"City of Springfield","category":"Utility  and Road Improvement","status":"in_progress","pct_complete":35,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Joan Ln","lat":30.164695,"lng":-85.60049,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing sewer lines & road paving - Joan Ln.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6903)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility & Road Improvements","government":"City of Springfield","category":"Utility  and Road Improvement","status":"in_progress","pct_complete":35,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Kevin Ct","lat":30.166461,"lng":-85.600972,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing sewer lines & road paving - Kevin Ct.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6905)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility & Road Improvements","government":"City of Springfield","category":"Utility  and Road Improvement","status":"in_progress","pct_complete":35,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Taylor Dr","lat":30.16482,"lng":-85.59791,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing sewer lines & road paving - Taylor Dr","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6906)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility & Road Improvements","government":"City of Springfield","category":"Utility  and Road Improvement","status":"in_progress","pct_complete":35,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Bonnie Dr","lat":30.16481,"lng":-85.59688,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing sewer lines & road paving - Bonnie Dr.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6907)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility & Road Improvements","government":"City of Springfield","category":"Utility  and Road Improvement","status":"in_progress","pct_complete":35,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Colorado Ln","lat":30.150975,"lng":-85.601735,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water, sewer lines & road paving - Colorado Ln.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6908)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility & Road Improvements","government":"City of Springfield","category":"Utility  and Road Improvement","status":"in_progress","pct_complete":35,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Russell Ln","lat":30.150115,"lng":-85.601675,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water, sewer lines & road paving - Russell Ln.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6909)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility & Road Improvements","government":"City of Springfield","category":"Utility  and Road Improvement","status":"in_progress","pct_complete":35,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Leslie Ln","lat":30.1492,"lng":-85.60159,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water, sewer lines & road paving - Leslie Ln.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6910)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility & Road Improvements","government":"City of Springfield","category":"Utility  and Road Improvement","status":"in_progress","pct_complete":35,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Cherry Ln","lat":30.14832,"lng":-85.601695,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water, sewer lines & road paving - Cherry Ln.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6911)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility & Road Improvements","government":"City of Springfield","category":"Utility  and Road Improvement","status":"in_progress","pct_complete":35,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Sue Lane","lat":30.147405,"lng":-85.602675,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water, sewer lines & road paving - Sue Ln.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6912)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility & Road Improvements","government":"City of Springfield","category":"Utility  and Road Improvement","status":"in_progress","pct_complete":35,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Holly Ln","lat":30.14651,"lng":-85.60298,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water, sewer lines & road paving - Holly Ln.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6913)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility & Road Improvements","government":"City of Springfield","category":"Utility  and Road Improvement","status":"in_progress","pct_complete":35,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Moody Dr","lat":30.146965,"lng":-85.601335,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water, sewer lines & road paving - Moody Dr.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6914)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility & Road Improvements","government":"City of Springfield","category":"Utility  and Road Improvement","status":"in_progress","pct_complete":35,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Bob Little Rd (22A)","lat":30.1496,"lng":-85.599605,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water lines - Bob Little Rd (Colorado Ln - Cherry St).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6915)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Royal Cir","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"Cherry St to End","lat":30.14537,"lng":-85.604885,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water, sewer lines & road paving - Royal Cir.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6916)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"Laramie Cir","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"Cherry St to end","lat":30.145355,"lng":-85.60377,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water, sewer lines & road paving - Laramie Cir.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6917)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"Bonanza Cir","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":101,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"Cherry St to End","lat":30.145365,"lng":-85.60199,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water, sewer lines & road paving - Bonanza Cir.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6918)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"Eldorado Cir","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"Cherry St to End","lat":30.145375,"lng":-85.60086,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water, sewer lines & road paving - El Dorado Cir.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6919)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"Utility & Road Improvements","government":"City of Springfield","category":"Utility  and Road Improvement","status":"in_progress","pct_complete":35,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Detroit Ave","lat":30.165825,"lng":-85.609945,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water lines - Detroit Ave (8th St - 11th St).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6921)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility & Road Improvements","government":"City of Springfield","category":"Utility  and Road Improvement","status":"in_progress","pct_complete":35,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Transmitter Rd","lat":30.166755,"lng":-85.60787,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water lines - Transmitter Rd (9th St - 11th St)","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6922)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility & Road Improvements","government":"City of Springfield","category":"Utility  and Road Improvement","status":"in_progress","pct_complete":35,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"10th St","lat":30.166765,"lng":-85.608875,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water lines - 10th St (Detroit Ave - Transmitter Rd).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6923)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility & Road Improvements","government":"City of Springfield","category":"Utility  and Road Improvement","status":"in_progress","pct_complete":35,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"9th ST","lat":30.165795,"lng":-85.611025,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water lines - 9th St (Sanders Ln - Transmitter Rd).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6924)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"8th St","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Transmitter Rd to School Ave","lat":30.16405,"lng":-85.61214,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water and sewer lines - 8th St.,Additionally, 8th St from Transmitter Rd to School Ave, was resurfaced.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6925)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility & Road Improvements","government":"City of Springfield","category":"Utility  and Road Improvement","status":"in_progress","pct_complete":35,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"8th Ct","lat":30.164955,"lng":-85.611045,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water lines - 8th Ct (Sanders Ln - Detroit Ave).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6926)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility Improvements","government":"City of Springfield","category":"Stormwater Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"N. Everitt Ave; Greentree Rd to Huntington Dr","lat":30.165555,"lng":-85.62082,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city improved Stormwater on N Everitt Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6927)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility Improvements","government":"City of Springfield","category":"Capacity Improvement","status":"in_progress","pct_complete":50,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Transmitter Rd","lat":30.173295,"lng":-85.60788,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is Install new water main - Transmitter Rd (13th Ct - 15th St).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6928)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Cherry St Phase 2","government":"City of Panama City","category":"Capacity Improvement","status":"in_progress","pct_complete":54,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Cherry Street Between Beach Dr East to Water","lat":30.14607,"lng":-85.64657,"description":"This project consists of replacing water mains, force mains, and gravity mains along Cherry St from Beach Dr to Tyndall Dr, as well as Corto St and S Palo Alto.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6929)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E Business Hwy 98 Water Line","government":"City of Springfield","category":"Utility Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"E 3rd St to Cherry St","lat":30.151857,"lng":-85.616555,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water lines - US Bus. 98 ( 3rd St - Wabash Ave).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6930)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"Utility & Road Improvements","government":"City of Springfield","category":"Utility  and Road Improvement","status":"in_progress","pct_complete":35,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Arlington Dr","lat":30.149234,"lng":-85.603643,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water, sewer lines & road paving - Cherry Ln.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6931)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Poston Ave","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"Cherry St to End","lat":30.14671,"lng":-85.62019,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water, sewer lines & road paving - Poston Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6932)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"Utility & Road Improvements","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Huntington Dr & Greentree Ave.","lat":30.16541,"lng":-85.616465,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city replaced School Ave gravity line (Hunington - 8th St).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6933)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Lance St - 2023","government":"City of Parker","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"From N 11th St to S Tyndall Pkwy","lat":30.13291,"lng":-85.593315,"description":"Using funds from the half-cent surtax, the City Resurfaced Lance St from Tyndall Pkway to N 11th St.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6934)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"parker","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Boatrace Road - 2023","government":"City of Parker","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"From Tyndall  Pkwy to  N 11th St","lat":30.13108,"lng":-85.593335,"description":"Using funds from the half-cent surtax, the City Resurfaced Boatrace Road from Tyndall Pkwy to N 11th St.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6935)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"parker","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Thornton Ln - 2024","government":"City of Parker","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"From Soule Dr to S Tyndall Pkwy","lat":30.126869,"lng":-85.593438,"description":"Using funds from the half-cent surtax, the City Resurfaced Thornton Ln From Soule Dr to S Tyndall Pkwy.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6936)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"parker","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Cherry St/Tyndall Pkwy Water Bore","government":"City of Callaway","category":"Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Cherry St and Tyndall Pkwy","lat":30.145555,"lng":-85.59112,"description":"Using funds from the half-cent surtax, the City had a Water Bore project at Cherry St and Tyndall Pkwy to Loop the Water Distribution system.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6938)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"cw","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Boat Race Rd Resurfacing","government":"City of Callaway","category":"Resurfacing","status":"in_progress","pct_complete":25,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Boat Race Rd from S. Berthe Ave to Hugh Dr","lat":30.13074,"lng":-85.570715,"description":"Using funds from the half-cent surtax, the City Resurfaced Boat Race Rd from Berthe Ave to Hugh Dr.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6939)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"cw","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Enzor St Resurfacing","government":"City of Callaway","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Enzor St from Tyndall Pkwy to S Kimbrel Ave","lat":30.132865,"lng":-85.586915,"description":"Using funds from the half-cent surtax, the City Resurfaced Enzor St from Tyndall Pkwy to S Kimbrel Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6940)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"cw","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Cardiff Ct Resurfacing","government":"City of Callaway","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Cardiff Ct from Courtford Dr to Cul-de-Sac","lat":30.14158,"lng":-85.563215,"description":"Using funds from the half-cent surtax, the City Resurfaced Cardiff Ct from Courtford Dr to Cul-de-Sac.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6941)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"cw","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Imperial Dr Resurfacing","government":"City of Callaway","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Emperial Dr  from Seminole Dr to Dead end","lat":30.13674,"lng":-85.581535,"description":"Using funds from the half-cent surtax, the City Resurfaced Imperial Dr.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6942)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"cw","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Loop Rd Resurfacing","government":"City of Callaway","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Loop Rd - Sports Complex (500 Callaway Park Way)","lat":30.156595,"lng":-85.54739,"description":"Using funds from the half-cent surtax, the City Resurfaced Loop Rd - Sports Complex (500 Callaway Park Way).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6943)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"cw","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Big Oak Ln Resurfacing","government":"City of Callaway","category":"Resurfacing","status":"in_progress","pct_complete":25,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Big Oak Ln from Cherry St to Dead end","lat":30.146422,"lng":-85.569016,"description":"Using funds from the half-cent surtax, the City will be Resurfacing Big Oak Ln from Cherry St to Dead end.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6944)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"cw","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Enzor St Paving","government":"City of Callaway","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Enzor St","lat":30.132755,"lng":-85.57672,"description":"Using funds from the half-cent surtax, the City Paved Enzor St.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6946)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"cw","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Wallace Road Sidewalk","government":"City of Callaway","category":"Roadway Safety","status":"unknown","pct_complete":null,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Wallace Rd (Tyndall Pkwy / Berthe Ave)","lat":30.12368,"lng":-85.582825,"description":"Using funds from the half-cent surtax, the City of Callaway Rehabilitated Wallace Rd sidewalks.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6947)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"cw","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Boat Race Road Multi-Use Path","government":"City of Callaway","category":"Roadway Safety","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Boat Race Road Multi-Use Path","lat":30.13099,"lng":-85.582845,"description":"Using funds from the half-cent surtax, the City improved Boat Race Road Multi-Use Path.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6950)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"cw","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Titus Rd","government":"Bay County","category":"Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"County Road 2321 To State Road 390 Connector Road","lat":30.246748,"lng":-85.583692,"description":"This project will include the construction of a new roadway from County Road 2321 at Titus Road to State Road 390. County Road 2321 is heavily trafficked by vehicles trying to access U.S. Highway 231. The new roadway will allow for safer and more efficient access to State Road 390 and on to U.S. Highway 231 while also providing a second route for vehicles to access County Road 2321.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6957)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Bay Parkway  Phase III","government":"Bay County","category":"Capacity Improvement","status":"in_progress","pct_complete":10,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"From N Clara Ave to Alf Coleman Rd ","lat":30.21247,"lng":-85.823975,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6963)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"County Road 30 (Front Beach Road) Safety Projcet","government":"Bay County","category":"Roadway Safety","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"Kelly St to US 98","lat":30.258717,"lng":-85.967679,"description":"This project will include the addition of a sidewalk along County Road 30 (Front Beach Road) from Kelly Street to US 98. This will allow for safe pedestrian connectivity to the many neighborhoods along Front Beach Road.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6964)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Lake Dr - 2023","government":"City of Parker","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"From N 9th Plz to N 9th St","lat":30.134715,"lng":-85.601365,"description":"Using funds from the half-cent surtax, the City Resurfaced Lake Dr from N 9th Plz to N 9th St.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6968)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"parker","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Lake Dr - Water Main - 2021","government":"City of Parker","category":"Utility Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"5440 Lake Dr to Hickory St","lat":30.1365,"lng":-85.592265,"description":"Fire Protection and water quality.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6969)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"parker","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"N 9th St Resurfacing - 2018","government":"City of Parker","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"From Hickory St. to S Lakewood Dr","lat":30.138835,"lng":-85.60217,"description":"The streets were detriorated, presented safety hazards, and drainage from some of the streets is inadequate. The deteriorated streets presented a bad appearance for potencial residents and businesses","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6970)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"parker","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Cedar St Resurfacing - 2018","government":"City of Parker","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Cedar St","lat":30.13311,"lng":-85.6106,"description":"The streets were detriorated, presented safety hazards, and drainage from some of the streets is inadequate. The deteriorated streets presented a bad appearance for potencial residents and businesses","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6971)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"parker","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Collins Dr Resurfacing - 2018","government":"City of Parker","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Cedar St","lat":30.12687,"lng":-85.592711,"description":"The streets were detriorated, presented safety hazards, and drainage from some of the streets is inadequate. The deteriorated streets presented a bad appearance for potencial residents and businesses","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6972)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"parker","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Horne Ave Resurfacing - 2018","government":"City of Parker","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Horne Ave","lat":30.13379,"lng":-85.611735,"description":"The streets were detriorated, presented safety hazards, and drainage from some of the streets is inadequate. The deteriorated streets presented a bad appearance for potencial residents and businesses","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6973)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"parker","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Maine St Resurfacing - 2018","government":"City of Parker","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Maine St","lat":30.13048,"lng":-85.59719,"description":"The streets were detriorated, presented safety hazards, and drainage from some of the streets is inadequate. The deteriorated streets presented a bad appearance for potencial residents and businesses","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6974,6975)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"parker","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Parker St Resurfacing - 2018","government":"City of Parker","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Parker St","lat":30.13388,"lng":-85.6102,"description":"The streets were detriorated, presented safety hazards, and drainage from some of the streets is inadequate. The deteriorated streets presented a bad appearance for potencial residents and businesses","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6976)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"parker","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Shade St Resurfacing - 2018","government":"City of Parker","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Shade St","lat":30.138265,"lng":-85.60423,"description":"The streets were detriorated, presented safety hazards, and drainage from some of the streets is inadequate. The deteriorated streets presented a bad appearance for potencial residents and businesses","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6977,6979)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"parker","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Live Oak St Resurfacing - 2018","government":"City of Parker","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Live Oak St","lat":30.13431,"lng":-85.60908,"description":"The streets were detriorated, presented safety hazards, and drainage from some of the streets is inadequate. The deteriorated streets presented a bad appearance for potencial residents and businesses","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6978)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"parker","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Logan Ct Resurfacing - 2016","government":"City of Parker","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2016","location":"Parker St","lat":30.11973,"lng":-85.602625,"description":"The streets were detriorated, presented safety hazards, and drainage from some of the streets is inadequate. The deteriorated streets presented a bad appearance for potencial residents and businesses","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6980)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"parker","date_start":"2015-10-01","date_end":"2016-09-30","date_precision":"fiscal_year"},{"name":"Lance St Repaving","government":"City of Springfield","category":"Resurfacing","status":"in_progress","pct_complete":50,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Lance St","lat":30.1329,"lng":-85.59697,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is repaving Lance St.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6981)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"N 9th St - Street Resurfacing","government":"City of Parker","category":"Resurfacing","status":"unknown","pct_complete":null,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":" ","lat":30.134715,"lng":-85.602175,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city will repave N 9th St.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6982)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"parker","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"S Hwy 22A - Street Resurfacing","government":"City of Parker","category":"Resurfacing","status":"unknown","pct_complete":null,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":" ","lat":30.13835,"lng":-85.599525,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city will repave N 9th St.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6983)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"parker","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Highway 2302","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Escambia Ave to Lemieux Creek Br","lat":30.281215,"lng":-85.656665,"description":"County Road 2302 is a heavily traveled collector road servicing residential traffic and traffic associated with Southport Elementary School. It has developed substantial pavement deterioration via alligator cracking, block cracking, and rutting. This project consists of repaving County Road 2302 from Escambia Avenue to Lemieux Creek Bridge.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6985)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Appalachee St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Surf Dr to Thomas Dr","lat":30.161545,"lng":-85.780945,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6986)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Banyan St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Poincianna Dr to Orange Plz","lat":30.155215,"lng":-85.75342,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6987)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Banyan St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Poincianna Dr to N Lagoon DR","lat":30.1542,"lng":-85.753545,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6988)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Bonita St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Thomas Dr to Lydia Ln","lat":30.166815,"lng":-85.78662,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6989)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Causeway Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Beech St to Causeway Manor Ct","lat":30.15885,"lng":-85.756125,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6990)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Causeway Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Thomas Dr to Beech St","lat":30.158845,"lng":-85.754135,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6991)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Chickasaw St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Thomas Dr to Surf Dr","lat":30.16205,"lng":-85.781715,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6992)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Cypress St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"N Lagoon Dr to Sunset Dr","lat":30.15712,"lng":-85.756165,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6993)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Gulf Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Huff St to End","lat":30.14048,"lng":-85.75337,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6994)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Hispaniola St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Lookout St to End","lat":30.137805,"lng":-85.74938,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6995)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Hispaniola St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Spyglass Dr to Lookout St","lat":30.139025,"lng":-85.750895,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6996)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Huff St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Thomas Dr to Gulf Dr","lat":30.141065,"lng":-85.753335,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6997)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Hurt St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Gulf Dr to Thomas Dr","lat":30.14333,"lng":-85.756155,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6998)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Irwin St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Gulf Dr and Thomas Dr","lat":30.142105,"lng":-85.754625,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6999)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Laird St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Joan Ave to Laurie Ave","lat":30.1786,"lng":-85.786085,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7000)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Loquat Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Thomas Dr to Banyan St","lat":30.155085,"lng":-85.75242,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7001)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Oak Knoll Ct","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"N Lagoon Dr to Cul-de-sac","lat":30.16133,"lng":-85.76382,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7002)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Oak Ridge Pl","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Lagoon Oaks Dr to Cul-de-sac","lat":30.16546,"lng":-85.771525,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7003)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Oak St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Poincianna Dr to Sunset Dr","lat":30.157585,"lng":-85.75673,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7004)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Oak Wood Ct","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"N Lagoon Dr to Cul-de-sac","lat":30.161095,"lng":-85.762845,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7005)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Oakwood St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Elm St to Pine St","lat":30.16118,"lng":-85.75596,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7006)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Orange Plz","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Thomas Dr to Redwood St","lat":30.155845,"lng":-85.75301,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7007)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Palm Way","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Hilltop Ave to S Lagoon Dr","lat":30.148385,"lng":-85.75534,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7008)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Pine Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Thomas Dr (North entrance to southern 90 degree curve where Open Grade begins","lat":30.161846,"lng":-85.756691,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7009)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Redwood St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Poinciana Dr to Sunset Dr","lat":30.156595,"lng":-85.754245,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7010)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Sunset Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Thomas Dr to Beech St","lat":30.15808,"lng":-85.753965,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7011)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Sunset Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Beech St to Oak St","lat":30.15808,"lng":-85.7559,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7012)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Utes St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2018","location":"Surf Dr to Thomas Dr","lat":30.16102,"lng":-85.78017,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7013)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2017-10-01","date_end":"2018-09-30","date_precision":"fiscal_year"},{"name":"Coral Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Palm Beach Dr to Gulf View Dr","lat":30.26063,"lng":-85.96857,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7014)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Daykole St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Flagg Ave to Watkins St","lat":30.179885,"lng":-85.79807,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7015)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Dolphin Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"420' W of Riviera Dr to Le Grand Dr","lat":30.255845,"lng":-85.951995,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7016)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Dolphin Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Kelly St to 420' W of Riviera Dr","lat":30.255995,"lng":-85.955915,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7017)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Dolphin Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"PCB Pkwy to Hilltop Ave","lat":30.262825,"lng":-85.96849,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7018)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Dupree St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Front Beach Rd to Dolphin Ave","lat":30.255055,"lng":-85.956545,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7019)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Gulf View Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"US 98 to End","lat":30.26617,"lng":-85.966365,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7020)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Hilltop Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Riviera Dr to Le Grand Dr","lat":30.25509,"lng":-85.951145,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7021)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Lakeview Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Lake Powell Rec Area to Gulfview Dr","lat":30.266835,"lng":-85.970535,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7022)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"1739 Palm Beach Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Gulfview Dr to PCB Pkwy","lat":30.262065,"lng":-85.970085,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7023)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Paridiso Pl","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Front Beach Rd to PCB Pkwy","lat":30.240695,"lng":-85.92012,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7024)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Sunset Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Pinetree Dr and Gulfview Dr","lat":30.26137,"lng":-85.968145,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7025)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Sunset Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"430' W of Riviera Dr to Le Grand Dr","lat":30.256595,"lng":-85.951965,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7026)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Sunset Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Kelly St to 430' W of Riviera Dr","lat":30.25674,"lng":-85.95591,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7027)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Watkins St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Front Beach Rd to Clarence St","lat":30.180245,"lng":-85.79759,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7028)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Judson St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Harvard Blvd to Cul-de-sac","lat":30.251185,"lng":-85.615145,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7029)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Beach Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Luff St to Biltmore Dr","lat":30.14609,"lng":-85.757475,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7030)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Beach Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Crescent St to Quarts St","lat":30.15141,"lng":-85.76405,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7031)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Beach Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Raven St to Sabine St","lat":30.154305,"lng":-85.767645,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7032)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Beach Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Hurt St to Treasure Cir","lat":30.143305,"lng":-85.75403,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7034)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Beach Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Hurt St to Biltmore Dr","lat":30.144855,"lng":-85.75595,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7035)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Beach Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Venus St to Walnut St","lat":30.15887,"lng":-85.774205,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7036)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Beach Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Sabine St to Holiday Dr","lat":30.155505,"lng":-85.76925,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7037)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Beach Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Xavier St to Sunset Ave","lat":30.16133,"lng":-85.77802,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7038)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Beach Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Dolphin Dr to Crescent St","lat":30.14936,"lng":-85.761555,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7039)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Beach Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Walnut St to Xavier St","lat":30.16006,"lng":-85.776,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7040)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Dolphin dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Thomas Dr to S Lagoon Dr","lat":30.149235,"lng":-85.759435,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7041)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Edwards Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Kingswood Rd to Resota Beach Rd","lat":30.32169,"lng":-85.60631,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7042)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Pinetree Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Raven St to Dolphin Dr","lat":30.15221,"lng":-85.762365,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7043)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Pinetree Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Luff St to Biltmore Dr","lat":30.14726,"lng":-85.756245,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7044)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Sunset Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Quarts St to Crescent St","lat":30.152005,"lng":-85.763435,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7045)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Sunset Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Hurt St to Treasure Cir","lat":30.144155,"lng":-85.75363,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7046)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Sunset Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Venus St to Upas St","lat":30.158365,"lng":-85.77192,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7047)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Sunset Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Biltmore Dr to Hurt St","lat":30.14544,"lng":-85.755335,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7048)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Sunset Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Dolphin Dr to Crescent St","lat":30.149955,"lng":-85.76093,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7049)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Sunset Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Sabine St to Raven St","lat":30.15491,"lng":-85.76704,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7050)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Sunset Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Dolphin Dr to Luff St","lat":30.148125,"lng":-85.758675,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7051)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Sunset Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Holiday Dr to Sabine St","lat":30.156225,"lng":-85.7688,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7052)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Sunset Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Upas St to Holiday Dr","lat":30.15739,"lng":-85.77046,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7053)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Sunset Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Beach Dr to Venus St","lat":30.160929,"lng":-85.77581,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7054)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Sunset Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Raven St to Quarts St","lat":30.15368,"lng":-85.765465,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7055)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Bayshore Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"Woodlawn Dr to Bayshore Dr","lat":30.191297,"lng":-85.754669,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7056)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Belmont Blvd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"SR 390 to Derby Woods Dr","lat":30.235405,"lng":-85.61762,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7057)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Blue Grass Ln","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"Derby Woods Dr to Santa Anita Dr","lat":30.235495,"lng":-85.616575,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7058)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"E 37th Plaza","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Transmitter Rd to EOP","lat":30.21583,"lng":-85.606325,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7059)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Carolyn Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"Bayshore Dr to Cul-de-sac","lat":30.191783,"lng":-85.756983,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7060)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Greenwood Cir","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"Greenwood Dr to Red Cedar Ln","lat":30.193678,"lng":-85.76087,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7061)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Greenwood Ct","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"Greenwood Cir to Cul-de-sac","lat":30.19202,"lng":-85.76,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7062)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Greenwood Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"Greenwood Cir to Cul-de-sac","lat":30.193396,"lng":-85.756464,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7063)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Red Cedar Ln","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"Greenwood Dr to Greenwood Cir","lat":30.192645,"lng":-85.75945,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7064)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Saratoga Pl","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"Derby Woods to Cul-de-sac","lat":30.23422,"lng":-85.619105,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7065)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Shamrock Ln","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"Derby Woods Dr to Belmont Blvd","lat":30.23681,"lng":-85.619465,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7066)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Sunset Ln","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"Carolyn Ave and Greenwood Dr","lat":30.19416,"lng":-85.75579,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7067)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Willow Bend Ln","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"Belmont Blvd to Derby Woods","lat":30.23577,"lng":-85.619585,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7068)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Woodlawn Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"US 98 to Greenwood Dr","lat":30.192213,"lng":-85.756043,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7069)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"N Bonita Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"24th Plaza to End of Pavement","lat":30.194505,"lng":-85.64369,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7073)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"E 24th Plz","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"US 231 to SR 77","lat":30.19214,"lng":-85.64362,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7074)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"E 26th St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"231 to Bonita Ave","lat":30.195,"lng":-85.63845,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7075)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"Headland Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"US 231 to Baldwin Rd","lat":30.20127,"lng":-85.625925,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7076)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Avery St","government":"City of Panama City","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"Bonita Ave to SR 77","lat":30.19679,"lng":-85.64662,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7077)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"E 25th Plz","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Palo Alto Ave to End","lat":30.19404,"lng":-85.64518,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7078)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"E 25th St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Bonita Ave to Palo Alto Ave","lat":30.19315,"lng":-85.64471,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7079)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Mercedes Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"23rd St to 24th Plz","lat":30.190865,"lng":-85.641565,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7080)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"N Palo Alto Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"23rd St to 25th Plz","lat":30.19179,"lng":-85.645705,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7081)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"E 25th St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Palo Alto Ave to SR 77","lat":30.193175,"lng":-85.64775,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7082)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Island View Cir","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"27th St to 27th St","lat":30.196429,"lng":-85.701406,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7083)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"Cynthia Ct","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"Everitt Ave to Cul-de-sac","lat":30.179415,"lng":-85.621485,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7084)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Dana Way","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"Brandywine Dr to Cul-de-sac","lat":30.19689,"lng":-85.762895,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7085)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Pretty Bayou Island Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"Island View Dr to Pretty Bayou Island Dr","lat":30.194654,"lng":-85.700438,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7086)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"W 26th St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"Island View Dr to Island View Rd","lat":30.19606,"lng":-85.697115,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7087)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"Michelle Ct","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"Brandywine Dr to Cul-de-sac","lat":30.19685,"lng":-85.762055,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7088)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Deer Run Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"Resota Beach Rd to Cul-de-sac","lat":30.315003,"lng":-85.600568,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7089)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Beachwood Blvd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"Wildwood Rd to Dead End","lat":30.198155,"lng":-85.76345,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7090)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"Princeton Cir","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"Yale Ave to Cul-de-sac","lat":30.195615,"lng":-85.67954,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7091)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Harvard Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"Cornell Dr to Clemson Dr","lat":30.19436,"lng":-85.67832,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7092)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"S Lagoon Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Wasp St to Sunset Ave","lat":30.161885,"lng":-85.7762,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7093)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Ormond Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"US 231 to End of pavement at Long St","lat":30.21116,"lng":-85.615905,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7094)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Memorial Cir","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"Memorial Dr to Lazy Acre Rd","lat":30.292398,"lng":-85.86398,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7095)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Island View Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"SR 390 to 27th St","lat":30.195648,"lng":-85.696156,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7096)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"Kings Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"27th St to Queens Cir","lat":30.202055,"lng":-85.69983,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7097)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Harvard Cir","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"Harvard Ave to Clemson Rd","lat":30.193504,"lng":-85.678629,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7098)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Hilltop Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"Treasure Cir to Dolphin Dr","lat":30.1479,"lng":-85.755575,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7099)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"W 27th St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"Frankford Ave to End","lat":30.197005,"lng":-85.696995,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7100)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Memorial Cir","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"Lazy Acre Rd to Laird Park Rd","lat":30.293445,"lng":-85.861565,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7101)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Winona Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"W 23rd St to Airport Rd","lat":30.19027,"lng":-85.68079,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7102)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Gobbler Cr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"Wild Turkey Ln to Cul-de-sac","lat":30.319555,"lng":-85.60025,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7103)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Venus St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"Thomas Dr to S Lagoon Dr","lat":30.158595,"lng":-85.772925,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7104)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Clemson Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"Harvard Ave to Dead End","lat":30.19321,"lng":-85.677675,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7105)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Alva Thomas Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"A St to Bridge 464127","lat":30.20855,"lng":-85.60215,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7108)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Dorothy Farris Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"New Church Rd to Maulden Rd","lat":30.310795,"lng":-85.61975,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7109)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Charanna Ln","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Resota Beach Rd to End","lat":30.29411,"lng":-85.598605,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7110)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Stephen Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"US 231 to Charles Dr","lat":30.258076,"lng":-85.546939,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7111)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Scurlock Ln","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Resota Beach Rd to End","lat":30.29257,"lng":-85.598195,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7112)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Kirkpatrick Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"Resota Beach Rd to Osprey Pt","lat":30.303783,"lng":-85.59513,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7113)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Tropical Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"CR 2311 to Cul-de-sac","lat":30.285176,"lng":-85.585916,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7114)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Atlantis Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Resota Beach Rd to EOP","lat":30.283227,"lng":-85.601903,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7115)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Deer Point Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Bayhead Rd to Cul-de-sac","lat":30.305465,"lng":-85.572305,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7116)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Alta Vista Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"Hibiscus Dr to Oleander Dr","lat":30.250025,"lng":-85.936705,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7117)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Broderick Pl","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"Bonita Dr to Del Mar Dr","lat":30.245405,"lng":-85.92787,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7118)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Penny Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"CR 2301 to US 231","lat":30.27517,"lng":-85.5303,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7119)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Tom Nichols Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"CR 2321 to Harlan Shope Rd","lat":30.261345,"lng":-85.59333,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7120)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Ann Miller Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"Lake Powell Dr to End","lat":30.267745,"lng":-85.971825,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7121)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"13th St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"First Ave to End","lat":30.24605,"lng":-85.93194,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7122)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Magnolia Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"PCB Pkwy to Palmetto Ave","lat":30.25007,"lng":-85.936875,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7123)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"First Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"Christmas Tree Ln to Rose Ln","lat":30.24746,"lng":-85.937575,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7124)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Lahan Blvd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"PCB Parkway to George Wallace Blvd","lat":30.245665,"lng":-85.928375,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7125)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Del Mar Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"Lahan Blvd to Lake Pl","lat":30.244185,"lng":-85.92867,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7126)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Camp Flowers Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Morganville Rd to Bridge 464414","lat":30.315355,"lng":-85.52084,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7127)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Pinetree Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"US 98 to Lakeview Dr","lat":30.26533,"lng":-85.96892,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7128)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Hilltop Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"Pinetree Dr to Gulfview Dr","lat":30.26212,"lng":-85.968135,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7129)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Harvard Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Stanford Rd to Clemson Dr","lat":30.19385,"lng":-85.67664,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7130)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Sherrett Branch Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Resota Beach Rd to Resota Beach Rd","lat":30.313608,"lng":-85.601746,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7131)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"N Panama  Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Game Farm Rd to W Orlando Rd","lat":30.199575,"lng":-85.632695,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7132)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Sea Breeze Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"PCB Pkwy to Hilltop Ave","lat":30.262745,"lng":-85.967655,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7133)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Palm Beach Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"PCB Pkwy to Lakeview Dr","lat":30.26542,"lng":-85.969735,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7134)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Palm Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"438' W of Riviera to Le Grand Dr","lat":30.25734,"lng":-85.951935,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7135)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Canal Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"US 231 to Game Farm Rd","lat":30.19684,"lng":-85.63324,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7136)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Bradenton Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Baldwin Rd to Game Farm Rd","lat":30.200545,"lng":-85.629065,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7137)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"High Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"25th St to 26th St","lat":30.19424,"lng":-85.71513,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7138)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Claude Cir","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"13th St to 13th St","lat":30.245523,"lng":-85.931644,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7139)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Huckleberry Ln","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Edwards Rd to Huckleberry Ln","lat":30.320549,"lng":-85.588231,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7140)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"E 14th Ct","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Everitt Ave to Cul-de-sac","lat":30.17353,"lng":-85.619805,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7141)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Hibiscus Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"Magnolia Dr to End","lat":30.250215,"lng":-85.93746,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7142)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Laguna St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"Bonita Dr to Geroge Wallace Blvd","lat":30.245575,"lng":-85.929065,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7143)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Bartow Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Gamefarm Rd to Baldwin Rd","lat":30.200445,"lng":-85.63636,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7144)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Alta Vista Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"Toledo Pl to E Lakeshore Dr","lat":30.24243,"lng":-85.921525,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7145)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Dolphin Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"PCB Pkwy to  Lakeview Dr","lat":30.26525,"lng":-85.9681,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7146)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Plantation Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"2009' S of Plantation Way to Cul-de-sac","lat":30.12561,"lng":-85.56067,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7147)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Charles Claude Cir","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"George C Wallace Blvd to George C Wallace Blvd","lat":30.244065,"lng":-85.93006,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7148)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Bay Head Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Cherokee St to Park Av","lat":30.307005,"lng":-85.57794,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7149)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Bay Ave W","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Bayhead Rd to Park Av","lat":30.30797,"lng":-85.58056,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7150)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Camellia Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Azalea Rd to Gardenia St","lat":30.252525,"lng":-85.54396,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7151)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Sherrett Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Fredrickson St to End","lat":30.309865,"lng":-85.60114,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7152)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Crestbrook Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"CR 2311 to Cul-de-sac","lat":30.282585,"lng":-85.584805,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7153)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Park Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Bayhead Rd to Orange Ave","lat":30.308465,"lng":-85.58117,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7154)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Pinetree Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"US 98 to Coral Ave","lat":30.262165,"lng":-85.96935,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7155)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Anne Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Front Beach Rd S to End","lat":30.1778,"lng":-85.78516,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7156)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Sale Blvd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Fanning Bayou Dr to Pope Ave","lat":30.28321,"lng":-85.645635,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7157)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Britton Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Echo Ln to 12th ST","lat":30.23754,"lng":-85.62387,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7158)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Halcyon Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Highpoint Rd to Oak View Dr","lat":30.29607,"lng":-85.58117,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7159)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Magnolia Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Seminole St to Park Av","lat":30.308935,"lng":-85.57914,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7160)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"S Pleasant Oak Ct","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Live Oak Ln to Cul-de-sac","lat":30.166885,"lng":-85.767655,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7161)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Princess Ln","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Michigan Ave to End","lat":30.199235,"lng":-85.709425,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7162)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Owenwood Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"420' W of Fisher Rd to Duffey Rd","lat":30.50902,"lng":-85.42785,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7163)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Halcyon Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Mitte Ave to 157' W of Blanche Ave","lat":30.296065,"lng":-85.57753,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7164)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Fremar Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Frederickson St to Sherrett Dr","lat":30.309275,"lng":-85.60015,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7165)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"13th St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"CR 2302 to Hopkins Ln","lat":30.280111,"lng":-85.659195,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7166)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Creek Bank Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Camp Flowers Rd to Cul-de-sac","lat":30.326295,"lng":-85.545994,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7167)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Holly Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Cherokee St to Seminole St","lat":30.307965,"lng":-85.57566,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7168)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Alta Vista Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"George C Wallace Blvd to Lahan Blvd","lat":30.246,"lng":-85.928765,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7169)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Seminole St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Bayhead Rd to 124' N of Palm Ave","lat":30.31005,"lng":-85.577715,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7170)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Flowers Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Campflowers Rd to End","lat":30.325065,"lng":-85.548455,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7171)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Brock St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Mittie Av to Vesta Av","lat":30.296875,"lng":-85.57693,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7172)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Hyde Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Lafayette Rd to Game Farm Rd","lat":30.199895,"lng":-85.623845,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7173)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Gulf Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Holiday Dr W to End","lat":30.154745,"lng":-85.7721,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7174)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Shannon Cir","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"CR 2301 to CR 2301","lat":30.30965,"lng":-85.555118,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7175)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Vesta Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Halcyon Dr to Fargo St","lat":30.29686,"lng":-85.577945,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7176)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Stauber Ln","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Rainbow Dr to End","lat":30.32294,"lng":-85.541745,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7177)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"De Len Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"De Len Dr Intersection to End South","lat":30.270594,"lng":-85.592154,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7178)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"S Deer Haven Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"CR 2321 to End","lat":30.281818,"lng":-85.620018,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7179)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Wildridge Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Northshore Rd to Maine Ave","lat":30.227602,"lng":-85.665027,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7180)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Turkey Run","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Wildridge Rd to Cul-de-sac","lat":30.227,"lng":-85.664005,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7181)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"1st St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Madison Ave to Walton Ave","lat":30.29254,"lng":-85.65327,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7182)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Oak Knoll Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"CR 2311 N to CR 2311 S","lat":30.266797,"lng":-85.589197,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7183)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Vista Ln","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Goose Bayou Rd to End","lat":30.229705,"lng":-85.672095,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7184)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"E 9th St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"E Pierson Dr to W Pierson Dr","lat":30.245,"lng":-85.621575,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7185)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"N Bay Ct","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Emory St to 150' N of Trinity St","lat":30.24874,"lng":-85.618535,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7186)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"E 9th St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"W Pierson Dr to Britton Rd","lat":30.24491,"lng":-85.623145,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7187)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Eisenhower Cir","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Harvard Blvd to Radcliff Ave","lat":30.24169,"lng":-85.61561,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7188)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Amhurst St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"N Bay Ct to Harvard Blvd","lat":30.24884,"lng":-85.616565,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7189)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"E 9th St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Britton Rd to End","lat":30.2448,"lng":-85.62541,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7190)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Sea Breeze Dr","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"PCB Pkwy to Lakeview Dr","lat":30.265165,"lng":-85.967285,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7191)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"W 27th St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"SR390 to Yale Ave","lat":30.197115,"lng":-85.6827,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7192)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Altha Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Lafayette Rd to Game Farm Rd","lat":30.200255,"lng":-85.62282,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7193)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Pocahontas St","government":"City of Callaway","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Star Ave to Yellow Bluff Rd","lat":30.139345,"lng":-85.56539,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7194)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"cw","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Katherine Ave","government":"City of Callaway","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"SR 22 to End","lat":30.154065,"lng":-85.5763,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7195)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"cw","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Stauber Ln","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Campflowers Rd to Stauber Ln T","lat":30.32197,"lng":-85.541365,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7196)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"N Charlene Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"SR 22 to End","lat":30.15212,"lng":-85.581325,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7197)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"W 24th Ct","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Flower Ave to Fortune Ave","lat":30.193555,"lng":-85.68831,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7198)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Britton Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"12th St to Chelsea Ln","lat":30.241635,"lng":-85.62381,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7199)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"1st St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Liberty Ave to Madison Ave","lat":30.292525,"lng":-85.64776,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7200)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Fredrickson St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Resota Beach Rd to Gravelle Dr","lat":30.30884,"lng":-85.598165,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7201)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"N Ridge Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"John Cox Rd to Cul-de-sac","lat":30.39265,"lng":-85.544945,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7202)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Britton Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Chelsea Ln to E 9th St","lat":30.243815,"lng":-85.623795,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7203)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Orange Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Seminole St to Park Ave","lat":30.30988,"lng":-85.578905,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7204)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Palmdale Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Fredrickson St to Sherrett Dr","lat":30.309595,"lng":-85.60123,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7205)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Palm Ct","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Atlantis Dr to Teakwood Ct","lat":30.283705,"lng":-85.60238,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7206)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Bluebell Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Azalea Rd to Gardenia St","lat":30.252335,"lng":-85.54508,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7207)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Orange Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Cherokee St to End","lat":30.30988,"lng":-85.57436,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7208)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Holly Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Seminole St to Bay Ave West","lat":30.307975,"lng":-85.579145,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7209)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"First Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Palm Dr to Twin Lakes Dr","lat":30.248605,"lng":-85.940085,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7210)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Teakwood Ct","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Resota Beach Rd to Palm Ct","lat":30.284635,"lng":-85.60289,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7211)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Sewanee St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"N Bay Dr to Harvard Blvd","lat":30.252395,"lng":-85.616415,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7212)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Skunk Valley Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"150' E of Prosper Dr to Raccon Rd","lat":30.37315,"lng":-85.661385,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7213)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Riley Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"SR 77 to End","lat":30.29291,"lng":-85.64081,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7214)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Camp St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Cedar Bluff Rd to End","lat":30.34276,"lng":-85.59862,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7215)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Owenwood Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"Duffey Rd to Deep Springs Rd","lat":30.509055,"lng":-85.442005,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7216)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Wood Hurst Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"John Pitts Rd to Cul-de-sac","lat":30.24664,"lng":-85.53722,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7217)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Bear St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Campflower Rd to Creek Bank Dr","lat":30.32576,"lng":-85.547635,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7218)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Creek St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Camp FLowers Rd to Creek Bank Dr","lat":30.32556,"lng":-85.54628,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7219)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Peterson Ln","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Resota Beach Rd to Cul-de-sac","lat":30.30254,"lng":-85.597915,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7220)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Red Bay Cir","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Cedar Bluff Rd to Cul-de-sac","lat":30.34207,"lng":-85.592275,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7221)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Melinda Cir","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Cedar Bluff Rd to Cul-de-sac","lat":30.343555,"lng":-85.593305,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7222)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"N Cedar Bluff Cir","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Cedar Bluff Rd to Cul-de-sac","lat":30.342455,"lng":-85.595265,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7223)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Cherokee Ln","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Bayhead Rd to End","lat":30.305895,"lng":-85.57365,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7224)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Park Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"Orange Ave to 188'N of Pine Ave","lat":30.31061,"lng":-85.57995,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7225)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Gardenia St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Pinetree Rd to End","lat":30.25321,"lng":-85.54488,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7226)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Pitti Ln","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Ard Dr to Cul-de-sac","lat":30.333485,"lng":-85.553745,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7227)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Magnolia Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Cherokee St to Seminole St","lat":30.308915,"lng":-85.57566,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7228)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"W Bayhead Ct","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Bayhead Rd to Cul-de-sac","lat":30.30789,"lng":-85.568465,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7229)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Cherokee Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Cherokee Ln to End","lat":30.305455,"lng":-85.573825,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7230)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Julie Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"US 231 to Bertha Nelson Rd","lat":30.246512,"lng":-85.567416,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7231)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"High Point Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Highpoint Rd to Highpoint Rd","lat":30.299237,"lng":-85.577143,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7232)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Palm Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Seminole St to Pecan Av","lat":30.31253,"lng":-85.57885,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7233)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Baker Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"7th St to Dory Ln","lat":30.286905,"lng":-85.64966,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7234)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Suwanee Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"CR 2302 to 7th St","lat":30.28786,"lng":-85.650575,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7235)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Blue Water Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"CR 2311 to Cul-de-sac","lat":30.283875,"lng":-85.585202,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7236)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Mittie Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Halsey Cir to Highpoint Rd","lat":30.29124,"lng":-85.576585,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7237)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"7th St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Suwannee Ave to Baker Ave","lat":30.28737,"lng":-85.650085,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7238)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Highpoint Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"CR 2321 to Bollinger Rd","lat":30.25725,"lng":-85.578383,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7239)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Sunwood Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"John Pitts Rd to Azalea St","lat":30.249545,"lng":-85.540115,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7240)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Zula Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Highpoint Rd to End","lat":30.29757,"lng":-85.57918,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7241)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"De Len Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"De Len Dr Intersection to End North","lat":30.271525,"lng":-85.59056,"description":"Partially funded by FEMA and Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7242)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Hale Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Hutchison Blvd to End","lat":30.187145,"lng":-85.813135,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7243)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"S Cedar Bluff Cir","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Cedar Bluff Rd to Cul-de-sac","lat":30.341725,"lng":-85.595285,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7244)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Buck Horn Cir","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Deer Run Rd to Cul-de-sac","lat":30.315375,"lng":-85.60031,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7245)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Oak Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Cherokee St to Seminole St","lat":30.311815,"lng":-85.57564,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7246)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Patton Pl","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Highpoint Rd to End","lat":30.29689,"lng":-85.58084,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7247)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Merritt Brown Way","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Merritt Brown Rd to School Property Line","lat":30.23997,"lng":-85.562105,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7248)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Alva Thomas Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Bridge 464127 to Whitehead Blvd","lat":30.20853,"lng":-85.60012,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7249)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"N Bay Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Harvard Blvd to Sewanee St","lat":30.254373,"lng":-85.616692,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7250)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Radcliff Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"12th St to Judson St","lat":30.245835,"lng":-85.616865,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7251)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"N Bay Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"E 9th St to Trinity St","lat":30.247836,"lng":-85.610515,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7252)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Morganville Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Camp Flowers Rd to End","lat":30.316965,"lng":-85.52376,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7253)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Granger Ln","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"Oleander Dr to First Ave","lat":30.247175,"lng":-85.93792,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7254)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Garrison Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"McCall Rd to End","lat":30.22728,"lng":-85.605165,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7255)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Alta Vista Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"El Reposo Pl to Palmetto Pl","lat":30.2404,"lng":-85.917455,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7256)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"E Orlando Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Transmitter Rd to Lafayette Rd","lat":30.20042,"lng":-85.61614,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7257)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Dorothy Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Laird St to End South","lat":30.175925,"lng":-85.78376,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7258)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Wakulla Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Baldwin Rd to Game Farm Rd","lat":30.200525,"lng":-85.62176,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7259)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Palm Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Cherokee St to Seminole St","lat":30.312755,"lng":-85.575625,"description":"Partially funded by FEMA and Surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7260)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Azalea St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Pinetree Rd to Sunwood Rd","lat":30.251275,"lng":-85.54321,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7261)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Cedar Bluff Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Resota Beach Rd to End","lat":30.342237,"lng":-85.59524,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7262)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"2nd St","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"SR 77 to Walton Ave","lat":30.291585,"lng":-85.648625,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7263)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"Mill Bayou Rd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"43rd St north to end of pavement","lat":30.227755,"lng":-85.598933,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7264)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Pompano Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Riviera Dr to Le Grand Dr","lat":30.258065,"lng":-85.951235,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7265)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"E Bayhead Ct","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Bayhead Rd to Cul-de-sac","lat":30.30745,"lng":-85.566375,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7266)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Nancy Ave","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"Downing St to Downing St","lat":30.253518,"lng":-85.943988,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7267)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"N Lakeshore Dr","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2022","location":"PCB Pkwy  to End of pavement","lat":30.245725,"lng":-85.91879,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7268)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2021-10-01","date_end":"2022-09-30","date_precision":"fiscal_year"},{"name":"George C Wallace Blvd","government":"Bay County","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"George C Wallace Blvd from 90 degree curve to Lahan Blvd","lat":30.244125,"lng":-85.93,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7269)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Minge Branch Connector Road","government":"Bay County","category":"Capacity Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Minge Branch Connector Road","lat":30.240595,"lng":-85.5903,"description":"This project will include the construction of a new roadway from Titus Road to State Road 390. County. The new roadway will allow for safer and more efficient access to State Road 390 and on to U.S. Highway 231 while also providing a second route for vehicles to access County Road 2321.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7270)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Wakulla Ave","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Avon Ave to E Game Farm Rd","lat":30.197765,"lng":-85.621785,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is resufacing Wakulla Ave. Water and sewer updates will be made in conjunction with this project.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7272)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"East Avenue Utilities","government":"City of Panama City","category":"Utility Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"East Avenue Utilities","lat":30.14331,"lng":-85.625445,"description":"New utilities to service the Port East Terminal. Intersection of East Ave & East 1st Ct to S East Ave.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7274)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Breezy Lane Repavement of Roadway after stormwater repairs","government":"City of Panama City","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":" ","lat":30.190285,"lng":-85.67096,"description":"Using funds from the half-cent surtax, Replacement of aging stormwater infrastructure with installation of new concrete box culvert under Breezy Lane and repavement of roadway.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7275)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Utility Improvements","government":"City of Springfield","category":"Utility Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Transmitter Rd to St. Dominic Church","lat":30.17507,"lng":-85.610235,"description":"Using funds from the half-cent surtax, the city upgraded the water lines and hydants in this area.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7276)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Naples Ave","government":"City of Springfield","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Douglas Rd to Ten Acre Rd","lat":30.19303,"lng":-85.60927,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is rehabing the sewer lift station on Naples Ave in conjuntion with other water and sewer improvements. Additionally Naples Ave is being resurfaced","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7277)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"S Cocoa Ave","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Douglas  Ave to Dead End","lat":30.19025,"lng":-85.619775,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is upgrading S Cocoa Ave. water, sewer upgrades, road resurfacing Douglas Rd - End SPR 26.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7278)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"W Governor Dr","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Governor Dr to 13th St","lat":30.248085,"lng":-85.92973,"description":"Dirt Road Stabilization - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7287)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Bonita Dr","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"El Prado Pl to Venado Pl","lat":30.24482,"lng":-85.92348,"description":"Dirt Road Stabilization - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7288)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Jasmine Pl","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Bonita Dr to Del Mar Dr","lat":30.24434,"lng":-85.92601,"description":"Dirt Road Stabilization - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7289)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Palmetto Pl","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Del Mar Dr to Deluna Pl","lat":30.23919,"lng":-85.916585,"description":"Dirt Road Stabilization - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7290)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Palmetto Ave","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Christmas Tree Ln to End of Pavement","lat":30.24844,"lng":-85.937885,"description":"Dirt Road Stabilization - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7291)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"W Lakeshore Dr","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Toledo Pl to Alta Vista Dr","lat":30.241825,"lng":-85.92287,"description":"Dirt Road Stabilization - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7292)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Corto Pl","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Del Mar Dr to Alta Vista Dr","lat":30.242365,"lng":-85.923485,"description":"Dirt Road Stabilization - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7293)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"K Kourt","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Le Grand Dr to Kay Ct","lat":30.255475,"lng":-85.949665,"description":"Dirt Road Stabilization - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7294)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Alta Vista Dr","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Twin Lakes Dr to Palm Dr","lat":30.250455,"lng":-85.939615,"description":"Dirt Road Stabilization - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7295)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Del Mar Dr","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Laureno Pl to El Reposo Pl","lat":30.23909,"lng":-85.91894,"description":"Dirt Road Stabilization - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7296)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"13th St","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Back Beach Rd to End of Pavement","lat":30.24834,"lng":-85.930575,"description":"Dirt Road Stabilization - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7297)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Bonita Dr","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Venado Pl to Casa Pl","lat":30.24518,"lng":-85.92419,"description":"Dirt Road Stabilization - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7298)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Del Mar Dr","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Deluna Pl to Benicia Pl","lat":30.238255,"lng":-85.917255,"description":"Dirt Road Stabilization - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7299)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"La Paloma Pl","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Alta Vista Dr to Bonita Dr","lat":30.244625,"lng":-85.92454,"description":"Dirt Road Stabilization - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7300)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"El Prado Pl","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Alta Vista Dr to Bonita Dr","lat":30.244155,"lng":-85.9236,"description":"Dirt Road Stabilization - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7301)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Hilltop Ave","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Riviera Dr to End of Pavement","lat":30.255125,"lng":-85.95315,"description":"Dirt Road Stabilization - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7302)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Webb St","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Dupree St to Kelly St","lat":30.255025,"lng":-85.95728,"description":"Dirt Road Stabilization - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7303)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Charlie Claude Dr","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"W Governor Dr to 13th St","lat":30.24799,"lng":-85.93013,"description":"Dirt Road Stabilization - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7304)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Circle Dr","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"West End Dr to Cul-de-sac","lat":30.25061,"lng":-85.94132,"description":"Dirt Road Stabilization - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7305)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Laureno Pl","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2019","location":"Del Mar Dr to Alta Vista Dr","lat":30.239505,"lng":-85.917715,"description":"Dirt Road Stabilization - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7306)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2018-10-01","date_end":"2019-09-30","date_precision":"fiscal_year"},{"name":"Harris Ave","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"E 24th Plaza to E 25th St","lat":30.192615,"lng":-85.63946,"description":"Urban Local Dirt Roads - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7340)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Ormond Ave","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Long St to End","lat":30.21568,"lng":-85.615795,"description":"Urban Dirt Road Paving - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7341)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Richardson Rd","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"US 231 to End of Pavement","lat":30.21978,"lng":-85.60325,"description":"Urban Local Dirt Roads - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7342)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Bartow Ave","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"E 26th St to Hosanna Trail","lat":30.19558,"lng":-85.63613,"description":"Urban Local Dirt Roads - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7343)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"La Mesa Ave","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"E Baldwin Rd to Alamo St","lat":30.20322,"lng":-85.63381,"description":"Urban Dirt Road Paving - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7344)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"E 25th St","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"Mercedes Ave to Cul-de-sac","lat":30.19309,"lng":-85.639995,"description":"Urban Local Dirt Roads - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7345)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Twilight Ave","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"E 26th St to W Game Farm Rd","lat":30.196845,"lng":-85.634325,"description":"Urban Local Dirt Roads - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7346)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Arden Ave","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2024","location":"E Baldwin Rd to E Orlando Rd","lat":30.201205,"lng":-85.610285,"description":"Urban Local Dirt Roads - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7347)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2023-10-01","date_end":"2024-09-30","date_precision":"fiscal_year"},{"name":"Vera Ln","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Long St to End","lat":30.21456,"lng":-85.617225,"description":"Urban Dirt Road Paving - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7348)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"E 7th St","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"700' W of Tyndall Parkway to End","lat":30.159895,"lng":-85.586805,"description":"Urban Dirt Road Paving - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7349)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Alamo St","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"La Mesa Ave to Canal Ave","lat":30.204175,"lng":-85.63352,"description":"Urban Dirt Road Paving - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7350)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Long St","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Ormond Ave to End","lat":30.215035,"lng":-85.616695,"description":"Urban Dirt Road Paving - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7351)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Harvey St","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"250' E of Bright Ave to Nelle St","lat":30.150735,"lng":-85.56325,"description":"Dirt Road Stabilization - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7352)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Coleridge Rd","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Plantation Dr to Colonial Dr","lat":30.13265,"lng":-85.559895,"description":"Dirt Road Stabilization - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7353)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"E 6th St","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Blue Jay Ave to N Gay Ave","lat":30.15775,"lng":-85.58618,"description":"Dirt Road Stabilization - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7354)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"N Fox Ave","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Pittsburgh St to E 11th St","lat":30.16293,"lng":-85.56989,"description":"Dirt Road Stabilization - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7355)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"E 7th St","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"N Kimbrel Ave to End of Pavement","lat":30.159755,"lng":-85.58169,"description":"Dirt Road Stabilization - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7356)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Mockingbird Dr","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"E 5th St to E 6th St","lat":30.1568,"lng":-85.586155,"description":"Dirt Road Stabilization - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7357)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"N Comet Ave","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"Highway 22 to End of Pavement","lat":30.156485,"lng":-85.578415,"description":"Dirt Road Stabilization - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7358)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Blue Jay Ave","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2020","location":"E 5th St to E 6th St","lat":30.15679,"lng":-85.58541,"description":"Dirt Road Stabilization - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7359)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2019-10-01","date_end":"2020-09-30","date_precision":"fiscal_year"},{"name":"Hall Ave","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"W Orlando Rd to Baldwin Rd","lat":30.2013,"lng":-85.63948,"description":"Unpaved Urban Local Roads - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7360)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Virginia Ct","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"E 10th St to E 11th St","lat":30.16599,"lng":-85.56668,"description":"Unpaved Urban Local Roads - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7361)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"W Orlando Rd","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"Hall Ave to End","lat":30.200385,"lng":-85.64042,"description":"Unpaved Urban Local Roads - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7362)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Hyde Ave","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"Baldwin Rd to End","lat":30.203135,"lng":-85.623835,"description":"Unpaved Urban Local Roads - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7363)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Evelyn Ave","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"W Orlando Rd to End","lat":30.201,"lng":-85.631685,"description":"Unpaved Urban Local Roads - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7364)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Naples Ave","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"E Orlando Rd to End","lat":30.19986,"lng":-85.609785,"description":"Unpaved Urban Local Roads - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7365)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"E 21St Plz","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"Sherman Ave to End","lat":30.186055,"lng":-85.628165,"description":"Unpaved Urban Local Roads - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7366)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"T St","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"Transmitter Rd to End","lat":30.2031,"lng":-85.605595,"description":"Unpaved Urban Local Roads - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7367)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Lorado Ave","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"Game Farm Rd to E Orlando Rd","lat":30.19941,"lng":-85.611335,"description":"Unpaved Urban Local Roads - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7368)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Virginia Ct","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"E 10th St to End","lat":30.164615,"lng":-85.566695,"description":"Unpaved Urban Local Roads - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7369)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Glenview Ave","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"E Orlando Rd to E Game Farm Rd","lat":30.199465,"lng":-85.61395,"description":"Unpaved Urban Local Roads - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7370)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Glenview Ave","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2021","location":"E Orlando Rd to E Baldwin Rd","lat":30.201275,"lng":-85.613925,"description":"Unpaved Urban Local Roads - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7371)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2020-10-01","date_end":"2021-09-30","date_precision":"fiscal_year"},{"name":"Bradenton Ave","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"E 34th Pl to Selma Ave","lat":30.207305,"lng":-85.628985,"description":"Dirt Road Stabilization - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7373)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Canal St","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"E 26th St to E 40th Pl","lat":30.21971,"lng":-85.63303,"description":"Dirt Road Stabilization - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7375)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Brookins Rd","government":"Bay County","category":"Dirt Road Stabilization","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"E 24th St to End","lat":30.221555,"lng":-85.63545,"description":"Urban Dirt Road Paving - asphalt pavement installed on existing dirt roads","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7377)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E 3rd St","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"Everitt Ave to E Business Hwy 98","lat":30.1531,"lng":-85.6191,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water, sewer lines & road paving - E 3rd St (Everitt Ave - US Bus 98).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7378)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"Central Ave","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"E 2nd St to E 3rd St ","lat":30.151235,"lng":-85.61811,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is Replace water, sewer lines & road paving - Central Ave (E 2nd St - E 3rd St).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7379)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"Wabash Ave","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"E 2nd St to E 2nd Plz","lat":30.1508,"lng":-85.617125,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is Replace water, sewer lines & road paving - Central Ave (E 2nd St - E 3rd St).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7380)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"E 1st Ct","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"N Everitt Ave to Wabash Ave","lat":30.14659,"lng":-85.619085,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water, sewer lines & road paving - E 1st Ct (Everitt Ave - Wabash Ave).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7381)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"Cherry St Water Line","government":"City of Springfield","category":"Utility Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"Everitt Ave to Hwy 22A","lat":30.14574,"lng":-85.610395,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water line - Cherry St (Everitt Ave - Hwy 22A).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7382)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"Cherry St Water Line","government":"City of Springfield","category":"Utility Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"Royal Cir to El Dorado Cir","lat":30.14553,"lng":-85.602865,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water line - Cherry St (Royal Cir - El Dorado Cir).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7384)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"N Highway 22A Water Line","government":"City of Springfield","category":"Utility Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"Cherry St to Meter","lat":30.14596,"lng":-85.599605,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water line - N Hwy 22A (Cherry St - Meter).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7385)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"E 1st Ct Water Line","government":"City of Springfield","category":"Utility Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"E Bus Hwu 98 to Kilbourn Ave","lat":30.147115,"lng":-85.61523,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water line - E 1st Ct (E Bus Hwu 98 - Kilbourne Ave).","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7386)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"Bob Little Rd","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"E 14th St to Delisa AVe","lat":30.171825,"lng":-85.59948,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water - lines & road paving 13 Ct.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7387)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"Pinnacle Pines Rd","government":"City of Springfield","category":"Utility  and Road Improvement","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2025","location":"E 14th St to End","lat":30.171589,"lng":-85.603186,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city is replacing water, sewer lines & road paving - Evergreen Ct.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7390)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":"2024-10-01","date_end":"2025-09-30","date_precision":"fiscal_year"},{"name":"E 2nd St","government":"City of Springfield","category":"Resurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"E bus Hwy 98 to Detroit Ave","lat":30.14973,"lng":-85.61257,"description":"Using funds from the half-cent surtax, in conjunction with other funding sources, the city has repaved 2nd St.","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7394)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"sp","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E Lakeland Dr","government":"Bay County","category":"Local Road Microsurfacing","status":"in_progress","pct_complete":90,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"CR 2311 to Cul-de-sac","lat":30.280532,"lng":-85.583325,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7399)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Cambridge Ct","government":"Bay County","category":"Local Road Microsurfacing","status":"in_progress","pct_complete":90,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Ashland Way to Cul-de-sac","lat":30.2895,"lng":-85.583395,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7400)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Halsey Cir","government":"Bay County","category":"Local Road Microsurfacing","status":"in_progress","pct_complete":90,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"CR 2311 to McKenzie Ave","lat":30.292635,"lng":-85.577905,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7401)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Rasch Rd","government":"Bay County","category":"Local Road Microsurfacing","status":"in_progress","pct_complete":90,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Bollinger Rd to End","lat":30.264365,"lng":-85.57556,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7402)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Ashland Way","government":"Bay County","category":"Local Road Microsurfacing","status":"in_progress","pct_complete":90,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"CR2311 to Cul-de-sac","lat":30.28983,"lng":-85.583565,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7403)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Highpoint Rd","government":"Bay County","category":"Local Road Microsurfacing","status":"in_progress","pct_complete":90,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"CR 2311 to Halsey Cir","lat":30.29319,"lng":-85.580875,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7404)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Gilchrist Ave","government":"Bay County","category":"Local Road Microsurfacing","status":"in_progress","pct_complete":90,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Halsey Cr to End","lat":30.290975,"lng":-85.57512,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7405)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Shady Dr","government":"Bay County","category":"Local Road Microsurfacing","status":"in_progress","pct_complete":90,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"W Lakeland Dr to End","lat":30.281175,"lng":-85.58816,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7406)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Highpoint Rd","government":"Bay County","category":"Local Road Microsurfacing","status":"in_progress","pct_complete":90,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Bollinger Rd to Mittie Ave","lat":30.276472,"lng":-85.577272,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7407)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Brewton Ln","government":"Bay County","category":"Local Road Microsurfacing","status":"in_progress","pct_complete":90,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"CR 2311 to Brewton Way","lat":30.274495,"lng":-85.588505,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7408)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Morgan Rd","government":"Bay County","category":"Local Road Microsurfacing","status":"in_progress","pct_complete":90,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Bollinger Rd to Cul-de-sac","lat":30.264265,"lng":-85.574105,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7409)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Highpoint Rd","government":"Bay County","category":"Local Road Microsurfacing","status":"in_progress","pct_complete":90,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Mittie Ave to Halsey Cir","lat":30.29125,"lng":-85.578135,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7410)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Venado Pl","government":"Bay County","category":"Local Road Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2027","location":"Front Beach Rd to PCB Pkwy","lat":30.24302,"lng":-85.92497,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7411)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2026-10-01","date_end":"2027-09-30","date_precision":"fiscal_year"},{"name":"Deerfield Ln","government":"Bay County","category":"Local Road Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2027","location":"Plantation Dr to Cul-de-sac","lat":30.133115,"lng":-85.55789,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7412)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2026-10-01","date_end":"2027-09-30","date_precision":"fiscal_year"},{"name":"First Ave","government":"Bay County","category":"Local Road Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2027","location":"12th St to 13th St","lat":30.244975,"lng":-85.932055,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7413)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2026-10-01","date_end":"2027-09-30","date_precision":"fiscal_year"},{"name":"Placido Pl","government":"Bay County","category":"Local Road Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2027","location":"Front Beach Rd to Del Mar Dr","lat":30.23817,"lng":-85.91923,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7414)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2026-10-01","date_end":"2027-09-30","date_precision":"fiscal_year"},{"name":"Deep Bayou Dr","government":"Bay County","category":"Local Road Reconstruction","status":"in_progress","pct_complete":90,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"McKenzie Ave to Cul-de-sac","lat":30.29544,"lng":-85.573005,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7415)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"West End Dr","government":"Bay County","category":"Local Road Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2027","location":"Azalea Dr to End","lat":30.251395,"lng":-85.94146,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7416)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2026-10-01","date_end":"2027-09-30","date_precision":"fiscal_year"},{"name":"Azalea Dr","government":"Bay County","category":"Local Road Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2027","location":"Back Beach Rd to 1st Ave","lat":30.25155,"lng":-85.940885,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7417)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2026-10-01","date_end":"2027-09-30","date_precision":"fiscal_year"},{"name":"Lake Pl","government":"Bay County","category":"Local Road Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2027","location":"Front Beach Rd to Cul-de-sac","lat":30.24246,"lng":-85.92913,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7418)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2026-10-01","date_end":"2027-09-30","date_precision":"fiscal_year"},{"name":"El Prado Pl","government":"Bay County","category":"Local Road Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2027","location":"Delmar Dr to Alta Vista Dr","lat":30.242845,"lng":-85.924445,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7419)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2026-10-01","date_end":"2027-09-30","date_precision":"fiscal_year"},{"name":"Plantation Dr","government":"Bay County","category":"Local Road Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2027","location":"Old Bicycle Rd to Plantation Way","lat":30.134535,"lng":-85.55886,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7420)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2026-10-01","date_end":"2027-09-30","date_precision":"fiscal_year"},{"name":"Highpoint Rd","government":"Bay County","category":"Local Road Reconstruction","status":"in_progress","pct_complete":90,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Bridge 464093 to Blanche Ave","lat":30.29817,"lng":-85.579185,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7421)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Blanche Dr","government":"Bay County","category":"Local Road Reconstruction","status":"in_progress","pct_complete":90,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Halsey Cir to Halcyon Dr","lat":30.294285,"lng":-85.578125,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7422)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Azalea Dr","government":"Bay County","category":"Local Road Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2027","location":"Twin Lakes Dr to 1st Ave","lat":30.24821,"lng":-85.94053,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7423)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2026-10-01","date_end":"2027-09-30","date_precision":"fiscal_year"},{"name":"Del Mar Dr","government":"Bay County","category":"Local Road Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2027","location":"Venado Pl to Romanza Pl","lat":30.24207,"lng":-85.924955,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7424)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2026-10-01","date_end":"2027-09-30","date_precision":"fiscal_year"},{"name":"Highpoint Rd","government":"Bay County","category":"Local Road Reconstruction","status":"in_progress","pct_complete":90,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Blanche Ave to McKenzie Ave","lat":30.29813,"lng":-85.57615,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7425)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Jessica Ct","government":"Bay County","category":"Local Road Reconstruction","status":"in_progress","pct_complete":90,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Oak View Dr to End","lat":30.29509,"lng":-85.58012,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7426)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"4th St","government":"Bay County","category":"Local Road Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2027","location":"Front Beach Rd to End","lat":30.251265,"lng":-85.948765,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7427)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2026-10-01","date_end":"2027-09-30","date_precision":"fiscal_year"},{"name":"1st St","government":"Bay County","category":"Local Road Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2027","location":"Front Beach Rd to End","lat":30.25048,"lng":-85.9457,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7428)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2026-10-01","date_end":"2027-09-30","date_precision":"fiscal_year"},{"name":"Chelsea Dr","government":"Bay County","category":"Local Road Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2027","location":"West End Dr to First Ave","lat":30.25011,"lng":-85.941897,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7429)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2026-10-01","date_end":"2027-09-30","date_precision":"fiscal_year"},{"name":"Mills Ln","government":"Bay County","category":"Local Road Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2027","location":"Old Bicycle Rd to Cul-de-sac","lat":30.13622,"lng":-85.515065,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7430)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2026-10-01","date_end":"2027-09-30","date_precision":"fiscal_year"},{"name":"Oak View Dr","government":"Bay County","category":"Local Road Reconstruction","status":"in_progress","pct_complete":90,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Highpoint Rd to Halcyon Dr","lat":30.29428,"lng":-85.580273,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7431)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Marlin Ave","government":"Bay County","category":"Local Road Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2027","location":"Kelly St to Riviera Dr","lat":30.25892,"lng":-85.955185,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7432)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2026-10-01","date_end":"2027-09-30","date_precision":"fiscal_year"},{"name":"Marlin Ave","government":"Bay County","category":"Local Road Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2027","location":"PCB Pkwy to Riviera Dr","lat":30.25902,"lng":-85.9517,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7433)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2026-10-01","date_end":"2027-09-30","date_precision":"fiscal_year"},{"name":"La Paloma Pl","government":"Bay County","category":"Local Road Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2027","location":"Alta Vista Dr to Del Mar Dr","lat":30.243315,"lng":-85.9254,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7434)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2026-10-01","date_end":"2027-09-30","date_precision":"fiscal_year"},{"name":"Mceachern St","government":"Bay County","category":"Local Road Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2027","location":"5th St to End","lat":30.25159,"lng":-85.949655,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7435)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2026-10-01","date_end":"2027-09-30","date_precision":"fiscal_year"},{"name":"5th St","government":"Bay County","category":"Local Road Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2027","location":"Mceachern St to End","lat":30.25168,"lng":-85.9492,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7436)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2026-10-01","date_end":"2027-09-30","date_precision":"fiscal_year"},{"name":"Coleridge Rd","government":"Bay County","category":"Local Road Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2027","location":"S Star Ave E 599'","lat":30.135975,"lng":-85.56399,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7437)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2026-10-01","date_end":"2027-09-30","date_precision":"fiscal_year"},{"name":"First Ave","government":"Bay County","category":"Local Road Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2027","location":"Azalea Dr to Palm Dr","lat":30.248945,"lng":-85.94085,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7438)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2026-10-01","date_end":"2027-09-30","date_precision":"fiscal_year"},{"name":"Riviera Dr","government":"Bay County","category":"Local Road Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2027","location":"Front Beach Rd to Marlin Ave","lat":30.255587,"lng":-85.952421,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7439)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2026-10-01","date_end":"2027-09-30","date_precision":"fiscal_year"},{"name":"Del Mar Dr","government":"Bay County","category":"Local Road Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2027","location":"E Lakeshore Dr to El Reposa","lat":30.23992,"lng":-85.92062,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7440)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2026-10-01","date_end":"2027-09-30","date_precision":"fiscal_year"},{"name":"Del Mar Dr","government":"Bay County","category":"Local Road Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2027","location":"Casa Place to Venado Pl","lat":30.242545,"lng":-85.92592,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7441)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2026-10-01","date_end":"2027-09-30","date_precision":"fiscal_year"},{"name":"3rd St","government":"Bay County","category":"Local Road Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2027","location":"Front Beach Rd to End","lat":30.25101,"lng":-85.947685,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7442)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2026-10-01","date_end":"2027-09-30","date_precision":"fiscal_year"},{"name":"Placido Pl","government":"Bay County","category":"Local Road Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2027","location":"Alta Vista Dr to PCB Pkwy","lat":30.241325,"lng":-85.917145,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7443)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2026-10-01","date_end":"2027-09-30","date_precision":"fiscal_year"},{"name":"Indian Bluff Rd","government":"Bay County","category":"Projected Resurfacing and Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2028 and FY2029","location":"Indian Bluff Dr to Cherokee St","lat":30.315807,"lng":-85.56814,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7444)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2027-10-01","date_end":"2029-09-30","date_precision":"range"},{"name":"Delwood Beach Rd","government":"Bay County","category":"Projected Resurfacing and Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2028 and FY2029","location":"Magnolia Beach Rd Intersection to Jan Cooley Dr","lat":30.154895,"lng":-85.729595,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7445)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2027-10-01","date_end":"2029-09-30","date_precision":"range"},{"name":"Jan Cooley Dr","government":"Bay County","category":"Projected Resurfacing and Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2028 and FY2029","location":"Mariner Dr to End","lat":30.136835,"lng":-85.720465,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7446)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2027-10-01","date_end":"2029-09-30","date_precision":"range"},{"name":"Commerce Dr","government":"Bay County","category":"Projected Resurfacing and Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2028 and FY2029","location":"McElvey Dr to Cul-de-sac","lat":30.18144,"lng":-85.762,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7447)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2027-10-01","date_end":"2029-09-30","date_precision":"range"},{"name":"Indian Bluff Dr","government":"Bay County","category":"Projected Resurfacing and Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2028 and FY2029","location":"Indian Bluff Rd to Indian Bluff Dr","lat":30.319812,"lng":-85.5733,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7448)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2027-10-01","date_end":"2029-09-30","date_precision":"range"},{"name":"Klondyke Rd","government":"Bay County","category":"Projected Resurfacing and Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2028 and FY2029","location":"Northwood St to Waverly St","lat":30.301358,"lng":-85.543203,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7449)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2027-10-01","date_end":"2029-09-30","date_precision":"range"},{"name":"Magnolia Beach Rd","government":"Bay County","category":"Projected Resurfacing and Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2028 and FY2029","location":"Thomas Dr to Delwood Beach Rd","lat":30.1588,"lng":-85.744355,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7450)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2027-10-01","date_end":"2029-09-30","date_precision":"range"},{"name":"Waverly St","government":"Bay County","category":"Projected Resurfacing and Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2028 and FY2029","location":"CR 2301 to Eastwood Ave","lat":30.296735,"lng":-85.53894,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7451)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2027-10-01","date_end":"2029-09-30","date_precision":"range"},{"name":"Northwood St","government":"Bay County","category":"Projected Resurfacing and Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2028 and FY2029","location":"CR 2301 to Eastwood Av","lat":30.305405,"lng":-85.54089,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7452)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2027-10-01","date_end":"2029-09-30","date_precision":"range"},{"name":"Maude Rd","government":"Bay County","category":"Projected Resurfacing and Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2028 and FY2029","location":"Brandon Rd to Cluster Rd","lat":30.25253,"lng":-85.50753,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7453)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2027-10-01","date_end":"2029-09-30","date_precision":"range"},{"name":"Holley Ln","government":"Bay County","category":"Projected Resurfacing and Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2028 and FY2029","location":"McElvey Rd to Cul-de-sac","lat":30.181425,"lng":-85.76566,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7454)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2027-10-01","date_end":"2029-09-30","date_precision":"range"},{"name":"Brandon Rd","government":"Bay County","category":"Projected Resurfacing and Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2028 and FY2029","location":"Adalee Rd to Cul-de-sac","lat":30.251035,"lng":-85.508275,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7455)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2027-10-01","date_end":"2029-09-30","date_precision":"range"},{"name":"Mc Elvey Rd","government":"Bay County","category":"Projected Resurfacing and Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2028 and FY2029","location":"Holley Ln to Holley Ln","lat":30.181553,"lng":-85.768937,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7456)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2027-10-01","date_end":"2029-09-30","date_precision":"range"},{"name":"Wood Cir","government":"Bay County","category":"Projected Resurfacing and Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2028 and FY2029","location":"Scenic Dr to End","lat":30.252185,"lng":-85.49929,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7457)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2027-10-01","date_end":"2029-09-30","date_precision":"range"},{"name":"Cluster Rd","government":"Bay County","category":"Projected Resurfacing and Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2028 and FY2029","location":"Bayou George Dr to Adalee Rd","lat":30.253945,"lng":-85.5094,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7458)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2027-10-01","date_end":"2029-09-30","date_precision":"range"},{"name":"Scenic Dr","government":"Bay County","category":"Projected Resurfacing and Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2028 and FY2029","location":"John Pitts Rd to Wood Cir","lat":30.250255,"lng":-85.500015,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7459)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2027-10-01","date_end":"2029-09-30","date_precision":"range"},{"name":"Blue Springs Rd","government":"Bay County","category":"Projected Resurfacing and Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2028 and FY2029","location":"Mashburn Rd to SR 20","lat":30.424628,"lng":-85.533751,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7460)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2027-10-01","date_end":"2029-09-30","date_precision":"range"},{"name":"Mc Elvey Rd","government":"Bay County","category":"Projected Resurfacing and Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2028 and FY2029","location":"Thomas Dr to Holley Ln","lat":30.182205,"lng":-85.76324,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7461)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2027-10-01","date_end":"2029-09-30","date_precision":"range"},{"name":"Jan Cooley Dr","government":"Bay County","category":"Projected Resurfacing and Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2028 and FY2029","location":"Delwood Beach Rd to Mariner Dr","lat":30.143652,"lng":-85.72359,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7462)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2027-10-01","date_end":"2029-09-30","date_precision":"range"},{"name":"Blue Springs Rd","government":"Bay County","category":"Projected Resurfacing and Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2028 and FY2029","location":"CR 388 to Cemetary","lat":30.397991,"lng":-85.532414,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7463)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2027-10-01","date_end":"2029-09-30","date_precision":"range"},{"name":"Yukon Rd","government":"Bay County","category":"Projected Resurfacing and Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2028 and FY2029","location":"Brandon Rd to John Pitts Rd","lat":30.24959,"lng":-85.506745,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7464)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2027-10-01","date_end":"2029-09-30","date_precision":"range"},{"name":"Bayou George Rd","government":"Bay County","category":"Projected Resurfacing and Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2028 and FY2029","location":"Dead End to End","lat":30.252661,"lng":-85.518091,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7465)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2027-10-01","date_end":"2029-09-30","date_precision":"range"},{"name":"Ural St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Sunset Ave to S Lagoon Dr","lat":30.158855,"lng":-85.77154,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7534)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Quail St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Pinetree Ave to S Lagoon Dr","lat":30.154785,"lng":-85.764415,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7535)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Vicar St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"S Lagoon Dr to Sunset Ave","lat":30.159745,"lng":-85.77296,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7536)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Upas St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Beach Dr to Sunset Ave","lat":30.157545,"lng":-85.77144,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7537)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Raven St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Beach Dr to S Lagoon Dr","lat":30.154655,"lng":-85.76599,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7538)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Safari St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Sunset Ave to S Lagoon Dr","lat":30.15643,"lng":-85.768025,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7539)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Crescent Dr","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Thomas Dr to End","lat":30.149215,"lng":-85.76368,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7540)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Crescent Dr","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Beach Dr to Sunset Ave","lat":30.15065,"lng":-85.76247,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7541)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Xavier St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Thomas Dr to Beach Dr","lat":30.16027,"lng":-85.77713,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7542)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Wand St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Sunset Ave to S Lagoon Dr","lat":30.160805,"lng":-85.77456,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7543)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Xavier St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Beach Dr to Sunset Ave","lat":30.160935,"lng":-85.776545,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7544)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Beach Dr","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Luff St to Dolphin Dr","lat":30.147545,"lng":-85.759295,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7545)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Vega St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Sunset Ave to S Lagoon Dr","lat":30.16037,"lng":-85.773785,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7546)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Safari St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Thomas Dr to Gulf Dr","lat":30.1543,"lng":-85.770335,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7547)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Crescent Dr","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Sunset Ave to Pinetree Ave","lat":30.15124,"lng":-85.761845,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7548)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Sabine St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Beach Dr to S Lagoon Dr","lat":30.15559,"lng":-85.767775,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7549)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Walnut St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Sunset Ave to Beach Dr","lat":30.15983,"lng":-85.7749,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7550)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Ray St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"S Lagoon Dr to Sunset Ave","lat":30.15539,"lng":-85.76663,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7551)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Taurus St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Sunset Ave to S Lagoon Dr","lat":30.157095,"lng":-85.76896,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7552)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Raven St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Thomas Dr to Beach Dr","lat":30.15338,"lng":-85.76719,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7553)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Crescent Dr","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Thomas Dr to Beach Dr","lat":30.15005,"lng":-85.763105,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7554)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Upas St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"S Lagoon Dr to Sunset Ave","lat":30.158305,"lng":-85.770725,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7555)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Quarts St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Beach Dr to S Lagoon Dr","lat":30.153735,"lng":-85.76411,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7556)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Sunset Ave","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Luff St to Biltmore Dr","lat":30.14667,"lng":-85.75686,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7557)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Python St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Hilltop Ave to S Lagoon Dr","lat":30.15402,"lng":-85.76229,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7558)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Biltmore Dr","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Thomas Dr to Cul-de-sac","lat":30.147147,"lng":-85.754896,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7559)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Hilltop Ave","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Dolphin Dr to Quarts St","lat":30.152175,"lng":-85.760965,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7560)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Wasp St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Sunset Ave to S Lagoon Dr","lat":30.161405,"lng":-85.77546,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7561)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Oriole St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Sunset Ave to S Lagoon Dr","lat":30.150965,"lng":-85.760395,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7562)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Walnut St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Thomas Dr to Beach Dr","lat":30.15917,"lng":-85.77547,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7563)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Beach Dr","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Quarts St to Raven St","lat":30.153085,"lng":-85.76608,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7564)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Beach Dr","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Holiday Dr to Upas St","lat":30.156665,"lng":-85.770885,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7565)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Beach Dr","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"Upas St to Venus St","lat":30.157735,"lng":-85.77248,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7566)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"W 25th St","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Flower Ave to End","lat":30.194445,"lng":-85.689605,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7567)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E Game Farm Rd","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"US 231 to N East Ave","lat":30.198755,"lng":-85.626295,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7568)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Kelly St","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"PCB Parkway to Front Beach Rd","lat":30.258165,"lng":-85.95794,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7569)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Cherokee St","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Bayhead Rd to Indian Bluff Rd","lat":30.31049,"lng":-85.573605,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7570)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Hitchcock Rd","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Resota Beach Rd to End","lat":30.337105,"lng":-85.594815,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7571)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Sarasota Ave","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"US 231 to Baldwin Rd","lat":30.200895,"lng":-85.626975,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7572)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Bay Line Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"US 231 to 3505' SE","lat":30.267899,"lng":-85.522689,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7573)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Hitchcock Rd","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Hichcock Rd to Cul-de-sac","lat":30.337445,"lng":-85.591585,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7574)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Fulton St","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"SR 77 to Harris Marine","lat":30.284214,"lng":-85.637923,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7575)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E 14th St","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"East Ave to Everitt Ave","lat":30.173065,"lng":-85.622855,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7576)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Kraft Ave","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"15th St to 16th St","lat":30.176115,"lng":-85.622455,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7577)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E 43rd St","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Mill Bayou Rd to Zollie Young Park","lat":30.225905,"lng":-85.59944,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7578)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Jarvis Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"US 231 to Stephen Dr","lat":30.257125,"lng":-85.547425,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7579)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Edward Ave","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"W Game Farm Rd to W Orlando Rd","lat":30.199655,"lng":-85.63066,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7580)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Gwendolen Ct","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Everitt Ave to Cul-de-sac","lat":30.18029,"lng":-85.621575,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7581)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E 13th Ct","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Everitt Ave to Cul-de-sac","lat":30.171754,"lng":-85.618644,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7582)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Charles Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Jarvis Dr to End","lat":30.257803,"lng":-85.548311,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7583)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Selma Ave","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"US 231 to Baldwin Rd","lat":30.20055,"lng":-85.62798,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7584)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Canal Ave","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Game Farm Rd to W Orlando Rd","lat":30.19957,"lng":-85.633305,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7585)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"W Pierson Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Pierson Dr to 606' N on W Pierson Dr","lat":30.243925,"lng":-85.62209,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7586)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Bob Loftin Ave","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"15th St to End","lat":30.175755,"lng":-85.621745,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7587)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"N Harris Ave","government":"City of Panama City","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"24th Plz to US 231","lat":30.19137,"lng":-85.63945,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7588)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Pine Log Rd","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Mullins Rd to Otter Creek Bridge Rd","lat":30.40241,"lng":-85.925032,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7589)&outFields=*&outSR=4326&f=json","schedule_programmed_total":750000,"schedule_fy_amounts":{"2021":750000},"schedule_line":"Pine Log Road","schedule_match_method":"exact name","schedule_source_url":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Everitt Ave","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"15th St to 17th St","lat":30.176755,"lng":-85.620535,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7590)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E 13th St","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"East Ave to Everitt Ave","lat":30.17124,"lng":-85.62292,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7591)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Everitt Ave","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"17th St to Cynthia Ct","lat":30.17897,"lng":-85.620525,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7592)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Bowman Ln","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Britton Rd to Cul-de-sac","lat":30.239135,"lng":-85.62465,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7593)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Kirkilin Ave","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"E 11th St to End","lat":30.16838,"lng":-85.636525,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7594)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Kraft Ave","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"14th St to 15th St","lat":30.173925,"lng":-85.622825,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7595)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Hyde Ave","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"US 231 to Baldwin Rd","lat":30.202025,"lng":-85.62381,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7596)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E 16th St","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"N James Ave to End","lat":30.17725,"lng":-85.62254,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7597)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Coleridge Rd","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"599' E of Star Ave to Colonial Dr","lat":30.133496,"lng":-85.563333,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7598)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Jamedon Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"W 28th Pl to Cul-de-sac","lat":30.199175,"lng":-85.680505,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7599)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Ard Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"CR2301 to Cul-de-sac","lat":30.333769,"lng":-85.552535,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7600)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Camp Flowers Rd","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Bridge 464414 to US 231","lat":30.313378,"lng":-85.491139,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7601)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"N Gray Ave","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"13th St to 15th St","lat":30.17302,"lng":-85.626185,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7602)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Mc Kenzie Ave","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Highpoint Rd to Halsey Cir","lat":30.29541,"lng":-85.573715,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7603)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Wedgewood Ln","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"CR 2301 to Wedgewood Ln","lat":30.32671,"lng":-85.55329,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7604)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Malaga Pl","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Front Beach Rd to PCB Pkwy","lat":30.24366,"lng":-85.927085,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7605)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Resota Beach Rd","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Bridge 464503 to Hitchcock Rd","lat":30.32401,"lng":-85.598775,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7606)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Foxworth Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Foxworth Dr to Cul-de-sac","lat":30.205745,"lng":-85.693975,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7607)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Fredrickson St","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Resota Beach Rd to Silverleaf Ave","lat":30.308955,"lng":-85.60054,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7608)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Star Ave","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Old Bicycle Rd to Coleridge Rd","lat":30.137115,"lng":-85.564645,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7609)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Nassau St","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"3rd St to 1st St","lat":30.29157,"lng":-85.64858,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7610)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Blanche Ave","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Highpoint Rd to Halcyon Dr","lat":30.297125,"lng":-85.578595,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7611)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Resota Ln","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Resota Beach Rd to 1073' S","lat":30.284045,"lng":-85.600255,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7612)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Resota Beach Rd","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Resota Beach Ln to Bridge 464503","lat":30.29824,"lng":-85.599445,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7613)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Jaycee Rd","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Jaycee Dr to Jammie Rd","lat":30.31448,"lng":-85.552625,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7614)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Bay Ave","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Seminole St to Osceola St","lat":30.30611,"lng":-85.576695,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7615)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Resota Beach Rd","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"CR 2321 to Resota Beach Ln","lat":30.285555,"lng":-85.604875,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7616)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Toepfer Blvd","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Sandra Rd to Cul-de-sac","lat":30.273105,"lng":-85.62738,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7617)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Tracey Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Old Bicycle to Old Bicycle including cut through section","lat":30.135653,"lng":-85.557401,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7618)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Sarasota Ave","government":"City of Lynn Haven","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Baldwin Rd to CR 389","lat":30.205785,"lng":-85.626795,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7619)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"lh","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Martin Cir","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"S Bear Creek to Cul-de-sac","lat":30.316595,"lng":-85.451315,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7620)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Riley Rd","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"SR77 to Riley Rd at curve","lat":30.2916,"lng":-85.641435,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7621)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Callahan St","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"SR 77 to Anderson St","lat":30.273795,"lng":-85.642595,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7622)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Harlan Shope Rd","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"CR 2321 to Cul-de-sac","lat":30.262725,"lng":-85.59524,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7623)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Frank Hough Rd","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Cherokee Heights Rd to Shannon Ln","lat":30.235545,"lng":-85.56649,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7624)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Resota Beach Rd","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Cedar Bluff Rd to Cul-de-sac","lat":30.346025,"lng":-85.606387,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7625)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Lanelle Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Airport Rd  Cul-de-sac","lat":30.19387,"lng":-85.68608,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7626)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"3rd St","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Calhoun Ave to Nassau St","lat":30.290595,"lng":-85.64714,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7627)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Bollinger Rd","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"CR 2311 to Morgan Rd","lat":30.26352,"lng":-85.58036,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7628)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Earl Sapp Rd","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"CR 2321 to Tom Nichols Rd","lat":30.260212,"lng":-85.59248,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7629)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"23rd Ct","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Pretty Bayou Dr to Bayview Ave","lat":30.19074,"lng":-85.70294,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7630)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Ashland Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Collegiate Ln to Ashland Rd","lat":30.19112,"lng":-85.71798,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7631)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Derby Woods Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Harvard Blvd to Belmont Blvd","lat":30.237781,"lng":-85.620885,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7632)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Fox Run","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Wildridge Rd to Cul-de-sac","lat":30.226945,"lng":-85.662475,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7633)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Nelson St","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"East Ave to End","lat":30.143245,"lng":-85.624655,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7634)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E 9th St","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"E Pierson to 300 W of Radcliff","lat":30.24501,"lng":-85.61916,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7635)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"W 27th St","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Airport Rd to Frankford Ave","lat":30.19697,"lng":-85.68968,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7636)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E Pierson Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Pierson Dr to 523' N on E Pierson","lat":30.24375,"lng":-85.62116,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7637)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E 9th St","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Harvard Blvd to 300' W of Radcliff","lat":30.245025,"lng":-85.616145,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7638)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Trinity St","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"N Bay Ct to N Bay Dr","lat":30.250187,"lng":-85.615649,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7639)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Margaret Cir","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Ferol Ln to Cul-de-sac","lat":30.243895,"lng":-85.607835,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7640)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Martha Ln","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Britton Rd to Cul-de-sac","lat":30.23732,"lng":-85.62467,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7641)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"W 25th St","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Mound Ave to End","lat":30.193385,"lng":-85.715225,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7642)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Yellow Bluff Rd","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"S Star Ave to Pocahontas St","lat":30.140499,"lng":-85.566292,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7643)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Flower Ave","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"W 24th St to W 25th St","lat":30.193485,"lng":-85.689,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7644)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Fireside Ct","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Kings Dr to Kings Dr","lat":30.20185,"lng":-85.70096,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7645)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Sunshine Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Sunshine Dr to Cul-de-sac","lat":30.31711,"lng":-85.57231,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7646,7732)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Joan Ave","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Front Beach Rd to N Lagoon Dr","lat":30.17665,"lng":-85.78979,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7647)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Quail Run","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Wild Ridge Rd to Cul-de-sac","lat":30.22828,"lng":-85.66318,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7648)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Tech Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"9th St to 12th St","lat":30.242755,"lng":-85.61836,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7649)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Brooke Ln","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Transmitter Rd to Cul-de-sac","lat":30.21717,"lng":-85.60664,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7650)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Pine Ridge Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Jenks Ave to Jenks Ave","lat":30.206956,"lng":-85.663745,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7651)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Deer Point Lake Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Resota Beach Rd to Resota Beach Rd","lat":30.312903,"lng":-85.594764,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7652)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Moylan Rd","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Front Beach to PCB Pkwy","lat":30.185535,"lng":-85.792715,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7653)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Pierson Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"12th St to Intersection with W & E Pierson Drives","lat":30.241825,"lng":-85.62169,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7654)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Fanning Bayou Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Market St to Sale Blvd","lat":30.28144,"lng":-85.64469,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7655)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Santa Anita Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Belmont Blvd to Derby Woods Dr","lat":30.234171,"lng":-85.615725,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7656)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Bob Jones Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"College Dr to Cul-de-sac","lat":30.24238,"lng":-85.612845,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7657)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"W 25th St","government":"City of Panama City","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Fortune Ave to End","lat":30.19447,"lng":-85.68821,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7658)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Pine Ave","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Cherokee St to Park Av","lat":30.310835,"lng":-85.57665,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7659)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Eisenhower Cir","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Harvard Blvd to 12th St","lat":30.239227,"lng":-85.615946,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7660)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Chelsea Ln","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Britton Rd to Cul-de-sac","lat":30.24279,"lng":-85.624595,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7661)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Doe Run","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Resota Beach Rd to Cul-de-sac","lat":30.31763,"lng":-85.600659,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7662)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"S Gainer Bayou Rd","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"CR 2321 to Bay Crest Rd","lat":30.285105,"lng":-85.622255,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7663)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Creamer Rd","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Riley Rd to End","lat":30.292565,"lng":-85.639525,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7664)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Gravelle Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Fredrickson St to Resota Beach Rd","lat":30.308085,"lng":-85.597777,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7665)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Joan Ave","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"N Lagoon Dr to Thomas Dr (CR 392)","lat":30.170155,"lng":-85.789805,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7666)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Wedgewood Cir","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"CR 2301 to CR 2301","lat":30.325283,"lng":-85.554479,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7667)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Glensway Rd","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Pacesetter Rd to Cul-de-sac","lat":30.25067,"lng":-85.56257,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7668)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Plantation Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Plantation Way to 2009' S of Plantation Way","lat":30.12891,"lng":-85.559645,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7669)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Kingslee Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Woodcrest Blvd to Cul-de-sac","lat":30.40113,"lng":-85.720255,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7670)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Christopher Cir","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Sunshine Dr to Cul-de-sac","lat":30.316825,"lng":-85.57035,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7671)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Doe Cir","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Doe Run to Cul-de-sac","lat":30.317125,"lng":-85.600295,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7672)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Squirrel Run","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Wildridge Rd to Cul-de-sac","lat":30.22702,"lng":-85.665515,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7673)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Diane Ln","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Cul-de-sac W to Cul-de-sac E","lat":30.250275,"lng":-85.52968,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7674)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Pinetree Ln","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Goose Bayou Rd to Cul-de-sac","lat":30.227435,"lng":-85.67873,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7675)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Frank Hough Rd","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Shannon Ln E 166'","lat":30.235535,"lng":-85.565435,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7676)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"W 30th St","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Airport Rd to EOP","lat":30.20295,"lng":-85.68844,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7677)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Robinson Bayou Cir","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"W 33rd St to W 33rd St","lat":30.209629,"lng":-85.696912,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7678)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Sunshine Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Indian Bluff Rd to Indian Bluff Rd","lat":30.317402,"lng":-85.570361,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7679)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"College Blvd","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Harvard Blvd to N College Blvd","lat":30.240515,"lng":-85.614005,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7680)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Samuel Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"CR 2301 to End","lat":30.28901,"lng":-85.53951,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7681)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"W Lakeland Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"CR 2311 to Cul-de-sac","lat":30.28061,"lng":-85.588406,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7682)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Resota Ln","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Resota Beach Rd to Resota Ln","lat":30.285355,"lng":-85.60042,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7683)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Deep Water Ct","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"McKenzie Ave to Cul-de-sac","lat":30.296705,"lng":-85.57311,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7684)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Walton Ave","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"1st St to 2nd St","lat":30.292075,"lng":-85.654945,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7685)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Rainelli Ct","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"E 10th St to End","lat":30.164625,"lng":-85.568805,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7686)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Joanna Ln","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Resota Ln to End of Pavement","lat":30.285352,"lng":-85.59932,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7687)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Fargo St","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Mittie Ave to Vesta Ave","lat":30.297655,"lng":-85.57691,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7688)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Skywater Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"W Lakeland Dr to Cul-de-sac","lat":30.281105,"lng":-85.58664,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7689)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Betty Ln","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"John Pitts Rd to Diane Ln","lat":30.249195,"lng":-85.52876,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7690)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"4th St","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Liberty Ave to Railroad Ave","lat":30.29013,"lng":-85.643235,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7691)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Kings Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Kings Dr Center Crossing","lat":30.20185,"lng":-85.70212,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7692)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Picadilly Ln","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Transmitter Rd to Cul-de-sac","lat":30.2235,"lng":-85.608065,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7693)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Cabin Rd","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Bollinger Rd to End","lat":30.26246,"lng":-85.58244,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7694)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Gilchrist Ave","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Highpoint Rd to End","lat":30.297185,"lng":-85.574755,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7695)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Britton Ln","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Britton Rd to Cul-de-sac","lat":30.23823,"lng":-85.624665,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7696)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Valla St","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"East Ave to End","lat":30.145395,"lng":-85.624625,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7697)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"W 30th St","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Lisenby Ave to Airport Blvd","lat":30.20288,"lng":-85.68189,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7698)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Silverleaf Ave","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Sherrett Dr to Frederickson St","lat":30.309905,"lng":-85.602315,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7699)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Pecan Ave","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Palm Ave to Cul-de-sac","lat":30.313423,"lng":-85.579514,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7700)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Lake Suzzanne Cir","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Lake Suzzanne Cir to Cul-de-sac","lat":30.266005,"lng":-85.52785,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7701)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"S Lake Joanna Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"S Lake Joanna Dr to Cul-de-sac","lat":30.264155,"lng":-85.529315,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7702)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Cocoa Ave","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Game Farm Rd to Orlando Rd","lat":30.199565,"lng":-85.61969,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7703)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Ferol Ln","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"9th St to 9th St","lat":30.245051,"lng":-85.609847,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7704)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Woodhaven Pl","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Harvard Blvd to Cul-de-sac","lat":30.23737,"lng":-85.61407,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7705)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"W 33rd Pl","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Jenks Ave to End","lat":30.209215,"lng":-85.663325,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7706)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Rita St","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"CR 389 to End","lat":30.2377,"lng":-85.62699,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7707)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Washington St","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"N Bay Dr to N Bay Dr","lat":30.253245,"lng":-85.61548,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7708)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Goose Bayou Rd","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Northshore Rd to Bingoose Ln","lat":30.228345,"lng":-85.675545,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7709)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Pipeline Rd","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"US 231 to SR 390","lat":30.229335,"lng":-85.59053,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7710)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Lark Ln","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Transmitter Rd to End","lat":30.199735,"lng":-85.605575,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7711)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"W 35th Ct","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"State Ave to Cul-de-sac","lat":30.21193,"lng":-85.665545,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7712)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Placido Pl","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Del Mar Dr to Alta Vista Dr","lat":30.23975,"lng":-85.91819,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7713)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Oleander Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Front Beach Rd to PCB Pkwy","lat":30.248545,"lng":-85.936645,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7714)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"E 43rd St","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Cato Rd to Mill Bayou Rd","lat":30.22588,"lng":-85.59688,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7715)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Kirkwell Ave","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Orlando Rd to E Baldwin Rd","lat":30.20133,"lng":-85.63742,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7716)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Amelia Ave","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Orlando Rd to Game Farm Rd","lat":30.19943,"lng":-85.61238,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7717)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Eagle Ln","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Transmitter Rd to End","lat":30.201415,"lng":-85.605605,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7718)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Northshore Cir","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"North Shore Rd to Cul-de-sac","lat":30.22907,"lng":-85.66964,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7719)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Pittsburgh St","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Star Ave to N Berthe Ave","lat":30.1591,"lng":-85.569925,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7720)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Le Grand Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"PCB Pkwy to End","lat":30.254155,"lng":-85.949927,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7721)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Hagler Ave","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Sherman Ln to Ten Acre Rd","lat":30.194205,"lng":-85.627075,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7722)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Stewart Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Star Ave to John Pitts Rd","lat":30.243555,"lng":-85.55071,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7723)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Frank Hough Rd","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"166' E of Shannon Ln to Star Ave","lat":30.235495,"lng":-85.560985,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7724)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Allanton Rd","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"CR 2297 to Eastern Shipbuilding Dr","lat":30.042395,"lng":-85.47976,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7725)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Wedgewood Ln","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"CR 2301 to Cul-de-sac","lat":30.327095,"lng":-85.55398,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7726)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Titus Rd","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"US 231 to CR 2321","lat":30.248195,"lng":-85.568215,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7727)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Lake Joanna Dr","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Bayou George Dr to Lake Suzanne Pl","lat":30.264235,"lng":-85.525835,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7728)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Everitt Ave","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Cynthia Ct to Tracy Lynn","lat":30.180765,"lng":-85.620535,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7729)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Greenleaf Cir","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Oak Knoll Rd to Cul-de-sac","lat":30.26495,"lng":-85.588575,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7730)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Cornell Dr","government":"City of Panama City","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Rollins Ave to Yale Ave","lat":30.194088,"lng":-85.680036,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7731)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"pc","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Osceola St","government":"Bay County","category":"Road Rehabilitation from Hurricane Michael","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Bayhead Rd to Bay Ave","lat":30.306535,"lng":-85.575705,"description":"Resurfacing partially funded by FEMA and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7733)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Seminole St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Bayhead Rd to Bay Ave","lat":30.30656,"lng":-85.57769,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7736)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"O Henry Dr","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"N Lagoon Dr to W/E O Henry Dr","lat":30.16205,"lng":-85.76753,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7737)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Pine Dr","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Thomas Dr (South entrance) to 90 degree curve where Open Grade begins","lat":30.159675,"lng":-85.75433,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7738)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Pine Dr","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Beech St to 90 degree curve to change to Open Grade","lat":30.15971,"lng":-85.7559,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7739)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Emerson Dr","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"O'Henry Dr to Lee St","lat":30.160775,"lng":-85.76787,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7740)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Laurel Oak Ln","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"N Lagoon Dr to Cul-de-sac","lat":30.1638,"lng":-85.7701,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7741)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Courtney Dr","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"N Lagoon Dr to Cul-de-sac","lat":30.160005,"lng":-85.75984,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7742)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Jay St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"N Lagoon Dr to End of Cul-de-sac","lat":30.1616,"lng":-85.764835,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7743)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Gulf Dr","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Holiday Dr to 208' E of Safari St","lat":30.153935,"lng":-85.771035,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7744)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Lagoon Dr","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Jay St to Lee St","lat":30.16012,"lng":-85.766535,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7745)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Jay St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"N Lagoon Dr to Lagoon Dr","lat":30.160615,"lng":-85.76557,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7746)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Nova St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Thomas Dr to Gulf Dr","lat":30.1479,"lng":-85.762055,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7747)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Beth Ave","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Jay St to Cul-de-sac","lat":30.16196,"lng":-85.76434,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7748)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Lagoon Way","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Biltmore Dr to End","lat":30.14723,"lng":-85.753475,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7749)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Lee St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"N Lagoon Dr to Emerson Dr","lat":30.16098,"lng":-85.76655,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7750)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Biltmore Dr","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Gulf Dr to Thomas Dr","lat":30.144555,"lng":-85.75768,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7751)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Caraway Ln","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Deerwood Rd to End of Pavement","lat":30.279585,"lng":-85.61846,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7752)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Erin Lea Ln","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Clara Ave to Cul-de-sac","lat":30.202235,"lng":-85.834325,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7753)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Laird Cir","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Laird St to Laird St","lat":30.181471,"lng":-85.775109,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7754)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Wildwood Dr","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Old Bicycle Rd to Cul-de-sac","lat":30.139762,"lng":-85.511955,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7755)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Kingman St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Laird St to Laird St","lat":30.179515,"lng":-85.767128,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7756)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Robertson Ln","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Jan Cooley Dr to  Mariner Dr","lat":30.13865,"lng":-85.720375,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7757)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"W O Henry Dr","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"O'Henry Dr Intersection to Emerson","lat":30.16145,"lng":-85.76807,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7758)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Terrell St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Laurie Ave to Cul-de-sac","lat":30.17496,"lng":-85.78041,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7759)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Houston St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Laurie Ave to Cul-de-sac","lat":30.175875,"lng":-85.78038,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7760)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Bonita St","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Surf Dr to Thomas Dr","lat":30.16583,"lng":-85.787415,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7761)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Polly Ave","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Allison Ave to Lagoon Knoll Dr","lat":30.172215,"lng":-85.787365,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7762)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Palm Ct","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Bay Ave to Magnolia Ave","lat":30.15452,"lng":-85.75503,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7763)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Mariner Dr","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Jan Cooley Dr to End (Includes Segment at curve)","lat":30.140233,"lng":-85.720044,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7764)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Flint Ave","government":"Bay County","category":"Local Road Microsurfacing","status":"completed","pct_complete":100,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2023","location":"Thomas Dr to Benbow St","lat":30.14368,"lng":-85.75031,"description":null,"source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7765)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2022-10-01","date_end":"2023-09-30","date_precision":"fiscal_year"},{"name":"Highway 2321","government":"Bay County","category":"Resurfacing","status":"in_progress","pct_complete":90,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":"FY2026","location":"US Hwy 231 to Bridge 464006","lat":30.254538,"lng":-85.584656,"description":"Resurfacing partially funded by SCOP and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7766)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":"2025-10-01","date_end":"2026-09-30","date_precision":"fiscal_year"},{"name":"Highway 2321","government":"Bay County","category":"Projected Resurfacing and Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"SR 77 to Bridge 464004","lat":30.285725,"lng":-85.62865,"description":"Future Resurfacing project partially funded by SCOP and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7767)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"Highway 2321","government":"Bay County","category":"Projected Resurfacing and Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Bridge 464005 to Bridge 464004","lat":30.282951,"lng":-85.608146,"description":"Future Resurfacing project partially funded by SCOP and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7768)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"},{"name":"HIGHWAY 2321","government":"Bay County","category":"Projected Resurfacing and Reconstruction","status":"not_started","pct_complete":0,"promised_cost":null,"programmed_cost":null,"actual_cost":null,"fiscal_years":null,"location":"Bridge 464006 to Bridge 464005","lat":30.269845,"lng":-85.60781,"description":"Future Resurfacing project partially funded by SCOP and surtax","source_url":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7769)&outFields=*&outSR=4326&f=json","schedule_programmed_total":null,"schedule_fy_amounts":null,"schedule_line":null,"schedule_match_method":null,"schedule_source_url":null,"gov_id":"county","date_start":null,"date_end":null,"date_precision":"unknown"}]