{"about":"BayCounty.me Accountability console: public projects from first budget to close-out, with timeline events, flags from published rules, records still missing, and each agency's reply. A flag is a question for the agency, not a finding of wrongdoing.","rules":[{"id":"growth","title":"Cost grew more than 10%","when":"The latest firm figure (final cost, current contract total or current project estimate) is more than 10% above the first firm figure (the award or first budget). Over 25% is marked high.","means":"The project costs noticeably more than the public was first told. Bay County and Panama City require board approval once change orders pass 10%.","not":"It does not mean money was wasted. Scope added on purpose, design and land costs, and price changes all raise totals. The flag asks the agency to explain the difference."},{"id":"late","title":"Running late","when":"A source reports the project finished more than 90 days after its schedule, or a sales tax project is not complete after the last year it was programmed for. Over a year is marked high.","means":"The public waited longer than planned, which often costs money too.","not":"Delays are often caused by utilities, permits, storms or grant timing outside the agency's control."},{"id":"conflict","title":"Figures don't agree","when":"Two or more public documents give different amounts for the same project and period.","means":"Residents cannot tell from the public record what the project costs or what was spent.","not":"The documents may count different things (one phase, the CRA share, the whole project). The agency can settle it with one breakdown."},{"id":"payee","title":"Who was paid isn't public yet","when":"Money was spent or committed, but no record we have names the contractor or seller, or states the price.","means":"The public cannot check who received the money or for how much.","not":"The information usually exists in the agency's files; it just wasn't in the report we read. A records request will usually get it."},{"id":"mixed","title":"Local share unclear","when":"The project mixes CRA or city money with state or federal grants, and no record says how much is local tax money.","means":"The totals shown overstate what local taxpayers paid, by an unknown amount.","not":"Grants are good for local taxpayers. The flag is only about knowing the split."},{"id":"budget","title":"Budgeted, but spending not shown","when":"A budget was set, but actual spending is under half of it for a year that has ended, or no record of actual spending was found.","means":"The money may be sitting unspent, may have been moved, or the work stalled.","not":"Unspent budgets often roll over to the next year, and a delayed project may still be on track overall."},{"id":"approval","title":"Approval not found in the minutes","when":"A change order appeared on an agenda, but the meeting minutes we read do not record a vote approving it.","means":"We could not confirm the board approved the added cost.","not":"It may have been approved on a consent agenda, in minutes we have not read, or by staff within their authority."},{"id":"stack","title":"More than one incentive, same place","when":"One address or company receives more than one grant or rebate from the same agency.","means":"The total public support is easy to miss when each award is reported on its own.","not":"Programs usually allow this. The flag adds it up; it does not say it was wrong."},{"id":"removed","title":"Dropped from the schedule","when":"A project was struck from the sales tax project schedule.","means":"Money promised to voters for this project went elsewhere or is on hold.","not":"Schedules are amended when costs, grants or priorities change; the replacement project may be listed."}],"stats":{"projects":94,"flagged":43,"flags":51,"gaps":29,"replied":0,"sent":0,"money":399560465.28000003},"projects":[{"id":"pcb-fbr-seg2","n":"Front Beach Road Segment 2","gk":"pcb","g":"Panama City Beach","agency":"Panama City Beach CRA (Front Beach Road CRA)","where":"Front Beach Rd, South Thomas Dr to Richard Jackson Blvd","what":"Roadway, stormwater, underground utilities, sidewalks, lighting and trolley lanes.","funding":"CRA tax increment and bonds","status":"closed","src":"reviewed","ev":[{"d":"FY2015","k":"milestone","t":"First bids rejected as over budget","u":"https://www.pcbfl.gov/home/showpublisheddocument/20389/637915921100900000","s":"2015-09-30"},{"d":"2016-09-22","k":"award","a":14222000,"t":"Construction contract awarded to GAC Contractors, Inc.","payee":"GAC Contractors, Inc.","u":"https://www.pcbfl.gov/home/showpublisheddocument/20389/637915921100900000","vid":"gac-contractors","s":"2016-09-22"},{"d":"2019","k":"change","a":95363.82,"t":"Change order #17: red asphalt for the trolley lanes (Res. 19-123)","payee":"GAC Contractors, Inc.","u":"https://pcbfl.gov/home/showpublisheddocument/14612/637012047594470000","vid":"gac-contractors","s":"2019-07-01"},{"d":"2020-06-29","k":"change","a":13108.3,"t":"Change order #18: underground electrical at Los Rancheros (Res. 20-136). Contract price now $14,752,893.86","payee":"GAC Contractors, Inc.","u":"https://pcbfl.gov/home/showpublisheddocument/16813/637299759305930000","contract_total":14752893.86,"vid":"gac-contractors","s":"2020-06-29"},{"d":"FY2022","k":"complete","a":15988162,"t":"Closed out. Total project cost in the city's Capital Improvements Schedule (includes design and other costs, not only the construction contract)","u":"https://www.pcbfl.gov/home/showpublisheddocument/27668/638887882812000000","s":"2022-09-30"}],"flags":[],"gaps":[{"q":"Change orders #1 through #16 on the Front Beach Road Segment 2 construction contract with GAC Contractors, Inc. (awarded 2016-09-22), with the amount and reason for each","gk":"pcb"}],"base":{"a":14222000,"t":"construction contract at award"},"now":{"a":14752893.86,"t":"contract total after change orders"},"total":{"a":15988162,"t":"total project cost at close-out"},"contract":{"orig":14222000,"now":14752893.86},"growth":3.7,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2015-09-30","last":"2022-09-30","money":15988162,"vendor":null},{"id":"pcb-fbr-seg3","n":"Front Beach Road Segment 3 / South Arnold Road (SR 79)","gk":"pcb","g":"Panama City Beach","agency":"Panama City Beach CRA (Front Beach Road CRA)","where":"Front Beach Rd and S Arnold Rd, with the roundabout at their intersection","what":"Added lanes, a roundabout, sidewalks, lighting, underground utilities and stormwater.","funding":"CRA, FDOT and a property-owner share","status":"complete","src":"reviewed","ev":[{"d":"2019-07-11","k":"milestone","t":"Eminent domain approved for right-of-way at the SR 79 / Front Beach Rd intersection (Res. 19-110). Compensation not stated","u":"https://pcbfl.gov/home/showpublisheddocument/14481/637153770711070000","s":"2019-07-11"},{"d":"2021-03","k":"award","a":28000000,"approx":true,"t":"Construction bid awarded (Res. 21-127). The city's Segment 3 page puts the low bid at about $28 million","payee":"GAC Contractors (later CWR Contracting, Inc.)","u":"https://www.pcbfl.gov/home/showpublisheddocument/27668/638887882812000000","vid":"gac-contractors","s":"2021-03-15"},{"d":"2021-03","k":"award","a":524820,"t":"Dewberry Engineers task order: construction administration and night/weekend inspection (Res. 21-121), maximum","payee":"Dewberry Engineers, Inc.","u":"https://pcbfl.gov/home/showpublisheddocument/24562/638512727553430000","side":true,"vid":"dewberry","s":"2021-03-15"},{"d":"2022-04-28","k":"payment","a":31882.5,"t":"Land settlement for right-of-way (Res. 22-138)","payee":"PCBH","u":"https://pcbfl.gov/home/showpublisheddocument/20080/637862365752130000","side":true,"s":"2022-04-28"},{"d":"2023-07-13","k":"change","a":28738.18,"t":"Change order #7: reconnect sewer for Muy Wayne O's (Res. 23-195). Change orders 4, 5 and 6 exist but their amounts could not be read","payee":"CWR Contracting, Inc.","u":"https://d3n9y02raazwpg.cloudfront.net/pcbgov/0d86e393-7c8e-11ed-9024-0050569183fa-b95fcb69-f19b-4652-8495-9f0a506dc971-1688747339.pdf","vid":"cwr-contracting","s":"2023-07-13"},{"d":"2023-10-26","k":"change","a":213320.1,"t":"Front Beach Road Segment 3 (CRA), change order 8 \u00b7 Additional work plus 30 days","payee":"CWR Contracting, Inc.","vid":"cwr-contracting","u":"https://pcbgov.granicus.com/AgendaViewer.php?view_id=1&clip_id=149","s":"2023-10-26"},{"d":"2024-05-09","k":"change","a":115547.8,"t":"Front Beach Road Segment 3 (CRA), change order 10 \u00b7 Interim overhead power service connections and light pole conflict foundations","payee":"CWR Contracting, Inc.","vid":"cwr-contracting","u":"https://pcbgov.granicus.com/AgendaViewer.php?view_id=1&clip_id=300","s":"2024-05-09"},{"d":"2024-05-09","k":"vote","t":"Change-order vote: passed 5-0","u":"https://d3n9y02raazwpg.cloudfront.net/pcbgov/3e5a730c-9878-11ee-a93d-0050569183fa-b95fcb69-f19b-4652-8495-9f0a506dc971-1716417684.pdf","tally":"5-0","members":{"Stuart Tettemer":"yes","Michael Jarman":"yes","Ethan Register":"yes","Paul Casto":"yes","Mary Coburn":"yes"},"s":"2024-05-09"},{"d":"2024-07-25","k":"change","a":150000.0,"t":"Front Beach Road Segment 3 (CRA), additional change-order contingency \u00b7 Contingency for future change orders (each within City Manager's $25,000 authority) for unforeseen conditions","payee":"CWR Contracting, Inc.","vid":"cwr-contracting","u":"https://pcbgov.granicus.com/AgendaViewer.php?view_id=1&clip_id=321","s":"2024-07-25"},{"d":"2024-07-25","k":"vote","t":"Change-order vote: passed 5-0","u":"https://d3n9y02raazwpg.cloudfront.net/pcbgov/36a48318-990b-11ee-a93d-0050569183fa-b95fcb69-f19b-4652-8495-9f0a506dc971-1723150621.pdf","tally":"5-0","members":{"Stuart Tettemer":"yes","Michael Jarman":"yes","Ethan Register":"yes","Paul Casto":"yes","Mary Coburn":"yes"},"s":"2024-07-25"},{"d":"2024-09-30","k":"spent","a":25425499,"t":"Spent to date in the Capital Improvements Schedule, against a total project cost of $30,895,199","u":"https://www.pcbfl.gov/home/showpublisheddocument/27668/638887882812000000","estimate":30895199,"s":"2024-09-30"},{"d":"2026-03-12","k":"change","a":1940623.36,"t":"Front Beach Road Segment 3 (CRA), change order 15 \u00b7 $440,439.61 for change directives over the life of the project (+9 days) and $1,500,183.75 for a delay claim at Lullwater box culvert (+375 days)","payee":"CWR Contracting, Inc.","vid":"cwr-contracting","u":"https://pcbgov.granicus.com/AgendaViewer.php?view_id=1&clip_id=393","s":"2026-03-12"},{"d":"2026-03","k":"payment","a":1900000,"t":"Council approves the final payment to CWR Contracting. WJHG reports about 375 days over schedule (utility conflicts, storm drain redesign) and a total near $32 million","payee":"CWR Contracting, Inc.","u":"https://www.wjhg.com/2026/03/13/front-beach-road-construction-project-is-complete-faced-delays/","news":true,"vid":"cwr-contracting","s":"2026-03-15"},{"d":"2026-03","k":"complete","a":32000000,"approx":true,"t":"Project complete. Reported total about $32 million (WMBB quoted the mayor at $32.5 million)","u":"https://www.wjhg.com/2026/03/13/front-beach-road-construction-project-is-complete-faced-delays/","news":true,"s":"2026-03-15"}],"flags":[{"r":"late","sev":"high","note":"Reported about 375 days behind schedule."},{"r":"conflict","sev":"warn","note":"Three different totals: $30,895,199 (city Capital Improvements Schedule), about $32 million (WJHG) and $32.5 million (the mayor, quoted by WMBB)."},{"r":"approval","sev":"warn","note":"At least one change order here was on an agenda, but the minutes we read do not record its approval."}],"gaps":[{"q":"All change orders (with amounts) on the Front Beach Road Segment 3 / SR 79 construction contract, including change orders 4, 5 and 6 (Res. 22-177, 22-191, 23-135), and the final contract reconciliation","gk":"pcb"},{"q":"The final cost of Front Beach Road Segment 3 / SR 79 by funding source (CRA, FDOT, property-owner share) and the compensation paid in each right-of-way condemnation","gk":"pcb"}],"base":{"a":28000000,"t":"low bid at award (about)"},"total":{"a":32000000,"t":"reported total at completion (about)"},"late_days":375,"sev":"high","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2019-07-11","last":"2026-03-15","money":32000000,"vendor":null},{"id":"pcb-fbr-seg41","n":"Front Beach Road Segment 4.1 (Lullwater Dr to Hills Rd)","gk":"pcb","g":"Panama City Beach","agency":"Panama City Beach CRA (Front Beach Road CRA)","where":"Front Beach Rd along Pier Park","what":"Design, right-of-way and utility relocation; construction to be design-build.","funding":"CRA with state and federal grants (FDEM HMGP for undergrounding)","status":"design","src":"reviewed","ev":[{"d":"2019","k":"award","a":1303389,"t":"Dewberry Engineers design task order (Res. 19-65)","payee":"Dewberry Engineers, Inc.","u":"https://pcbfl.gov/home/showpublisheddocument/13909/636870324888970000","vid":"dewberry","s":"2019-07-01"},{"d":"2019","k":"award","a":200000,"t":"Dewberry utility relocation design (Res. 19-66), paid from reserves","payee":"Dewberry Engineers, Inc.","u":"https://pcbfl.gov/home/showpublisheddocument/13911/636870324908030000","vid":"dewberry","s":"2019-07-01"},{"d":"2021-02","k":"payment","a":22239.36,"t":"Right-of-way purchase at Powell Adams Rd (Res. 21-87); amended in 2022, amended amount not found","payee":"Palmetto Hospitality of PCB, LLC","u":"https://pcbfl.gov/home/showpublisheddocument/17572/637492468223200000","s":"2021-02-15"},{"d":"2021-07","k":"award","a":59910,"t":"Dewberry construction administration at Powell Adams Rd (Res. 21-186), not to exceed","payee":"Dewberry Engineers, Inc.","u":"https://pcbfl.gov/home/showpublisheddocument/18386/637629761850100000","vid":"dewberry","s":"2021-07-15"},{"d":"2023","k":"estimate","a":14000000,"approx":true,"t":"News Herald estimate: more than $14 million","news":true,"u":"https://www.pcbfl.gov/home/showpublisheddocument/27668/638887882812000000","via":true,"s":"2023-07-01"},{"d":"2024-09-30","k":"spent","a":3372491,"t":"Spent to date, against a total project cost of $59,780,491 in the Capital Improvements Schedule","u":"https://www.pcbfl.gov/home/showpublisheddocument/27668/638887882812000000","estimate":59780491,"s":"2024-09-30"},{"d":"2026-10","k":"milestone","t":"Design-build proposals due (bid #27)","u":"https://www.pcbfl.gov/home/showpublisheddocument/27668/638887882812000000","via":true,"s":"2026-10-15"}],"flags":[{"r":"conflict","sev":"warn","note":"A 2023 News Herald estimate of more than $14 million and a $59.8 million total project cost in the city's own schedule. The two may not count the same things; the city's breakdown would settle it."},{"r":"mixed","sev":"warn","note":"The schedule lists CRA money alongside state and federal grants, so the CRA's own share is smaller than the totals shown."}],"gaps":[{"q":"The current cost estimate for Front Beach Road Segment 4.1, broken down by design, right-of-way, utilities and construction, and by funding source","gk":"pcb"}],"total":{"a":59780491,"t":"current total project cost","open":true},"sev":"warn","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2019-07-01","last":"2026-10-15","money":59780491,"vendor":null},{"id":"pcb-fbr-seg42","n":"Front Beach Road Segment 4.2 (Hills Rd to Lantana St)","gk":"pcb","g":"Panama City Beach","agency":"Panama City Beach CRA (Front Beach Road CRA)","where":"Front Beach Rd, east of Hills Rd to Hutchison Blvd, with a roundabout at Lantana/Hutchison","what":"Design, right-of-way and utility relocation.","funding":"CRA with state and federal grants","status":"design","src":"reviewed","ev":[{"d":"2020-05-14","k":"award","a":1551128.46,"t":"Dewberry design task order (Res. 20-108); construction inspection not included","payee":"Dewberry Engineers, Inc.","u":"https://pcbfl.gov/home/showpublisheddocument/16673/637266931768470000","vid":"dewberry","s":"2020-05-14"},{"d":"2021-05-13","k":"award","a":222940,"t":"Dewberry utility relocation design (Res. 21-157)","payee":"Dewberry Engineers, Inc.","u":"https://pcbfl.gov/home/showpublisheddocument/18097/637574690484470000","vid":"dewberry","s":"2021-05-13"},{"d":"2023","k":"award","a":47250,"t":"Appraisals of seven right-of-way parcels (Res. 23-145)","payee":"Chandler and Associates","u":"https://news.yahoo.com/panama-city-beach-city-council-090510078.html","news":true,"s":"2023-07-01"},{"d":"2024-09-30","k":"spent","a":2943496,"t":"Spent to date, against a total project cost of $60,333,496","u":"https://www.pcbfl.gov/home/showpublisheddocument/27668/638887882812000000","estimate":60333496,"s":"2024-09-30"}],"flags":[{"r":"mixed","sev":"warn","note":"CRA money is listed alongside state and federal grants, so the CRA share is smaller than the totals shown."}],"gaps":[],"total":{"a":60333496,"t":"current total project cost","open":true},"sev":"warn","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2020-05-14","last":"2024-09-30","money":60333496,"vendor":null},{"id":"pcb-fbr-seg43","n":"Front Beach Road Segment 4.3 (Hutchison Blvd to Richard Jackson Blvd)","gk":"pcb","g":"Panama City Beach","agency":"Panama City Beach CRA (Front Beach Road CRA)","where":"Front Beach Rd, Hutchison Blvd to Richard Jackson Blvd","what":"Design and right-of-way; construction bids expected late FY2027.","funding":"CRA with state and federal grants","status":"design","src":"reviewed","ev":[{"d":"2021-07","k":"award","a":1608711.02,"t":"Volkert design task order (Res. 21-187), ranked first ahead of Mott MacDonald and Kimley-Horn","payee":"Volkert, Inc.","u":"https://pcbfl.gov/home/showpublisheddocument/18302/637617846736370000","vid":"volkert","s":"2021-07-15"},{"d":"2023","k":"award","a":246180,"t":"Design and bidding services (Res. 23-146)","payee":"McKim & Creed","u":"https://news.yahoo.com/panama-city-beach-city-council-090510078.html","news":true,"s":"2023-07-01"},{"d":"2024-09-30","k":"spent","a":1741811,"t":"Spent to date, against a total project cost of $64,569,811","u":"https://www.pcbfl.gov/home/showpublisheddocument/27668/638887882812000000","estimate":64569811,"s":"2024-09-30"},{"d":"FY2027","k":"milestone","t":"Construction bids expected (late FY2027)","u":"https://www.pcbfl.gov/home/showpublisheddocument/27668/638887882812000000","s":"2027-09-30"}],"flags":[{"r":"mixed","sev":"warn","note":"CRA money is listed alongside state and federal grants, so the CRA share is smaller than the totals shown."}],"gaps":[],"total":{"a":64569811,"t":"current total project cost","open":true},"sev":"warn","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2021-07-15","last":"2027-09-30","money":64569811,"vendor":null},{"id":"pcb-south-thomas","n":"South Thomas Drive and Front Beach Road Segment 1","gk":"pcb","g":"Panama City Beach","agency":"Panama City Beach CRA (Front Beach Road CRA)","where":"South Thomas Dr and the east end of Front Beach Rd","what":"Reconstruction of the east end of the corridor.","funding":"CRA tax increment and bonds","status":"closed","src":"reviewed","ev":[{"d":"2009-09","k":"award","a":11313787,"t":"Construction contract; 15 change orders totaling $197,835 had been added when the city presented it (contractor not named in the source)","u":"https://pcbfl.gov/home/showpublisheddocument/262/635288586904330000","s":"2009-09-15"},{"d":"2011-11","k":"milestone","t":"Construction period ends (Sep 2009 to Nov 2011)","u":"https://pcbfl.gov/home/showpublisheddocument/262/635288586904330000","s":"2011-11-15"},{"d":"2013","k":"complete","a":15363787,"t":"Completed. Total project cost in the Capital Improvements Schedule","u":"https://www.pcbfl.gov/home/showpublisheddocument/27668/638887882812000000","s":"2013-07-01"},{"d":"2025","k":"payment","a":1442752.96,"t":"Streetlights on Segment 1 and South Thomas Dr replaced with a state CDBG grant (not CRA money)","u":"https://www.pcbfl.gov/Archive.aspx?ADID=184","side":true,"s":"2025-07-01"}],"flags":[{"r":"payee","sev":"warn","note":"The $11.3 million construction contractor is not named in the city's presentation."}],"gaps":[{"q":"The construction contract, contractor name and full change-order list for the South Thomas Drive / Front Beach Road Segment 1 reconstruction (2009-2013)","gk":"pcb"}],"base":{"a":11313787,"t":"construction contract"},"total":{"a":15363787,"t":"total project cost"},"sev":"warn","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2009-09-15","last":"2025-07-01","money":15363787,"vendor":null},{"id":"pcb-alf-coleman","n":"Alf Coleman Road Phase I","gk":"pcb","g":"Panama City Beach","agency":"Panama City Beach (managed by the CRA)","where":"Alf Coleman Rd, PCB Parkway to Hutchison Blvd","what":"Road reconstruction.","funding":"Grants (FDEM HMGP, FDOT LAP); the city did not expect to use CRA money","status":"construction","src":"reviewed","ev":[{"d":"2021-03-25","k":"award","a":198354.82,"t":"Inspection (CEI) for sidewalk, lighting and resurfacing (Res. 21-120), not to exceed","payee":"Atkins North America, Inc.","u":"https://pcbfl.gov/home/showpublisheddocument/17736/637517765381570000","side":true,"s":"2021-03-25"},{"d":"2023-04-13","k":"award","a":5307600.65,"t":"Construction contract awarded (Res. 23-156); CWR had bid about $6.7 million","payee":"Gulf Coast Utility Contractors, LLC","u":"https://pcbfl.gov/home/showpublisheddocument/24401/638472373123930000","vid":"gcuc","s":"2023-04-13"},{"d":"2024-09-30","k":"spent","a":5020072,"t":"Spent to date, against a total project cost of $6,277,759 in the Capital Improvements Schedule","u":"https://pcbfl.gov/home/showpublisheddocument/24401/638472373123930000","estimate":6277759,"s":"2024-09-30"}],"flags":[{"r":"mixed","sev":"warn","note":"Reported as grant-funded; the total project cost may include design and inspection as well as construction."}],"gaps":[],"base":{"a":5307600.65,"t":"construction contract at award"},"total":{"a":6277759,"t":"current total project cost","open":true},"sev":"warn","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2021-03-25","last":"2024-09-30","money":6277759,"vendor":null},{"id":"pc-millville-park","n":"Millville Waterfront Park (Watson Bayou)","gk":"pc","g":"Panama City","agency":"Panama City CRA, Millville district","where":"Watson Bayou waterfront, Millville","what":"4.2-acre park site bought in 2008; Phase II adds a playground, amphitheater, trees and restrooms.","funding":"CRA tax increment (land repaid through rent to the City)","status":"construction","src":"reviewed","ev":[{"d":"2008-09","k":"payment","a":2500000,"approx":true,"t":"City buys the park site for about $2.5 million with a bank loan and leases it to the CRA, which repays it through rent","payee":"City of Panama City","u":"https://www.panamacity.gov/DocumentCenter/View/7666","side":true,"s":"2008-09-15"},{"d":"FY2022","k":"milestone","t":"Final loan payment on the land","u":"https://www.panamacity.gov/DocumentCenter/View/7666","s":"2022-09-30"},{"d":"FY2024","k":"budget","a":1500000,"t":"Phase II budgeted from the FY2024-FY2026 Millville district budgets","u":"https://panamacity.gov/785/Current-Projects","s":"2023-10-01"},{"d":"2024-05-28","k":"award","t":"Phase II bid awarded to Inland Construction & Engineering (amount not in our records)","payee":"Inland Construction & Engineering","u":"https://panamacity.gov/785/Current-Projects","vid":"inland","s":"2024-05-28"}],"flags":[{"r":"budget","sev":"warn","note":"The $1.5 million is a three-year budget, not confirmed spending, and the bid amount isn't stated."}],"gaps":[{"q":"The Millville Waterfront Park Phase II construction contract with Inland Construction & Engineering (bid awarded May 28, 2024): contract amount, change orders and payments to date","gk":"pc"}],"sev":"warn","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2008-09-15","last":"2024-05-28","money":1500000,"vendor":null},{"id":"pc-bayview-boardwalk","n":"Bayview Boardwalk (St. Andrews)","gk":"pc","g":"Panama City","agency":"Panama City CRA, St. Andrews district","where":"Bayview Ave boardwalk, St. Andrews","what":"Boardwalk rebuild; a $2.4 million project with a Rebuild Florida grant paying half.","funding":"CRA share plus a Rebuild Florida Hometown Revitalization grant","status":"budgeted","src":"reviewed","ev":[{"d":"FY2014","k":"payment","a":68000,"t":"Earlier boardwalk improvement and signage","u":"https://panamacity.gov/DocumentCenter/View/1206/FY2014-Annual-Report-PDF","side":true,"s":"2014-09-30"},{"d":"FY2024","k":"budget","a":1200000,"t":"Current Projects page: CRA share $1.2 million of a $2.4 million project, FY2024-FY2026","u":"https://panamacity.gov/785/Current-Projects","s":"2023-10-01"},{"d":"FY2025","k":"budget","a":800000,"t":"FY2025-26 work plan shows $800,000 continuing","u":"https://panamacity.gov/785/Current-Projects","s":"2024-10-01"},{"d":"2025","k":"budget","a":300000,"t":"2025 news coverage of FY2026 proposals shows $300,000","news":true,"u":"https://panamacity.gov/785/Current-Projects","via":true,"s":"2025-07-01"}],"flags":[{"r":"conflict","sev":"warn","note":"Three figures for the CRA's share in three documents: $1.2 million, $800,000 and $300,000. They may be different slices of the same commitment; the city's breakdown would settle it."},{"r":"payee","sev":"warn","note":"No contractor named yet."}],"gaps":[{"q":"The Bayview Boardwalk (St. Andrews) project budget by fiscal year and funding source (CRA share and Rebuild Florida grant), the construction contract and payments to date","gk":"pc"}],"sev":"warn","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2014-09-30","last":"2025-07-01","money":1200000,"vendor":null},{"id":"pc-breezeway","n":"Harrison Avenue breezeway (447 Harrison Ave)","gk":"pc","g":"Panama City","agency":"Panama City CRA, Downtown district","where":"400 block of Harrison Ave","what":"A walk-through between Harrison Ave and the parking behind it, on land the City got in a swap.","funding":"CRA tax increment","status":"phase-done","src":"reviewed","ev":[{"d":"before 2023","s":"2022-12-31","k":"milestone","t":"City swaps a Mulberry St parcel (appraised $534,000) for 447 Harrison Ave (appraised $500,000); the company pays the City the $34,000 difference","payee":"Beach Drive PC Holdings LLC","u":"https://news.yahoo.com/city-approves-land-swap-harrison-110017462.html?fr=sycsrp_catchall","news":true},{"d":"FY2024","k":"spent","a":81000,"t":"2024 annual report lists an $81,000 renovation","u":"https://panamacity.gov/813/Completed-Projects","via":true,"s":"2024-09-30"},{"d":"FY2025","k":"budget","a":700000,"t":"FY2025 work plan budgets $700,000","u":"https://panamacity.gov/813/Completed-Projects","s":"2024-10-01"},{"d":"FY2025","k":"complete","a":100000,"t":"Phase 1 complete: CRA share $100,000 of $500,000","u":"https://panamacity.gov/813/Completed-Projects","s":"2025-09-30"},{"d":"FY2026","k":"budget","a":220000,"t":"FY2026 work plan budgets $220,000; FY2026 proposals show $500,000 over three years","u":"https://panamacity.gov/813/Completed-Projects","via":true,"s":"2025-10-01"}],"flags":[{"r":"conflict","sev":"warn","note":"Figures of $81,000, $100,000, $220,000, $500,000 and $700,000 across five documents, with no single breakdown of what has been spent and what is planned."}],"gaps":[{"q":"All spending to date on the Harrison Avenue walk-through (breezeway) at 447 Harrison Ave, by phase and funding source, and the planned budget for later phases","gk":"pc"}],"sev":"warn","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2022-12-31","last":"2025-10-01","money":700000,"vendor":null},{"id":"pc-mckenzie-restrooms","n":"McKenzie Park public restrooms","gk":"pc","g":"Panama City","agency":"Panama City CRA, Downtown district","where":"McKenzie Park, downtown","what":"New public restrooms.","funding":"CRA and the Downtown Improvement Board ($100,000)","status":"complete","src":"reviewed","ev":[{"d":"FY2024","k":"budget","a":265000,"t":"Project total $265,000: CRA $165,000, Downtown Improvement Board $100,000","u":"https://panamacity.gov/813/Completed-Projects","s":"2023-10-01"},{"d":"2025-01","k":"complete","a":229000,"t":"WMBB reports $229,000 at completion","u":"https://digital-release.mypanhandle.com/news/local-news/bay-county/panama-city/panama-city-cra-board-provides-progress-updates-on-various-projects/amp/","news":true,"s":"2025-01-15"}],"flags":[{"r":"conflict","sev":"warn","note":"The city's page shows $265,000 ($165,000 CRA); news coverage at completion reported $229,000. The final cost and contractor would settle it."},{"r":"payee","sev":"warn","note":"Contractor not named."}],"gaps":[{"q":"The final cost, contractor and payments for the McKenzie Park public restrooms (completed January 2025), and the CRA and Downtown Improvement Board shares","gk":"pc"}],"sev":"warn","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2023-10-01","last":"2025-01-15","money":265000,"vendor":null},{"id":"pc-glenwood-land","n":"Glenwood land: 2017 purchase to Glenwood Town Center sale","gk":"pc","g":"Panama City","agency":"Panama City CRA, Downtown North district","where":"Downtown North (Glenwood), MLK Blvd and E 15th St","what":"Land the City and CRA bought, then offered to a developer for a roughly $30 million town center.","funding":"CRA tax increment","status":"sale","src":"reviewed","ev":[{"d":"2017-04","k":"payment","t":"City/CRA closes on 37 lots with 35 homes on 6.5 acres. Price not in the annual report","u":"https://panamacity.gov/DocumentCenter/View/3827/FY2017-Annual-Report-PDF","s":"2017-04-15"},{"d":"FY2018","k":"milestone","t":"Downtown North operating expenses jump to $1.7 million, which may be related","u":"https://panamacity.gov/DocumentCenter/View/3827/FY2017-Annual-Report-PDF","via":true,"s":"2018-09-30"},{"d":"FY2024","k":"budget","a":460000,"t":"Glenwood Entrance Redevelopment, including land at 15th St & MLK Blvd, budgeted FY2024-FY2026","u":"https://panamacity.gov/785/Current-Projects","s":"2023-10-01"},{"d":"2025-02-27","k":"sale","a":667099.62,"t":"Sankofa Group, LLC offers to buy 15 CRA parcels for the Glenwood Town Center (money to the CRA)","payee":"Sankofa Group, LLC","u":"https://panamacity.gov/DocumentCenter/View/10082","s":"2025-02-27"},{"d":"2025-07","k":"approval","t":"Agreement approved; the CRA can buy the land back if deadlines are missed. Final sale price not confirmed","u":"https://panamacity.gov/DocumentCenter/View/10082","s":"2025-07-15"}],"flags":[{"r":"payee","sev":"warn","note":"What the City and CRA paid for the land in 2017, and to whom, is not in any record we have, so the public's cost can't be compared with the sale price."}],"gaps":[{"q":"The deed(s) and closing statement for the City/CRA purchase of 37 lots with 35 homes on 6.5 acres in Downtown North (closed April 2017), including the price and seller","gk":"pc"},{"q":"The final purchase and development agreement with Sankofa Group, LLC for the Glenwood Town Center (approved July 2025), including the sale price, deadlines and buy-back terms","gk":"pc"}],"sev":"warn","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2017-04-15","last":"2025-07-15","money":460000,"vendor":null},{"id":"pc-road-resurfacing","n":"CRA road resurfacing program (FY2027 onward)","gk":"pc","g":"Panama City","agency":"Panama City CRA (Millville, Downtown North, St. Andrews)","where":"Streets in Millville, Downtown North and St. Andrews","what":"Millville $450,000 a year for 5 years, Downtown North $250,000 a year for 5 years, St. Andrews $250,000 a year for 4 years.","funding":"CRA tax increment","status":"committed","src":"reviewed","ev":[{"d":"2026-03","k":"approval","a":4500000,"t":"CRA board approves the multi-year commitment, 3-2","u":"https://www.yahoo.com/news/articles/panama-city-cra-board-finalizes-040831032.html","news":true,"s":"2026-03-15"},{"d":"FY2027","k":"milestone","t":"First year of spending (starts Oct 1, 2026)","u":"https://www.yahoo.com/news/articles/panama-city-cra-board-finalizes-040831032.html","s":"2027-09-30"}],"flags":[{"r":"payee","sev":"warn","note":"Paid through the City; the outside contractors doing the work aren't named yet. Worth tracking street by street as it's spent."}],"gaps":[{"q":"The list of streets to be resurfaced with CRA money starting FY2027 in Millville, Downtown North and St. Andrews, with the estimated cost of each and the contract(s) used","gk":"pc"}],"sev":"warn","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2026-03-15","last":"2027-09-30","money":4500000,"vendor":null},{"id":"pc-401-e-6th","n":"401 E 6th St (Acorns to Oaks Academy site): two incentives","gk":"pc","g":"Panama City","agency":"Panama City CRA, Downtown district","where":"401 E 6th St","what":"A commercial improvement grant and a multi-year tax increment rebate for the same address.","funding":"CRA tax increment","status":"committed","src":"reviewed","ev":[{"d":"FY2024","k":"payment","a":50000,"t":"Commercial improvement grant: paint, mural, parking, playground, turf ($103,242 project)","payee":"Acorns to Oaks Academy","u":"https://www.panamacity.gov/DocumentCenter/View/9865","s":"2024-09-30"},{"d":"2024-12","k":"approval","a":107798.34,"t":"Tax increment rebate award, paid yearly over up to 15 years once the tax bill is paid (owner not named)","u":"https://www.panamacity.gov/DocumentCenter/View/10977","s":"2024-12-15"}],"flags":[{"r":"stack","sev":"warn","note":"Two CRA incentives for one address. Both programs may allow this; the point is that the total public support ($157,798 at most) is easy to miss when each is reported on its own."}],"gaps":[{"q":"The TIF rebate agreement for 401 E 6th St (approved December 2024), including the property owner, the yearly cap, the term and any payments made","gk":"pc"}],"sev":"warn","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2024-09-30","last":"2024-12-15","money":107798.34,"vendor":null},{"id":"lh-tennessee-sidewalk","n":"Tennessee Avenue sidewalk (W 5th St to W 14th St)","gk":"lh","g":"Lynn Haven","agency":"Lynn Haven CRA (run by the CRA Director)","where":"East side of Tennessee Ave, W 5th St to W 14th St","what":"A 5-foot ADA sidewalk (IFB 25.26-02).","funding":"Mostly an FDOT Transportation Alternatives grant; CRA share not stated","status":"contract","src":"reviewed","ev":[{"d":"FY2024","k":"estimate","a":1200000,"approx":true,"t":"FY2024 annual report puts the project at about $1.2 million, FDOT-funded","u":"https://www.cityoflynnhaven.com/DocumentCenter/View/4018","s":"2024-09-30"},{"d":"FY2026","k":"budget","a":90304,"t":"CRA fund (Fund 701) budgets a $90,304 FDOT grant for the project","u":"https://www.cityoflynnhaven.com/AgendaCenter/ViewFile/Agenda/_01132026-1110","s":"2025-10-01"},{"d":"2026-01-13","k":"award","a":623137.69,"t":"Construction contract awarded","payee":"BCL Civil Contractors","u":"https://www.cityoflynnhaven.com/AgendaCenter/ViewFile/Agenda/_01132026-1110","vid":"bcl","s":"2026-01-13"}],"flags":[{"r":"mixed","sev":"warn","note":"The resolution doesn't say how much of the $623,138 comes from CRA tax increment and how much from the FDOT grant."}],"gaps":[{"q":"The funding split for the Tennessee Avenue sidewalk contract with BCL Civil Contractors (awarded January 13, 2026): FDOT grant amount, CRA tax increment amount, and payments to date","gk":"lh"}],"sev":"warn","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2024-09-30","last":"2026-01-13","money":623137.69,"vendor":null},{"id":"lh-sharon-sheffield","n":"Sharon Sheffield Park, Master Plan Phase II","gk":"lh","g":"Lynn Haven","agency":"Lynn Haven CRA","where":"Sharon Sheffield Park","what":"Courtyard and stage; the amphitheater named for former Commissioner Roger Schad opened in spring 2018.","funding":"CRA, with a $100,000 state FRDAP grant","status":"unknown","src":"reviewed","ev":[{"d":"2016","k":"estimate","a":1000000,"approx":true,"t":"WJHG: the CRA planned to fund the roughly $1 million renovation, with a $100,000 FRDAP grant saving it that amount","news":true,"u":"https://www.cityoflynnhaven.com/Archive.aspx?ADID=123","via":true,"s":"2016-07-01"},{"d":"2017","k":"milestone","t":"WJHG: work waiting on a state grant","news":true,"u":"https://www.cityoflynnhaven.com/Archive.aspx?ADID=123","via":true,"s":"2017-07-01"},{"d":"FY2018","k":"budget","a":380000,"t":"Phase II budgeted as CRA capital outlay (carry-over)","u":"https://www.cityoflynnhaven.com/Archive.aspx?ADID=123","s":"2017-10-01"},{"d":"2018","k":"milestone","t":"Amphitheater opens (spring 2018)","u":"https://www.cityoflynnhaven.com/Archive.aspx?ADID=123","via":true,"s":"2018-07-01"}],"flags":[{"r":"budget","sev":"warn","note":"Budgeted $380,000 in FY2018; we found no record of what was actually spent."}],"gaps":[{"q":"Actual spending on Sharon Sheffield Park Master Plan Phase I and Phase II (2016-2019), by contractor and funding source (CRA and FRDAP grant)","gk":"lh"}],"sev":"warn","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2016-07-01","last":"2018-07-01","money":380000,"vendor":null},{"id":"cw-capital-fy2025","n":"Callaway CRA capital projects, FY2025 (Berthe and Rogers Pond spillways)","gk":"cw","g":"Callaway","agency":"Callaway CRA","where":"Berthe Avenue spillway and Rogers Pond spillway","what":"Stormwater spillway replacements.","funding":"CRA tax increment; a stormwater grant was pending","status":"delayed","src":"reviewed","ev":[{"d":"FY2024","k":"spent","a":221428,"t":"FY2024 capital spending $221,428 against an $889,406 budget","u":"https://flauditor.gov/pages/specialdistricts_efile%20rpts/2024%20callaway%20community%20redevelopment%20agency.pdf","budget":889406,"s":"2024-09-30"},{"d":"FY2025","k":"budget","a":3144257,"t":"FY2025 capital outlay budget","u":"https://flauditor.gov/pages/specialdistricts_efile%20rpts/2025%20callaway%20community%20redevelopment%20agency.pdf","s":"2024-10-01"},{"d":"FY2025","k":"spent","a":315715,"t":"FY2025 actual capital spending: $315,715, about $2.86 million under budget, mainly because the Berthe spillway was delayed","u":"https://flauditor.gov/pages/specialdistricts_efile%20rpts/2025%20callaway%20community%20redevelopment%20agency.pdf","budget":3144257,"s":"2025-09-30"},{"d":"FY2025","k":"payment","a":129010,"t":"Rogers Pond spillway: $129,010 spent so far","u":"https://flauditor.gov/pages/specialdistricts_efile%20rpts/2025%20callaway%20community%20redevelopment%20agency.pdf","s":"2025-09-30"},{"d":"2025-10-01","k":"milestone","t":"Rogers Pond construction set to begin on or after this date","u":"https://flauditor.gov/pages/specialdistricts_efile%20rpts/2025%20callaway%20community%20redevelopment%20agency.pdf","s":"2025-10-01"}],"flags":[{"r":"payee","sev":"warn","note":"No contractor named for either spillway."},{"r":"budget","sev":"warn","note":"FY2024: spent $221K of a $889K budget (25%)."},{"r":"budget","sev":"warn","note":"FY2025: spent $316K of a $3.1M budget (10%)."}],"gaps":[{"q":"The contracts, contractors and current schedule for the Berthe Avenue and Rogers Pond spillway projects funded by the Callaway CRA, and the status of the pending stormwater grant","gk":"cw"}],"sev":"warn","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2024-09-30","last":"2025-10-01","money":3144257,"vendor":null},{"id":"sp-capital-fy2025","n":"Springfield CRA capital budget, FY2025-FY2027 (parks and sidewalks)","gk":"sp","g":"Springfield","agency":"Springfield CRA","where":"Springfield Gardens Walking Park, Nature Park, Carrie Bell Shaw Park, Buddy McLemore Park, 2nd St","what":"Park improvements, playgrounds, restrooms and sidewalks.","funding":"CRA tax increment","status":"budgeted","src":"reviewed","ev":[{"d":"FY2025","k":"spent","a":0,"t":"FY2025 capital outlay: $0 spent against a $1,130,434 final budget. Total CRA spending that year was $60,017, the first on record after none in FY2023-2024","u":"https://www.springfieldfl.net/media/10746","budget":1130434,"s":"2025-09-30"},{"d":"FY2026","k":"budget","a":921693.83,"t":"FY2026 amended budget, five park and sidewalk lines added together: Nature Park, Carrie Bell Shaw Park, Springfield Gardens Walking Park (improvements and playground) and the 2nd St sidewalk","u":"https://www.springfieldfl.net/media/10801","s":"2025-10-01"},{"d":"FY2027","k":"budget","a":786347.55,"t":"FY2027 budget, two lines added together: $606,348 for Springfield Gardens Walking Park and $180,000 for Buddy McLemore Park playground equipment (other FY2027 lines, such as $235,000 for Nature Park, not included)","u":"https://www.springfieldfl.net/media/10806","s":"2026-10-01"}],"flags":[{"r":"payee","sev":"warn","note":"No contractors named for any of the budgeted park projects."},{"r":"budget","sev":"warn","note":"FY2025: spent $0 of a $1.1M budget (0%)."}],"gaps":[{"q":"Actual Springfield CRA capital spending in FY2026 by project (Nature Park, Carrie Bell Shaw Park, Springfield Gardens Walking Park, 2nd Street sidewalk), with contractors and contracts","gk":"sp"}],"sev":"warn","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2025-09-30","last":"2026-10-01","money":921693.83,"vendor":null},{"id":"co-pc-hagerty-consulting-hurricane-michael-recovery-consulting-contract","n":"Hurricane Michael recovery consulting, contract","gk":"pc","g":"Panama City","agency":"Panama City","what":"Contract with Hagerty Consulting.","status":"contract","src":"contracts","ev":[{"d":"2022-10-11","k":"change","a":1137425.0,"t":"Hurricane Michael recovery consulting, contract amendment 15 \u00b7 Continue Hurricane Michael recovery and extend to FMA, BRIC, Hurricane Sally CDBG-DR and Resilient grants","payee":"Hagerty Consulting","vid":"hagerty-consulting","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_10112022-581?html=true","s":"2022-10-11"},{"d":"2022-11-29","k":"change","a":1020500.0,"t":"Hurricane Michael recovery consulting, contract amendment 16 \u00b7 Extend contract for CDBG-DR","payee":"Hagerty Consulting","vid":"hagerty-consulting","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_11292022-589?html=true","s":"2022-11-29"}],"flags":[],"gaps":[{"q":"The original contract amount and every change order (with amounts and reasons) for the Panama City contract with Hagerty Consulting: Hurricane Michael recovery consulting, contract","gk":"pc"}],"vendor":"hagerty-consulting","vn":"Hagerty Consulting","sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2022-10-11","last":"2022-11-29","money":0},{"id":"co-county-behar-peteranecz-youngstown-fountain-community-center-design","n":"Youngstown-Fountain Community Center design","gk":"county","g":"Bay County","agency":"Bay County","what":"Contract with Behar Peteranecz.","status":"contract","src":"contracts","ev":[{"d":"2022-11-15","k":"change","a":98460.0,"t":"Youngstown-Fountain Community Center design, change order 1 \u00b7 Additional scope of work","payee":"Behar Peteranecz","vid":"behar-peteranecz","u":"https://baycountyfl.primegov.com/Public/CompiledDocument/1209","s":"2022-11-15"}],"flags":[],"gaps":[{"q":"The original contract amount and every change order (with amounts and reasons) for the Bay County contract with Behar Peteranecz: Youngstown-Fountain Community Center design","gk":"county"}],"vendor":"behar-peteranecz","vn":"Behar Peteranecz","sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2022-11-15","last":"2022-11-15","money":0},{"id":"co-lh-bgn-sports-complex-rebuild-pickleball-courts","n":"Sports Complex rebuild, pickleball courts","gk":"lh","g":"Lynn Haven","agency":"Lynn Haven","what":"Contract with BGN Contractors (Gage Golden Construction).","status":"contract","src":"contracts","ev":[{"d":"2022-12-09","k":"change","a":331831.89,"t":"Sports Complex rebuild, pickleball courts \u00b7 Change order to construct pickleball courts (plus $76,198 city-constructed portion)","payee":"BGN Contractors (Gage Golden Construction)","vid":"bgn","u":"https://www.cityoflynnhaven.com/AgendaCenter/ViewFile/Agenda/_12092022-434","s":"2022-12-09"}],"flags":[],"gaps":[{"q":"The original contract amount and every change order (with amounts and reasons) for the Lynn Haven contract with BGN Contractors (Gage Golden Construction): Sports Complex rebuild, pickleball courts","gk":"lh"}],"vendor":"bgn","vn":"BGN Contractors (Gage Golden Construction)","sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2022-12-09","last":"2022-12-09","money":0},{"id":"co-lh-tetra-tech-hurricane-michael-fema-public-assistance-consulting-task","n":"Hurricane Michael FEMA public assistance consulting (Task Order 1-2018-FRS)","gk":"lh","g":"Lynn Haven","agency":"Lynn Haven","what":"Contract with Tetra Tech, Inc..","status":"contract","src":"contracts","ev":[{"d":"2022-12-13","k":"change","a":199913.45,"t":"Hurricane Michael FEMA public assistance consulting (Task Order 1-2018-FRS), change order 10 \u00b7 Increase not-to-exceed amount and extend performance through June 30, 2023","payee":"Tetra Tech, Inc.","vid":"tetra-tech","u":"https://www.cityoflynnhaven.com/AgendaCenter/ViewFile/Agenda/_12132022-435","s":"2022-12-13"},{"d":"2025-01-24","k":"change","a":74047.05,"t":"Hurricane Michael FEMA public assistance consulting, change order \u00b7 Increase not-to-exceed amount","payee":"Tetra Tech, Inc.","vid":"tetra-tech","u":"https://www.cityoflynnhaven.com/AgendaCenter/ViewFile/Agenda/_01242025-845","s":"2025-01-24"}],"flags":[],"gaps":[{"q":"The original contract amount and every change order (with amounts and reasons) for the Lynn Haven contract with Tetra Tech, Inc.: Hurricane Michael FEMA public assistance consulting (Task Order 1-2018-FRS)","gk":"lh"}],"vendor":"tetra-tech","vn":"Tetra Tech, Inc.","sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2022-12-13","last":"2025-01-24","money":0},{"id":"co-county-bcl-cr30-front-beach-road-sidewalk-phases-1-and-2","n":"CR30 Front Beach Road sidewalk Phases 1 and 2","gk":"county","g":"Bay County","agency":"Bay County","what":"Contract with BCL Civil Contractors.","status":"contract","src":"contracts","ev":[{"d":"2023-02-07","k":"change","a":174629.79,"t":"CR30 Front Beach Road sidewalk Phases 1 and 2, change orders 3 and 4 \u00b7 Minor scope modifications (CO3 Phase 1 $97,228.49; CO4 Phase 2 $77,401.30)","payee":"BCL Civil Contractors","vid":"bcl","u":"https://baycountyfl.primegov.com/Public/CompiledDocument/1389","s":"2023-02-07"}],"flags":[],"gaps":[{"q":"The original contract amount and every change order (with amounts and reasons) for the Bay County contract with BCL Civil Contractors: CR30 Front Beach Road sidewalk Phases 1 and 2","gk":"county"}],"vendor":"bcl","vn":"BCL Civil Contractors","sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2023-02-07","last":"2023-02-07","money":0},{"id":"co-county-culpepper-new-juvenile-justice-courthouse-addition","n":"New Juvenile Justice Courthouse Addition","gk":"county","g":"Bay County","agency":"Bay County","what":"Contract with Culpepper Construction.","status":"contract","src":"contracts","ev":[{"d":"2024-03-05","k":"change","a":903958.0,"t":"New Juvenile Justice Courthouse Addition \u00b7 Unforeseen structural conditions at the front lobby entrance","payee":"Culpepper Construction","vid":"culpepper","u":"https://baycountyfl.primegov.com/Portal/Meeting?compiledMeetingDocumentFileId=2139","s":"2024-03-05"}],"flags":[],"gaps":[{"q":"The original contract amount and every change order (with amounts and reasons) for the Bay County contract with Culpepper Construction: New Juvenile Justice Courthouse Addition","gk":"county"}],"vendor":"culpepper","vn":"Culpepper Construction","sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2024-03-05","last":"2024-03-05","money":0},{"id":"co-county-bgn-courthouse-1st-2nd-floor-renovation-itb-23-25","n":"Courthouse 1st & 2nd floor renovation (ITB 23-25)","gk":"county","g":"Bay County","agency":"Bay County","what":"Contract with BGN Contractors (Gage Golden Construction).","status":"contract","src":"contracts","ev":[{"d":"2023-06-06","k":"award","a":1974237.46,"t":"Contract awarded (Competitive sealed bid (invitation to bid) (later items refer to it as ITB 23-25))","payee":"BGN Contractors (Gage Golden Construction)","vid":"bgn","u":"https://baycountyfl.primegov.com/Public/CompiledDocument/1397","s":"2023-06-06"},{"d":"2024-10-15","k":"change","a":277732.48,"t":"Courthouse 1st & 2nd floor renovation (ITB 23-25) \u00b7 Unforeseen additional work and additional general conditions","payee":"BGN Contractors (Gage Golden Construction)","vid":"bgn","u":"https://baycountyfl.primegov.com/Portal/Meeting?compiledMeetingDocumentFileId=3679","s":"2024-10-15"},{"d":"2025-02-04","k":"change","a":46343.18,"t":"Courthouse 1st & 2nd floor renovation (ITB 23-25) \u00b7 Unforeseen additional work","payee":"BGN Contractors (Gage Golden Construction)","vid":"bgn","u":"https://baycountyfl.primegov.com/Portal/Meeting?compiledMeetingDocumentFileId=3925","s":"2025-02-04"}],"flags":[{"r":"growth","sev":"warn","note":"Change orders add 16% ($324K) to the $2.0M original."}],"gaps":[],"base":{"a":1974237.46,"t":"original contract"},"now":{"a":2298313.12,"t":"contract with change orders so far","open":true},"vendor":"bgn","vn":"BGN Contractors (Gage Golden Construction)","growth":16.4,"sev":"warn","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2023-06-06","last":"2025-02-04","money":2298313.12},{"id":"co-pcb-fdot-joint-participation-agreement-pcb-parkway-widening-utilities","n":"Joint participation agreement, PCB Parkway widening utilities relocation (Mandy Ln to Nautilus St)","gk":"pcb","g":"Panama City Beach","agency":"Panama City Beach","what":"Contract with Florida Department of Transportation.","status":"contract","src":"contracts","ev":[{"d":"2024-11-14","k":"change","a":346980.59,"t":"Joint participation agreement, PCB Parkway widening utilities relocation (Mandy Ln to Nautilus St) \u00b7 Utilities relocation cost above the original estimate","payee":"Florida Department of Transportation","u":"https://pcbgov.granicus.com/AgendaViewer.php?view_id=1&clip_id=334","s":"2024-11-14"},{"d":"2024-11-14","k":"vote","t":"Change-order vote: passed 5-0","u":"https://d3n9y02raazwpg.cloudfront.net/pcbgov/c2af2a66-9914-11ee-a93d-0050569183fa-b95fcb69-f19b-4652-8495-9f0a506dc971-1733350123.pdf","tally":"5-0","members":{"Stuart Tettemer":"yes","Michael Jarman":"yes","Ethan Register":"yes","Paul Casto":"yes","Mary Coburn":"yes"},"s":"2024-11-14"},{"d":null,"k":"award","a":99350.0,"t":"Original contract amount, as stated on the change-order agenda item","payee":"Florida Department of Transportation","u":"https://pcbgov.granicus.com/AgendaViewer.php?view_id=1&clip_id=334","s":"9999"}],"flags":[{"r":"growth","sev":"high","note":"Change orders add 349% ($347K) to the $99K original."}],"gaps":[],"base":{"a":99350.0,"t":"original contract"},"now":{"a":446330.59,"t":"contract with change orders so far","open":true},"vendor":null,"vn":"Florida Department of Transportation","growth":349.3,"sev":"high","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2024-11-14","last":"2024-11-14","money":446330.59},{"id":"co-county-cdr-maguire-task-order-32-agreement-19-04-mexico-beach-renouris","n":"Task Order 32 (Agreement 19-04), Mexico Beach renourishment consulting","gk":"county","g":"Bay County","agency":"Bay County","what":"Contract with CDR Maguire.","status":"contract","src":"contracts","ev":[{"d":"2024-09-17","k":"award","a":306251.0,"t":"Contract awarded (Task order / work authorization under existing continuing-services contract)","payee":"CDR Maguire","vid":"cdr-maguire","u":"https://baycountyfl.primegov.com/Portal/Meeting?compiledMeetingDocumentFileId=3581","s":"2024-09-17"},{"d":"2025-03-04","k":"change","a":281208.0,"t":"Task Order 32 (Agreement 19-04), Mexico Beach renourishment consulting \u00b7 Amend task order to not exceed $587,459 (TDC recommendation)","payee":"CDR Maguire","vid":"cdr-maguire","u":"https://baycountyfl.primegov.com/Portal/Meeting?compiledMeetingDocumentFileId=3985","s":"2025-03-04"}],"flags":[{"r":"growth","sev":"high","note":"Change orders add 92% ($281K) to the $306K original."}],"gaps":[],"base":{"a":306251.0,"t":"original contract"},"now":{"a":587459.0,"t":"contract with change orders so far","open":true},"vendor":"cdr-maguire","vn":"CDR Maguire","growth":91.8,"sev":"high","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2024-09-17","last":"2025-03-04","money":587459.0},{"id":"co-pc-cbc-harrison-avenue-streetscapes-phase-ii-pc24-022","n":"Harrison Avenue streetscapes Phase II (PC24-022)","gk":"pc","g":"Panama City","agency":"Panama City","what":"Contract with CBC Construction.","status":"contract","src":"contracts","ev":[{"d":"2024-06-18","k":"award","a":6964150.0,"t":"Contract awarded (Competitive sealed bid (invitation to bid))","payee":"CBC Construction","vid":"cbc","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_06182024-697?html=true","s":"2024-06-18"},{"d":"2024-06-18","k":"vote","t":"Award vote: passed 4-1","u":"https://www.panamacity.gov/AgendaCenter/ViewFile/Minutes/_06182024-697","tally":"4-1","members":{"Michael Rohan":"no","Josh Street":"yes","Jenna Haligas":"yes","Janice Lucas":"yes","Brian Grainger":"yes"},"s":"2024-06-18"},{"d":"2025-04-24","k":"change","a":143837.99,"t":"Harrison Avenue streetscapes Phase II (PC24-022), change orders 2-5 \u00b7 Not detailed in agenda title","payee":"CBC Construction","vid":"cbc","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_04242025-742?html=true","s":"2025-04-24"},{"d":"2025-08-12","k":"change","a":106245.29,"t":"Harrison Avenue streetscapes Phase II (PC24-022), change order 6 \u00b7 Not detailed in agenda title","payee":"CBC Construction","vid":"cbc","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_08122025-761?html=true","s":"2025-08-12"},{"d":"2025-09-23","k":"change","a":193604.25,"t":"Harrison Avenue streetscapes Phase II (PC24-022), change order 7 \u00b7 Not detailed in agenda title","payee":"CBC Construction","vid":"cbc","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_09232025-768?html=true","s":"2025-09-23"}],"flags":[],"gaps":[],"base":{"a":6964150.0,"t":"original contract"},"now":{"a":7407837.53,"t":"contract with change orders so far","open":true},"vendor":"cbc","vn":"CBC Construction","growth":6.4,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2024-06-18","last":"2025-09-23","money":7407837.53},{"id":"co-pc-marshall-brothers-cdbg-dr-project-storm-group-d-itb-pc25-014","n":"CDBG-DR Project STORM Group D (ITB PC25-014)","gk":"pc","g":"Panama City","agency":"Panama City","what":"Contract with Marshall Brothers Construction & Engineering.","status":"contract","src":"contracts","ev":[{"d":"2024-12-30","k":"award","a":1327481.0,"t":"Contract awarded (Competitive sealed bid (invitation to bid))","payee":"Marshall Brothers Construction & Engineering","vid":"marshall-brothers","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_12302024-732?html=true","s":"2024-12-30"},{"d":"2025-05-13","k":"change","a":179786.0,"t":"CDBG-DR Project STORM Group D (ITB PC25-014), change order 3 \u00b7 Not detailed in agenda title","payee":"Marshall Brothers Construction & Engineering","vid":"marshall-brothers","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_05132025-745?html=true","s":"2025-05-13"}],"flags":[{"r":"growth","sev":"warn","note":"Change orders add 14% ($180K) to the $1.3M original."}],"gaps":[],"base":{"a":1327481.0,"t":"original contract"},"now":{"a":1507267.0,"t":"contract with change orders so far","open":true},"vendor":"marshall-brothers","vn":"Marshall Brothers Construction & Engineering","growth":13.5,"sev":"warn","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2024-12-30","last":"2025-05-13","money":1507267.0},{"id":"co-county-ecsc-minge-branch-drive-project","n":"Minge Branch Drive project","gk":"county","g":"Bay County","agency":"Bay County","what":"Contract with ECSC (Emerald Coast Site Construction).","status":"contract","src":"contracts","ev":[{"d":"2024-07-02","k":"award","a":2046860.79,"t":"Contract awarded (Competitive sealed bid (invitation to bid) (award of base bid))","payee":"ECSC (Emerald Coast Site Construction)","vid":"ecsc","u":"https://baycountyfl.primegov.com/Portal/Meeting?compiledMeetingDocumentFileId=3221","s":"2024-07-02"},{"d":"2025-06-17","k":"change","a":364145.69,"t":"Minge Branch Drive project \u00b7 Increased construction cost due to additional subsoil excavation","payee":"ECSC (Emerald Coast Site Construction)","vid":"ecsc","u":"https://baycountyfl.primegov.com/Portal/Meeting?compiledMeetingDocumentFileId=4176","s":"2025-06-17"}],"flags":[{"r":"growth","sev":"warn","note":"Change orders add 18% ($364K) to the $2.0M original."}],"gaps":[],"base":{"a":2046860.79,"t":"original contract"},"now":{"a":2411006.48,"t":"contract with change orders so far","open":true},"vendor":"ecsc","vn":"ECSC (Emerald Coast Site Construction)","growth":17.8,"sev":"warn","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2024-07-02","last":"2025-06-17","money":2411006.48},{"id":"co-pc-marshall-brothers-cdbg-dr-project-storm-group-f-itb-pc25-035","n":"CDBG-DR Project STORM Group F (ITB PC25-035)","gk":"pc","g":"Panama City","agency":"Panama City","what":"Contract with Marshall Brothers Construction & Engineering.","status":"contract","src":"contracts","ev":[{"d":"2025-05-13","k":"award","a":1518199.0,"t":"Contract awarded (Competitive sealed bid (invitation to bid))","payee":"Marshall Brothers Construction & Engineering","vid":"marshall-brothers","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_05132025-745?html=true","s":"2025-05-13"},{"d":"2025-06-24","k":"change","a":-206418.0,"t":"CDBG-DR Project STORM Group F (ITB PC25-035), deductive change order 1 \u00b7 Deductive change order","payee":"Marshall Brothers Construction & Engineering","vid":"marshall-brothers","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_06242025-751?html=true","s":"2025-06-24"}],"flags":[],"gaps":[],"base":{"a":1518199.0,"t":"original contract"},"now":{"a":1311781.0,"t":"contract with change orders so far","open":true},"vendor":"marshall-brothers","vn":"Marshall Brothers Construction & Engineering","growth":-13.6,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2025-05-13","last":"2025-06-24","money":1311781.0},{"id":"co-county-phoenix-frankford-avenue-booster-station-contract-25-06","n":"Frankford Avenue booster station (contract 25-06)","gk":"county","g":"Bay County","agency":"Bay County","what":"Contract with Phoenix Construction Services.","status":"contract","src":"contracts","ev":[{"d":"2025-04-01","k":"award","a":8571430.0,"t":"Contract awarded (Competitive sealed bid (invitation to bid))","payee":"Phoenix Construction Services","vid":"phoenix","u":"https://baycountyfl.primegov.com/Portal/Meeting?compiledMeetingDocumentFileId=4052","s":"2025-04-01"},{"d":"2025-04-01","k":"vote","t":"Award vote: passed 5-0","u":"https://bayforms.baycoclerk.com/PublicAccess/PublicRecordSearch/","tally":"5-0","members":{"Daniel Raffield":"yes","Robert Carroll":"yes","Doug Crosby":"yes","Douglas Moore":"yes","Clair Pease":"yes"},"s":"2025-04-01"},{"d":"2025-09-03","k":"change","a":-275000.0,"t":"Frankford Avenue booster station (contract 25-06), deductive change order \u00b7 Alternate design; approximate net savings, final amount to be determined at project close","payee":"Phoenix Construction Services","vid":"phoenix","u":"https://baycountyfl.primegov.com/Portal/Meeting?compiledMeetingDocumentFileId=4272","s":"2025-09-03"}],"flags":[],"gaps":[],"base":{"a":8571430.0,"t":"original contract"},"now":{"a":8296430.0,"t":"contract with change orders so far","open":true},"vendor":"phoenix","vn":"Phoenix Construction Services","growth":-3.2,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2025-04-01","last":"2025-09-03","money":8296430.0},{"id":"co-pc-burke-construction-group-martin-luther-king-jr-recreation-center","n":"Martin Luther King Jr. Recreation Center","gk":"pc","g":"Panama City","agency":"Panama City","what":"Contract with Burke Construction Group, Inc..","status":"contract","src":"contracts","ev":[{"d":"2024-01-23","k":"award","a":19549646.0,"t":"Contract awarded (Not stated in agenda item)","payee":"Burke Construction Group, Inc.","vid":"burke-construction-group","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_01232024-660?html=true","s":"2024-01-23"},{"d":"2024-01-23","k":"vote","t":"Award vote: passed 4-0","u":"https://www.panamacity.gov/AgendaCenter/ViewFile/Minutes/_01232024-660","tally":"4-0","members":{"Michael Rohan":"yes","Josh Street":"absent","Jenna Haligas":"yes","Janice Lucas":"yes","Brian Grainger":"yes"},"s":"2024-01-23"},{"d":"2025-09-23","k":"change","a":262722.39,"t":"Martin Luther King Jr. Recreation Center, change order 2 \u00b7 Cumulative federal and non-federal change orders","payee":"Burke Construction Group, Inc.","vid":"burke-construction-group","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_09232025-768?html=true","s":"2025-09-23"},{"d":"2026-03-10","k":"change","a":263888.46,"t":"Martin Luther King Jr. Recreation Center, final change order \u00b7 Final federal change order $289,467.50 and non-federal change order -$25,579.04","payee":"Burke Construction Group, Inc.","vid":"burke-construction-group","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_03102026-834?html=true","s":"2026-03-10"}],"flags":[],"gaps":[],"base":{"a":19549646.0,"t":"original contract"},"now":{"a":20076256.85,"t":"contract with change orders so far","open":true},"vendor":"burke-construction-group","vn":"Burke Construction Group, Inc.","growth":2.7,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2024-01-23","last":"2026-03-10","money":20076256.85},{"id":"co-county-roberts-and-roberts-fy25-annual-resurfacing-phase-2-contract-25","n":"FY25 Annual Resurfacing Phase 2 (contract 25-42)","gk":"county","g":"Bay County","agency":"Bay County","what":"Contract with Roberts and Roberts.","status":"contract","src":"contracts","ev":[{"d":"2025-07-15","k":"award","a":922305.9,"t":"Contract awarded (Competitive sealed bid (invitation to bid))","payee":"Roberts and Roberts","vid":"roberts-and-roberts","u":"https://baycountyfl.primegov.com/Portal/Meeting?compiledMeetingDocumentFileId=4203","s":"2025-07-15"},{"d":"2025-10-07","k":"change","a":133434.25,"t":"FY25 Annual Resurfacing Phase 2 (contract 25-42), change order 1 \u00b7 Emergency stabilization work for unsuitable soils on East 26th Street (approve and ratify)","payee":"Roberts and Roberts","vid":"roberts-and-roberts","u":"https://baycountyfl.primegov.com/Portal/Meeting?compiledMeetingDocumentFileId=4390","s":"2025-10-07"}],"flags":[{"r":"growth","sev":"warn","note":"Change orders add 14% ($133K) to the $922K original."}],"gaps":[],"base":{"a":922305.9,"t":"original contract"},"now":{"a":1055740.15,"t":"contract with change orders so far","open":true},"vendor":"roberts-and-roberts","vn":"Roberts and Roberts","growth":14.5,"sev":"warn","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2025-07-15","last":"2025-10-07","money":1055740.15},{"id":"co-pc-mainline-cdbg-dr-project-storm-group-c-itb-pc24-046","n":"CDBG-DR Project STORM Group C (ITB PC24-046)","gk":"pc","g":"Panama City","agency":"Panama City","what":"Contract with Mainline Construction.","status":"contract","src":"contracts","ev":[{"d":"2024-11-12","k":"award","a":2192224.92,"t":"Contract awarded (Competitive sealed bid (invitation to bid))","payee":"Mainline Construction","vid":"mainline","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_11122024-719?html=true","s":"2024-11-12"},{"d":"2024-11-12","k":"vote","t":"Award vote: passed 5-0","u":"https://www.panamacity.gov/AgendaCenter/ViewFile/Minutes/_11122024-719","tally":"5-0","members":{"Michael Rohan":"yes","Josh Street":"yes","Jenna Haligas":"yes","Janice Lucas":"yes","Brian Grainger":"yes"},"s":"2024-11-12"},{"d":"2025-12-16","k":"change","a":194336.49,"t":"CDBG-DR Project STORM Group C (ITB PC24-046), change order 5 \u00b7 Not detailed in agenda title","payee":"Mainline Construction","vid":"mainline","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_12162025-796?html=true","s":"2025-12-16"}],"flags":[],"gaps":[],"base":{"a":2192224.92,"t":"original contract"},"now":{"a":2386561.41,"t":"contract with change orders so far","open":true},"vendor":"mainline","vn":"Mainline Construction","growth":8.9,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2024-11-12","last":"2025-12-16","money":2386561.41},{"id":"co-pc-southern-construction-cdbg-dr-hometown-revitalization-group-gb-pc25","n":"CDBG-DR Hometown Revitalization Group Gb (PC25-047)","gk":"pc","g":"Panama City","agency":"Panama City","what":"Contract with Southern Construction Services.","status":"contract","src":"contracts","ev":[{"d":"2025-10-14","k":"award","a":460698.5,"t":"Contract awarded (Competitive sealed bid (invitation to bid))","payee":"Southern Construction Services","vid":"southern-construction","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_10142025-771?html=true","s":"2025-10-14"},{"d":"2025-12-16","k":"change","a":197360.47,"t":"CDBG-DR Hometown Revitalization Group Gb (PC25-047), change order 1 \u00b7 Not detailed in agenda title","payee":"Southern Construction Services","vid":"southern-construction","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_12162025-796?html=true","s":"2025-12-16"}],"flags":[{"r":"growth","sev":"high","note":"Change orders add 43% ($197K) to the $461K original."}],"gaps":[],"base":{"a":460698.5,"t":"original contract"},"now":{"a":658058.97,"t":"contract with change orders so far","open":true},"vendor":"southern-construction","vn":"Southern Construction Services","growth":42.8,"sev":"high","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2025-10-14","last":"2025-12-16","money":658058.97},{"id":"co-county-barge-southport-sports-complex-design-services-po-20200409","n":"Southport Sports Complex design services (PO 20200409)","gk":"county","g":"Bay County","agency":"Bay County","what":"Contract with Barge Design Solutions.","status":"contract","src":"contracts","ev":[{"d":"2026-01-06","k":"change","a":123595.0,"t":"Southport Sports Complex design services (PO 20200409), change order 3 \u00b7 Additional construction administration and resident project representative services","payee":"Barge Design Solutions","vid":"barge","u":"https://baycountyfl.primegov.com/Portal/Meeting?compiledMeetingDocumentFileId=4523","s":"2026-01-06"}],"flags":[],"gaps":[{"q":"The original contract amount and every change order (with amounts and reasons) for the Bay County contract with Barge Design Solutions: Southport Sports Complex design services (PO 20200409)","gk":"county"}],"vendor":"barge","vn":"Barge Design Solutions","sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2026-01-06","last":"2026-01-06","money":0},{"id":"co-mb-razorback-lift-station-bypass-pumps","n":"Lift station bypass pumps","gk":"mb","g":"Mexico Beach","agency":"Mexico Beach","what":"Contract with Razorback LLC.","status":"contract","src":"contracts","ev":[{"d":"2025-04-23","k":"award","a":531000.0,"t":"Contract awarded (Not stated in minutes)","payee":"Razorback LLC","vid":"razorback","u":"https://mexicobeachfl.gov/uploads/2025/04/April-23-2025-City-Council-Meeting-Minutes.pdf","s":"2025-04-23"},{"d":"2026-01-13","k":"change","a":-263291.6,"t":"Lift station bypass pumps, deductive change orders \u00b7 Scope moved to Mainline Construction, which was already mobilized at each site (net savings $55,087.10)","payee":"Razorback LLC","vid":"razorback","u":"https://mexicobeachfl.gov/uploads/2026/01/January-13-2026-City-Council-Meeting-Minutes.pdf","s":"2026-01-13"}],"flags":[],"gaps":[],"base":{"a":531000.0,"t":"original contract"},"now":{"a":267708.4,"t":"contract with change orders so far","open":true},"vendor":"razorback","vn":"Razorback LLC","growth":-49.6,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2025-04-23","last":"2026-01-13","money":267708.4},{"id":"co-mb-mainline-lift-station-bypass-pumps","n":"Lift station bypass pumps","gk":"mb","g":"Mexico Beach","agency":"Mexico Beach","what":"Contract with Mainline Construction.","status":"contract","src":"contracts","ev":[{"d":"2025-04-08","k":"award","a":1222819.6,"t":"Contract awarded (Competitive sealed bid (invitation to bid) (low bids))","payee":"Mainline Construction","vid":"mainline","u":"https://mexicobeachfl.gov/uploads/2025/05/April-8-2025-City-Council-Meeting-Minutes.pdf","s":"2025-04-08"},{"d":"2025-04-08","k":"vote","t":"Award vote: passed unanimous","u":"https://mexicobeachfl.gov/uploads/2025/05/April-8-2025-City-Council-Meeting-Minutes.pdf","tally":"unanimous","members":{"Richard Wolff":"yes","Jerry Smith":"yes","Tim Linderman":"yes","Linda Hamilton":"yes","Jason Adams":"yes"},"s":"2025-04-08"},{"d":"2026-01-13","k":"change","a":208204.5,"t":"Lift station bypass pumps, add change orders (scope moved from Razorback) \u00b7 Took over bypass-pump scope from Razorback LLC","payee":"Mainline Construction","vid":"mainline","u":"https://mexicobeachfl.gov/uploads/2026/01/January-13-2026-City-Council-Meeting-Minutes.pdf","s":"2026-01-13"}],"flags":[],"gaps":[],"base":{"a":1222819.6,"t":"original contract"},"now":{"a":1431024.1,"t":"contract with change orders so far","open":true},"vendor":"mainline","vn":"Mainline Construction","growth":17.0,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2025-04-08","last":"2026-01-13","money":1431024.1},{"id":"co-pc-mainline-srf-area-d-14-infrastructure-improvements-pc25-033","n":"SRF Area D-14 infrastructure improvements (PC25-033)","gk":"pc","g":"Panama City","agency":"Panama City","what":"Contract with Mainline Construction.","status":"contract","src":"contracts","ev":[{"d":"2025-04-24","k":"award","a":4607573.44,"t":"Contract awarded (Competitive sealed bid (invitation to bid))","payee":"Mainline Construction","vid":"mainline","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_04242025-742?html=true","s":"2025-04-24"},{"d":"2025-04-24","k":"vote","t":"Award vote: passed 4-0","u":"https://www.panamacity.gov/AgendaCenter/ViewFile/Minutes/_04242025-742","tally":"4-0","members":{"Michael Rohan":"yes","Josh Street":"absent","Jenna Haligas":"yes","Janice Lucas":"yes","Brian Grainger":"yes"},"s":"2025-04-24"},{"d":"2026-01-27","k":"change","a":180079.14,"t":"SRF Area D-14 infrastructure improvements (PC25-033), change order 3 \u00b7 Additions essential to project completion","payee":"Mainline Construction","vid":"mainline","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_01272026-813?html=true","s":"2026-01-27"}],"flags":[],"gaps":[],"base":{"a":4607573.44,"t":"original contract"},"now":{"a":4787652.58,"t":"contract with change orders so far","open":true},"vendor":"mainline","vn":"Mainline Construction","growth":3.9,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2025-04-24","last":"2026-01-27","money":4787652.58},{"id":"co-pc-gcuc-cdbg-dr-area-o-11-pc24-037","n":"CDBG-DR Area O-11 (PC24-037)","gk":"pc","g":"Panama City","agency":"Panama City","what":"Contract with Gulf Coast Utility Contractors.","status":"contract","src":"contracts","ev":[{"d":"2024-08-27","k":"award","a":5722381.25,"t":"Contract awarded (Competitive sealed bid (invitation to bid))","payee":"Gulf Coast Utility Contractors","vid":"gcuc","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_08272024-700?html=true","s":"2024-08-27"},{"d":"2024-08-27","k":"vote","t":"Award vote: passed 4-0","u":"https://www.panamacity.gov/AgendaCenter/ViewFile/Minutes/_08272024-700","tally":"4-0","members":{"Michael Rohan":"yes","Josh Street":"yes","Jenna Haligas":"yes","Janice Lucas":"absent","Brian Grainger":"yes"},"s":"2024-08-27"},{"d":"2026-02-10","k":"change","a":402319.0,"t":"CDBG-DR Area O-11 (PC24-037), change order 5 \u00b7 Additions, modifications and actions essential for completion","payee":"Gulf Coast Utility Contractors","vid":"gcuc","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_02102026-825?html=true","s":"2026-02-10"},{"d":"2026-06-09","k":"change","a":940652.41,"t":"CDBG-DR Area O-11 (PC24-037), change orders 12-15 \u00b7 Not detailed in agenda title","payee":"Gulf Coast Utility Contractors","vid":"gcuc","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_06092026-861?html=true","s":"2026-06-09"},{"d":"2026-07-14","k":"change","a":132082.6,"t":"CDBG-DR Area O-11 (PC24-037), change order 16 \u00b7 Not detailed in agenda title","payee":"Gulf Coast Utility Contractors","vid":"gcuc","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_07142026-871?html=true","s":"2026-07-14"}],"flags":[{"r":"growth","sev":"high","note":"Change orders add 26% ($1.5M) to the $5.7M original."}],"gaps":[],"base":{"a":5722381.25,"t":"original contract"},"now":{"a":7197435.26,"t":"contract with change orders so far","open":true},"vendor":"gcuc","vn":"Gulf Coast Utility Contractors","growth":25.8,"sev":"high","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2024-08-27","last":"2026-07-14","money":7197435.26},{"id":"co-pc-gcuc-cdbg-dr-project-restore-millville","n":"CDBG-DR Project Restore Millville","gk":"pc","g":"Panama City","agency":"Panama City","what":"Contract with Gulf Coast Utility Contractors.","status":"contract","src":"contracts","ev":[{"d":"2024-02-27","k":"award","a":10365877.25,"t":"Contract awarded (Competitive sealed bid (invitation to bid))","payee":"Gulf Coast Utility Contractors","vid":"gcuc","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_02272024-664?html=true","s":"2024-02-27"},{"d":"2024-02-27","k":"vote","t":"Award vote: passed 5-0","u":"https://www.panamacity.gov/AgendaCenter/ViewFile/Minutes/_02272024-664","tally":"5-0","members":{"Michael Rohan":"yes","Josh Street":"yes","Jenna Haligas":"yes","Janice Lucas":"yes","Brian Grainger":"yes"},"s":"2024-02-27"},{"d":"2026-02-24","k":"change","a":-3876618.5,"t":"CDBG-DR Project Restore Millville, deductive change order 4 \u00b7 Clean-up change order for the completed project","payee":"Gulf Coast Utility Contractors","vid":"gcuc","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_02242026-826?html=true","s":"2026-02-24"}],"flags":[],"gaps":[],"base":{"a":10365877.25,"t":"original contract"},"now":{"a":6489258.75,"t":"contract with change orders so far","open":true},"vendor":"gcuc","vn":"Gulf Coast Utility Contractors","growth":-37.4,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2024-02-27","last":"2026-02-24","money":6489258.75},{"id":"co-pc-unnamed-martin-theatre-renovation","n":"Martin Theatre renovation","gk":"pc","g":"Panama City","agency":"Panama City","what":"Contract with Not named in the record.","status":"contract","src":"contracts","ev":[{"d":"2026-03-10","k":"change","a":424966.43,"t":"Martin Theatre renovation, change order 2 \u00b7 Non-federal $146,588.20 plus federal $278,378.23","payee":"Not named in the record","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_03102026-834?html=true","s":"2026-03-10"},{"d":"2026-05-26","k":"change","a":1130256.54,"t":"Martin Theatre renovation, change order 3 \u00b7 Deductive non-federal (-$1,257,194.34) and federal (+$2,387,450.88) change orders","payee":"Not named in the record","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_05262026-855?html=true","s":"2026-05-26"}],"flags":[],"gaps":[{"q":"The original contract amount and every change order (with amounts and reasons) for the Panama City contract with Not named in the record: Martin Theatre renovation","gk":"pc"}],"vendor":null,"vn":"Not named in the record","sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2026-03-10","last":"2026-05-26","money":0},{"id":"co-pc-gcuc-srf-area-f1","n":"SRF Area F1","gk":"pc","g":"Panama City","agency":"Panama City","what":"Contract with Gulf Coast Utility Contractors.","status":"contract","src":"contracts","ev":[{"d":"2026-03-10","k":"change","a":395140.0,"t":"SRF Area F1, change order 4 \u00b7 Work not included in plans but essential to completion","payee":"Gulf Coast Utility Contractors","vid":"gcuc","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_03102026-834?html=true","s":"2026-03-10"}],"flags":[],"gaps":[{"q":"The original contract amount and every change order (with amounts and reasons) for the Panama City contract with Gulf Coast Utility Contractors: SRF Area F1","gk":"pc"}],"vendor":"gcuc","vn":"Gulf Coast Utility Contractors","sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2026-03-10","last":"2026-03-10","money":0},{"id":"co-pc-cbc-cdbg-dr-project-restore-area-a2-pc24-006","n":"CDBG-DR Project Restore Area A2 (PC24-006)","gk":"pc","g":"Panama City","agency":"Panama City","what":"Contract with CBC Construction.","status":"contract","src":"contracts","ev":[{"d":"2026-03-24","k":"change","a":171664.39,"t":"CDBG-DR Project Restore Area A2 (PC24-006), change order 4 \u00b7 Design adjustments and resulting timeline delays; adds 27 days","payee":"CBC Construction","vid":"cbc","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_03242026-835?html=true","s":"2026-03-24"},{"d":"2026-07-14","k":"change","a":152215.39,"t":"CDBG-DR Area A-2 Subsection A, change order 5 \u00b7 Drainage modifications at 29 residential driveways","payee":"CBC Construction","vid":"cbc","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_07142026-871?html=true","s":"2026-07-14"}],"flags":[],"gaps":[{"q":"The original contract amount and every change order (with amounts and reasons) for the Panama City contract with CBC Construction: CDBG-DR Project Restore Area A2 (PC24-006)","gk":"pc"}],"vendor":"cbc","vn":"CBC Construction","sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2026-03-24","last":"2026-07-14","money":0},{"id":"co-county-gcuc-emergency-jail-water-line-for-fire-flow-installation","n":"Emergency jail water line for fire flow (installation)","gk":"county","g":"Bay County","agency":"Bay County","what":"Contract with Gulf Coast Utility Contractors.","status":"contract","src":"contracts","ev":[{"d":"2026-05-05","k":"change","a":86693.88,"t":"Emergency jail water line for fire flow (installation) \u00b7 Minor scope and field construction adjustments","payee":"Gulf Coast Utility Contractors","vid":"gcuc","u":"https://baycountyfl.primegov.com/Portal/Meeting?compiledMeetingDocumentFileId=4748","s":"2026-05-05"},{"d":null,"k":"award","a":85451.0,"t":"Original contract amount, as stated on the change-order agenda item","payee":"Gulf Coast Utility Contractors","vid":"gcuc","u":"https://baycountyfl.primegov.com/Portal/Meeting?compiledMeetingDocumentFileId=4748","s":"9999"}],"flags":[{"r":"growth","sev":"high","note":"Change orders add 102% ($87K) to the $85K original."}],"gaps":[],"base":{"a":85451.0,"t":"original contract"},"now":{"a":172144.88,"t":"contract with change orders so far","open":true},"vendor":"gcuc","vn":"Gulf Coast Utility Contractors","growth":101.5,"sev":"high","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2026-05-05","last":"2026-05-05","money":172144.88},{"id":"co-county-staline-waterworks-emergency-jail-water-line-for-fire-flow-mate","n":"Emergency jail water line for fire flow (materials)","gk":"county","g":"Bay County","agency":"Bay County","what":"Contract with STAline Waterworks, Inc..","status":"contract","src":"contracts","ev":[{"d":"2026-05-05","k":"change","a":53264.6,"t":"Emergency jail water line for fire flow (materials) \u00b7 Minor scope and field construction adjustments","payee":"STAline Waterworks, Inc.","vid":"staline-waterworks","u":"https://baycountyfl.primegov.com/Portal/Meeting?compiledMeetingDocumentFileId=4748","s":"2026-05-05"},{"d":null,"k":"award","a":69073.8,"t":"Original contract amount, as stated on the change-order agenda item","payee":"STAline Waterworks, Inc.","vid":"staline-waterworks","u":"https://baycountyfl.primegov.com/Portal/Meeting?compiledMeetingDocumentFileId=4748","s":"9999"}],"flags":[{"r":"growth","sev":"high","note":"Change orders add 77% ($53K) to the $69K original."}],"gaps":[],"base":{"a":69073.8,"t":"original contract"},"now":{"a":122338.4,"t":"contract with change orders so far","open":true},"vendor":"staline-waterworks","vn":"STAline Waterworks, Inc.","growth":77.1,"sev":"high","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2026-05-05","last":"2026-05-05","money":122338.4},{"id":"co-county-mrd-associates-east-pass-feasibility-study","n":"East Pass feasibility study","gk":"county","g":"Bay County","agency":"Bay County","what":"Contract with MRD Associates, Inc..","status":"contract","src":"contracts","ev":[{"d":"2026-06-02","k":"change","a":183750.0,"t":"East Pass feasibility study, change order 2 \u00b7 Additional study work (not detailed in recommendation)","payee":"MRD Associates, Inc.","u":"https://baycountyfl.primegov.com/Portal/Meeting?compiledMeetingDocumentFileId=4766","s":"2026-06-02"}],"flags":[],"gaps":[{"q":"The original contract amount and every change order (with amounts and reasons) for the Bay County contract with MRD Associates, Inc.: East Pass feasibility study","gk":"county"}],"vendor":null,"vn":"MRD Associates, Inc.","sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2026-06-02","last":"2026-06-02","money":0},{"id":"co-pc-mott-macdonald-task-order-23-039-cdbg-dr-project-storm","n":"Task Order 23-039, CDBG-DR Project STORM","gk":"pc","g":"Panama City","agency":"Panama City","what":"Contract with Mott MacDonald.","status":"contract","src":"contracts","ev":[{"d":"2026-07-14","k":"change","a":340297.84,"t":"Task Order 23-039, CDBG-DR Project STORM, amendment 1 \u00b7 Task order amendment","payee":"Mott MacDonald","vid":"mott-macdonald","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_07142026-871?html=true","s":"2026-07-14"}],"flags":[],"gaps":[{"q":"The original contract amount and every change order (with amounts and reasons) for the Panama City contract with Mott MacDonald: Task Order 23-039, CDBG-DR Project STORM","gk":"pc"}],"vendor":"mott-macdonald","vn":"Mott MacDonald","sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2026-07-14","last":"2026-07-14","money":0},{"id":"co-county-cdr-maguire-cei-eastern-shipbuilding-seawall-and-dredging-proje","n":"CEI, Eastern Shipbuilding seawall and dredging project","gk":"county","g":"Bay County","agency":"Bay County","what":"Contract with CDR Maguire.","status":"contract","src":"contracts","ev":[{"d":"2024-06-18","k":"award","a":1130977.7,"t":"Contract awarded (Not stated in agenda item)","payee":"CDR Maguire","vid":"cdr-maguire","u":"https://baycountyfl.primegov.com/Portal/Meeting?compiledMeetingDocumentFileId=3127","s":"2024-06-18"},{"d":"2026-08-18","k":"change","a":104692.5,"t":"CEI, Eastern Shipbuilding seawall and dredging project, change order 2 \u00b7 Additional construction engineering and inspection services","payee":"CDR Maguire","vid":"cdr-maguire","u":"https://baycountyfl.primegov.com/Portal/Meeting?compiledMeetingDocumentFileId=5139","s":"2026-08-18"}],"flags":[],"gaps":[],"base":{"a":1130977.7,"t":"original contract"},"now":{"a":1235670.2,"t":"contract with change orders so far","open":true},"vendor":"cdr-maguire","vn":"CDR Maguire","growth":9.3,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2024-06-18","last":"2026-08-18","money":1235670.2},{"id":"co-pc-ecsc-srf-baker-court-utility-and-roadway-improvements-pc25-038","n":"SRF Baker Court utility and roadway improvements (PC25-038)","gk":"pc","g":"Panama City","agency":"Panama City","what":"Contract with ECSC (Emerald Coast Site Construction).","status":"contract","src":"contracts","ev":[{"d":"2025-09-23","k":"award","a":2964071.12,"t":"Contract awarded (Competitive sealed bid (invitation to bid))","payee":"ECSC (Emerald Coast Site Construction)","vid":"ecsc","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_09232025-768?html=true","s":"2025-09-23"},{"d":"2025-09-23","k":"vote","t":"Award vote: passed 5-0","u":"https://www.panamacity.gov/AgendaCenter/ViewFile/Minutes/_09232025-768","tally":"5-0","members":{"Allan Branch":"yes","Robbie Hughes":"yes","Janice Lucas":"yes","Brian Grainger":"yes","Josh Street":"yes"},"s":"2025-09-23"},{"d":"2026-08-25","k":"change","a":181825.93,"t":"SRF Baker Court utility and roadway improvements (PC25-038), change order 3 \u00b7 Added stormwater improvements to eliminate flooding at the eastern cul-de-sac","payee":"ECSC (Emerald Coast Site Construction)","vid":"ecsc","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_08252026-880?html=true","s":"2026-08-25"},{"d":"2026-08-25","k":"vote","t":"Change-order vote: passed 4-0","u":"https://www.panamacity.gov/AgendaCenter/ViewFile/Minutes/_08252026-880","tally":"4-0","members":{"Allan Branch":"yes","Robbie Hughes":"yes","Janice Lucas":"absent","Brian Grainger":"yes","Josh Street":"yes"},"s":"2026-08-25"}],"flags":[],"gaps":[],"base":{"a":2964071.12,"t":"original contract"},"now":{"a":3145897.0500000003,"t":"contract with change orders so far","open":true},"vendor":"ecsc","vn":"ECSC (Emerald Coast Site Construction)","growth":6.1,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2025-09-23","last":"2026-08-25","money":3145897.0500000003},{"id":"co-county-emr-fountain-community-northern-region-resiliency-center-contra","n":"Fountain Community Northern Region Resiliency Center (contract 25-38)","gk":"county","g":"Bay County","agency":"Bay County","what":"Contract with EMR.","status":"contract","src":"contracts","ev":[{"d":"2025-08-05","k":"award","a":12732910.0,"t":"Contract awarded (Competitive sealed bid (invitation to bid))","payee":"EMR","vid":"emr","u":"https://baycountyfl.primegov.com/Portal/Meeting?compiledMeetingDocumentFileId=4218","s":"2025-08-05"},{"d":"2025-08-05","k":"vote","t":"Award vote: passed 5-0","u":"https://bayforms.baycoclerk.com/PublicAccess/PublicRecordSearch/","tally":"5-0","members":{"Daniel Raffield":"yes","Robert Carroll":"yes","Doug Crosby":"yes","Douglas Moore":"yes","Clair Pease":"yes"},"s":"2025-08-05"},{"d":"2026-09-01","k":"change","a":432970.0,"t":"Fountain Community Northern Region Resiliency Center (contract 25-38), change order 4 \u00b7 Construction change order with 121-day time extension","payee":"EMR","vid":"emr","u":"https://baycountyfl.primegov.com/Portal/Meeting?compiledMeetingDocumentFileId=5172","s":"2026-09-01"}],"flags":[],"gaps":[],"base":{"a":12732910.0,"t":"original contract"},"now":{"a":13115880.0,"t":"contract with change orders so far","open":true},"vendor":"emr","vn":"EMR","growth":3.0,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2025-08-05","last":"2026-09-01","money":13115880.0},{"id":"co-county-southern-construction-utility-services-administration-building","n":"Utility Services administration building renovation (contract 26-32)","gk":"county","g":"Bay County","agency":"Bay County","what":"Contract with Southern Construction Services.","status":"contract","src":"contracts","ev":[{"d":"2026-05-19","k":"award","a":324134.0,"t":"Contract awarded (Competitive sealed bid (invitation to bid))","payee":"Southern Construction Services","vid":"southern-construction","u":"https://baycountyfl.primegov.com/Portal/Meeting?compiledMeetingDocumentFileId=4757","s":"2026-05-19"},{"d":"2026-09-01","k":"change","a":52700.0,"t":"Utility Services administration building renovation (contract 26-32), change order 1 \u00b7 Unforeseen conditions","payee":"Southern Construction Services","vid":"southern-construction","u":"https://baycountyfl.primegov.com/Portal/Meeting?compiledMeetingDocumentFileId=5172","s":"2026-09-01"}],"flags":[{"r":"growth","sev":"warn","note":"Change orders add 16% ($53K) to the $324K original."}],"gaps":[],"base":{"a":324134.0,"t":"original contract"},"now":{"a":376834.0,"t":"contract with change orders so far","open":true},"vendor":"southern-construction","vn":"Southern Construction Services","growth":16.3,"sev":"warn","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2026-05-19","last":"2026-09-01","money":376834.0},{"id":"co-county-anderson-columbia-county-line-road-paving","n":"County Line Road paving","gk":"county","g":"Bay County","agency":"Bay County","what":"Contract with Anderson Columbia Co..","status":"contract","src":"contracts","ev":[{"d":"2025-12-02","k":"award","a":1994232.87,"t":"Contract awarded (Competitive sealed bid (invitation to bid) (award of base bid))","payee":"Anderson Columbia Co.","vid":"anderson-columbia","u":"https://baycountyfl.primegov.com/Portal/Meeting?compiledMeetingDocumentFileId=4480","s":"2025-12-02"},{"d":"2026-09-15","k":"change","a":756991.4,"t":"County Line Road paving, change order 2 \u00b7 Change order adding 180 calendar days (reason not detailed in recommendation)","payee":"Anderson Columbia Co.","vid":"anderson-columbia","u":"https://baycountyfl.primegov.com/Portal/Meeting?compiledMeetingDocumentFileId=5217","s":"2026-09-15"}],"flags":[{"r":"growth","sev":"high","note":"Change orders add 38%+ ($757K) to the $2.0M original."}],"gaps":[],"base":{"a":1994232.87,"t":"original contract"},"now":{"a":2751224.27,"t":"contract with change orders so far","open":true},"vendor":"anderson-columbia","vn":"Anderson Columbia Co.","growth":38.0,"sev":"high","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2025-12-02","last":"2026-09-15","money":2751224.27},{"id":"co-pc-mainline-srf-area-h-pc26-012","n":"SRF Area H (PC26-012)","gk":"pc","g":"Panama City","agency":"Panama City","what":"Contract with Mainline Construction.","status":"contract","src":"contracts","ev":[{"d":"2026-01-13","k":"award","a":940240.33,"t":"Contract awarded (Competitive sealed bid (invitation to bid))","payee":"Mainline Construction","vid":"mainline","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_01132026-812?html=true","s":"2026-01-13"},{"d":"2026-10-13","k":"change","a":196358.1,"t":"SRF Area H (PC26-012), change order 1 \u00b7 Remove and replace project sidewalk","payee":"Mainline Construction","vid":"mainline","u":"https://panamacity.gov/AgendaCenter/ViewFile/Agenda/_10132026-901?html=true","s":"2026-10-13"}],"flags":[{"r":"growth","sev":"warn","note":"Change orders add 21% ($196K) to the $940K original."}],"gaps":[],"base":{"a":940240.33,"t":"original contract"},"now":{"a":1136598.43,"t":"contract with change orders so far","open":true},"vendor":"mainline","vn":"Mainline Construction","growth":20.9,"sev":"warn","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2026-01-13","last":"2026-10-13","money":1136598.43},{"id":"st-p5","n":"Scotts Ferry Road Bridge Replacement","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Unincorporated Bay County","what":"Scotts Ferry Road is a two lane paved roadway connecting Bay County and Calhoun County. The road currently has a structurally deficient one lane wooden bridge that has flooded during past rain events due to its low elevation. This project will construct a new two lane bridge at a higher elevation.","funding":"Half-cent infrastructure sales tax","status":"construction","src":"surtax","ev":[{"d":"FY2021","k":"budget","a":420000,"t":"Programmed in the county's sales tax schedule: Scotts Ferry Road Bridge Replacement (design) (in progress (under design))","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","s":"2020-10-01"},{"d":"FY2024","k":"budget","a":100000,"t":"Programmed in the county's sales tax schedule: Replace Scotts Ferry Road Bridge (75% FDOT) (in progress (under design))","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","s":"2023-10-01"},{"d":"2026-08-04","k":"milestone","t":"County project map: in progress, 30% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D5&outFields=*&outSR=4326&f=json","s":"2026-08-04"}],"flags":[{"r":"late","sev":"warn","note":"Programmed for FY2024; the county map shows it in progress at 30%."}],"gaps":[],"base":{"a":520000,"t":"programmed in the schedule"},"surtax":"p5","pct":30,"sev":"warn","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2020-10-01","last":"2026-08-04","money":520000,"vendor":null},{"id":"st-p6","n":"Deer Point Dam Bridge Repair","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Unincorporated Bay County","what":"County Road 3221 is a major collector roadway connecting U.S. Highway 231 and State Road 77. At the dam, the bridge deck has multiple cracks and minor deterioration needing repair. Additionally, the existing fishing walkway needs significant repairs. The proposed project will make repairs to the exi","funding":"Half-cent infrastructure sales tax","status":"complete","src":"surtax","ev":[{"d":"FY2017","k":"budget","a":474834,"t":"Programmed in the county's sales tax schedule: Deer Point Dam Bridge Rehabilitation (completed)","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","s":"2016-10-01"},{"d":"2026-08-04","k":"complete","t":"County project map: completed, 100% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D6&outFields=*&outSR=4326&f=json","s":"2026-08-04"}],"flags":[],"gaps":[],"base":{"a":474834,"t":"programmed in the schedule"},"surtax":"p6","pct":100,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2016-10-01","last":"2026-08-04","money":474834,"vendor":null},{"id":"st-p9","n":"Scott Road Bridge Replacement","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Unincorporated Bay County","what":"Scott Road is a two lane paved roadway serving local traffic. The roadway currently has a structurally deficient one- lane wooden bridge prone to flooding during rain due to its low elevation. The proposed project will construct a new two lane bridge at a higher elevation.","funding":"Half-cent infrastructure sales tax","status":"budgeted","src":"surtax","ev":[{"d":"FY2024","k":"budget","a":100000,"t":"Programmed in the county's sales tax schedule: Replace Scott Road Bridge (FDOT) (in progress (under design))","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","s":"2023-10-01"},{"d":"2026-08-04","k":"milestone","t":"County project map: not started, 0% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D9&outFields=*&outSR=4326&f=json","s":"2026-08-04"}],"flags":[{"r":"late","sev":"warn","note":"Programmed for FY2024; the county map shows it not started at 0%."}],"gaps":[],"base":{"a":100000,"t":"programmed in the schedule"},"surtax":"p9","pct":0,"sev":"warn","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2023-10-01","last":"2026-08-04","money":100000,"vendor":null},{"id":"st-p10","n":"Transmitter Road at US Highway 231 Intersection Improvements","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Unincorporated Bay County","what":"This project will consist of the addition of a dedicated right-turn lane for south-bound traffic at the intersection of Transmitter Road and U.S. Highway 231. Motorists on U.S. Highway 231 endure significant delays because of the time that is needed for the traffic signal to serve Transmitter Road. ","funding":"Half-cent infrastructure sales tax","status":"complete","src":"surtax","ev":[{"d":"FY2022","k":"budget","a":259000,"t":"Programmed in the county's sales tax schedule: Transmitter Rd & US 231 (SB Rt Turn Lane) ($1,384,000 FDOT Grant) (completed)","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","s":"2021-10-01"},{"d":"FY2023","k":"budget","a":1125000,"t":"Programmed in the county's sales tax schedule: Transmitter Rd & US 231 (SB Rt Turn Lane) ($1,384,000 FDOT Grant) (completed)","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","s":"2022-10-01"},{"d":"2026-08-04","k":"complete","t":"County project map: completed, 100% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D10&outFields=*&outSR=4326&f=json","s":"2026-08-04"}],"flags":[],"gaps":[],"base":{"a":1384000,"t":"programmed in the schedule"},"surtax":"p10","pct":100,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2021-10-01","last":"2026-08-04","money":1384000,"vendor":null},{"id":"st-p13","n":"Star Avenue and US Highway 231 Intersection Improvements","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Unincorporated Bay County","what":"This project will include the construction of a second left-turn lane at the intersection of Star Avenue and U.S. Highway 231 for vehicles turning off of Star Avenue. This intersection is heavily trafficked, and because of the close proximity to the intersection of Star Avenue and John Pitts Road th","funding":"Half-cent infrastructure sales tax","status":"construction","src":"surtax","ev":[{"d":"FY2024","k":"budget","a":2000000,"t":"Programmed in the county's sales tax schedule: Star Ave @ US 231 (in progress (under design))","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","s":"2023-10-01"},{"d":"2026-08-04","k":"milestone","t":"County project map: in progress, 10% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D13&outFields=*&outSR=4326&f=json","s":"2026-08-04"}],"flags":[{"r":"late","sev":"warn","note":"Programmed for FY2024; the county map shows it in progress at 10%."}],"gaps":[],"base":{"a":2000000,"t":"programmed in the schedule"},"surtax":"p13","pct":10,"sev":"warn","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2023-10-01","last":"2026-08-04","money":2000000,"vendor":null},{"id":"st-p41","n":"Joan Avenue at North Lagoon Drive Intersection Improvements","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Unincorporated Bay County","what":"This project will consist of the addition of left turn lanes for all approaches at the intersection of Joan Ave and North Lagoon Dr. Vehicles on all four approaches are forced to wait for a vehicle in the front of the queue to make a left turn before they can proceed through the intersection. The pr","funding":"Half-cent infrastructure sales tax","status":"construction","src":"surtax","ev":[{"d":"FY2022","k":"budget","a":200000,"t":"Programmed in the county's sales tax schedule: Joan Ave at North Lagoon Dr (in progress (under design))","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","s":"2021-10-01"},{"d":"FY2023","k":"budget","a":1000000,"t":"Programmed in the county's sales tax schedule: Joan Ave at North Lagoon Dr (in progress (under design))","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","s":"2022-10-01"},{"d":"2026-08-04","k":"milestone","t":"County project map: in progress, 10% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D41&outFields=*&outSR=4326&f=json","s":"2026-08-04"}],"flags":[{"r":"late","sev":"high","note":"Programmed for FY2023; the county map shows it in progress at 10%."}],"gaps":[],"base":{"a":1200000,"t":"programmed in the schedule"},"surtax":"p41","pct":10,"sev":"high","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2021-10-01","last":"2026-08-04","money":1200000,"vendor":null},{"id":"st-p42","n":"Sherman Avenue and 15th Street (US Highway 98) Intersection Improvements","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Unincorporated Bay County","what":"This project will include the construction of left-turn lanes for Sherman Avenue at its intersection with 15th Street (U.S. Highway 98). This intersection endures significant traffic volumes, forcing vehicles to wait for left-turning vehicles before they can proceed through the intersection. The pro","funding":"Half-cent infrastructure sales tax","status":"construction","src":"surtax","ev":[{"d":"FY2022","k":"budget","a":138000,"t":"Programmed in the county's sales tax schedule: Sherman Avenue & 15th Street (in progress (under design))","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","s":"2021-10-01"},{"d":"FY2023","k":"budget","a":750000,"t":"Programmed in the county's sales tax schedule: Sherman Avenue & 15th Street (in progress (under design))","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","s":"2022-10-01"},{"d":"2026-08-04","k":"milestone","t":"County project map: in progress, 10% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D42&outFields=*&outSR=4326&f=json","s":"2026-08-04"}],"flags":[{"r":"late","sev":"high","note":"Programmed for FY2023; the county map shows it in progress at 10%."}],"gaps":[],"base":{"a":888000,"t":"programmed in the schedule"},"surtax":"p42","pct":10,"sev":"high","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2021-10-01","last":"2026-08-04","money":888000,"vendor":null},{"id":"st-p117","n":"Industrial Drive and Redwood Aveue Outfall Improvements Project","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Unincorporated Bay County","what":"The goal of this project is to improve the water quality of Watson Bayou in the St. Andrews Bay System and to reduce upstream flooding of the 670- acre basin. This will be accomplished by installation of a 48- inch pipe and the addition of a nutrient separating baffle box.","funding":"Half-cent infrastructure sales tax","status":"budgeted","src":"surtax","ev":[{"d":"FY2022","k":"budget","a":1445697,"t":"Programmed in the county's sales tax schedule: Industrial Drive & Redwood Ave Outfall Improvement (CDBG-DR) (in progress (under design))","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","s":"2021-10-01"},{"d":"2026-08-04","k":"milestone","t":"County project map: not started, 0% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D117&outFields=*&outSR=4326&f=json","s":"2026-08-04"}],"flags":[{"r":"late","sev":"high","note":"Programmed for FY2022; the county map shows it not started at 0%."}],"gaps":[],"base":{"a":1445697,"t":"programmed in the schedule"},"surtax":"p117","pct":0,"sev":"high","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2021-10-01","last":"2026-08-04","money":1445697,"vendor":null},{"id":"st-p2586","n":"Mashburn Road Bridge Replacement","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Unincorporated Bay County","what":"Mashburn Road is a dirt roadway serving local traffic in the area. The roadway currently has a one lane wooden bridge that is structurally deficient. The existing bridge has flooded during past rain events due to its low elevation. The proposed project will construct a new two lane bridge at a highe","funding":"Half-cent infrastructure sales tax","status":"removed","src":"surtax","ev":[{"d":"FY2024","k":"budget","a":100000,"t":"Programmed in the county's sales tax schedule: Replace Mashburn Rd Bridge (removed (struck through))","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","s":"2023-10-01"},{"d":"FY2025","k":"budget","a":700000,"t":"Programmed in the county's sales tax schedule: Replace Mashburn Rd Bridge (removed (struck through))","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","s":"2024-10-01"},{"d":"2026-08-04","k":"milestone","t":"County project map: not started, 0% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D2586&outFields=*&outSR=4326&f=json","s":"2026-08-04"}],"flags":[{"r":"removed","sev":"info","note":"Struck through on the schedule."}],"gaps":[],"base":{"a":800000,"t":"programmed in the schedule"},"surtax":"p2586","pct":0,"sev":"info","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2023-10-01","last":"2026-08-04","money":800000,"vendor":null},{"id":"st-p2589","n":"Otter Creek Bridge Replacement","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Unincorporated Bay County","what":"Otter Creek Road is a two lane unpaved roadway serving local traffic in the area. The roadway currently has a one lane wooden bridge that is structurally deficient. The existing bridge has flooded during past rain events due to its low elevation. The proposed project will construct a new two lane br","funding":"Half-cent infrastructure sales tax","status":"removed","src":"surtax","ev":[{"d":"FY2025","k":"budget","a":100000,"t":"Programmed in the county's sales tax schedule: Repair Replace Otter Creek Bridge (75% LMS) (removed (struck through))","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","s":"2024-10-01"},{"d":"FY2026","k":"budget","a":1700000,"t":"Programmed in the county's sales tax schedule: Repair Replace Otter Creek Bridge (75% LMS) (removed (struck through))","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","s":"2025-10-01"},{"d":"2026-08-04","k":"milestone","t":"County project map: not started, 0% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D2589&outFields=*&outSR=4326&f=json","s":"2026-08-04"}],"flags":[{"r":"removed","sev":"info","note":"Struck through on the schedule."}],"gaps":[],"base":{"a":1800000,"t":"programmed in the schedule"},"surtax":"p2589","pct":0,"sev":"info","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2024-10-01","last":"2026-08-04","money":1800000,"vendor":null},{"id":"st-p2591","n":"Pinecrest Road Bridge Replacement","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Unincorporated Bay County","what":"Pinecrest Road is a two lane dirt roadway serving local traffic in the area. The roadway currently has a one lane wooden bridge that is structurally deficient. The existing bridge has flooded during past rain events due to its low elevation. The proposed project will construct a new two lane bridge ","funding":"Half-cent infrastructure sales tax","status":"removed","src":"surtax","ev":[{"d":"FY2025","k":"budget","a":70000,"t":"Programmed in the county's sales tax schedule: Replace Pinecrest Rd Bridge (removed (struck through))","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","s":"2024-10-01"},{"d":"FY2026","k":"budget","a":400000,"t":"Programmed in the county's sales tax schedule: Replace Pinecrest Rd Bridge (removed (struck through))","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","s":"2025-10-01"},{"d":"2026-08-04","k":"milestone","t":"County project map: not started, 0% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D2591&outFields=*&outSR=4326&f=json","s":"2026-08-04"}],"flags":[{"r":"removed","sev":"info","note":"Struck through on the schedule."}],"gaps":[],"base":{"a":470000,"t":"programmed in the schedule"},"surtax":"p2591","pct":0,"sev":"info","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2024-10-01","last":"2026-08-04","money":470000,"vendor":null},{"id":"st-p2592","n":"County Road 389 at Dundee Lane Intersection Improvements","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Unincorporated Bay County","what":"This project will consist of the addition of a left turn lane for westbound traffic on CR 389 turning onto Dundee Lane. At this heavily traveled intersection, vehicles heading west are forced to wait for left turning vehicles to move before they can proceed. This project will enhance daily traffic b","funding":"Half-cent infrastructure sales tax","status":"complete","src":"surtax","ev":[{"d":"FY2021","k":"budget","a":250000,"t":"Programmed in the county's sales tax schedule: CR 389 @ Dundee Lane Construct Left Turn Lane (completed)","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","s":"2020-10-01"},{"d":"2026-08-04","k":"complete","t":"County project map: completed, 100% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D2592&outFields=*&outSR=4326&f=json","s":"2026-08-04"}],"flags":[],"gaps":[],"base":{"a":250000,"t":"programmed in the schedule"},"surtax":"p2592","pct":100,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2020-10-01","last":"2026-08-04","money":250000,"vendor":null},{"id":"st-p3011","n":"CR 2297 Bridge Replacement","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Unincorporated Bay County","what":"This project will consist of the removal and construction of CR 2297 (Cooks Bayou) Bridge.","funding":"Half-cent infrastructure sales tax","status":"complete","src":"surtax","ev":[{"d":"FY2017","k":"budget","a":789942,"t":"Programmed in the county's sales tax schedule: CR 2297 Bridge Replacement (Grant / Surtax) (completed)","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","s":"2016-10-01"},{"d":"2026-08-04","k":"complete","t":"County project map: completed, 100% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3011&outFields=*&outSR=4326&f=json","s":"2026-08-04"}],"flags":[],"gaps":[],"base":{"a":789942,"t":"programmed in the schedule"},"surtax":"p3011","pct":100,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2016-10-01","last":"2026-08-04","money":789942,"vendor":null},{"id":"st-p3884","n":"7135 N Lagoon Dr","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"7135 N Lagoon Dr ","what":"FY2023","funding":"Half-cent infrastructure sales tax","status":"complete","src":"surtax","ev":[{"d":"FY2023","k":"budget","a":372730,"t":"Programmed in the county's sales tax schedule: 7135 N Lagoon Dr (HMGP Grant 100%) (completed)","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","s":"2022-10-01"},{"d":"2026-08-04","k":"complete","t":"County project map: completed, 100% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3884&outFields=*&outSR=4326&f=json","s":"2026-08-04"}],"flags":[],"gaps":[],"base":{"a":372730,"t":"programmed in the schedule"},"surtax":"p3884","pct":100,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2022-10-01","last":"2026-08-04","money":372730,"vendor":null},{"id":"st-p3885","n":"1716 Vecuna Cir","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Bay County Property Purchase, 1716 Vecuna Cir","what":"FY2023","funding":"Half-cent infrastructure sales tax","status":"complete","src":"surtax","ev":[{"d":"FY2023","k":"budget","a":275730,"t":"Programmed in the county's sales tax schedule: 1716 Vecuna Cir (HMGP Grant 100%) (completed)","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","s":"2022-10-01"},{"d":"2026-08-04","k":"complete","t":"County project map: completed, 100% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3885&outFields=*&outSR=4326&f=json","s":"2026-08-04"}],"flags":[],"gaps":[],"base":{"a":275730,"t":"programmed in the schedule"},"surtax":"p3885","pct":100,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2022-10-01","last":"2026-08-04","money":275730,"vendor":null},{"id":"st-p3903","n":"Jamaican Lake Basin Model","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Jamaican Lake","what":"FY2023","funding":"Half-cent infrastructure sales tax","status":"construction","src":"surtax","ev":[{"d":"FY2023","k":"budget","a":100000,"t":"Programmed in the county's sales tax schedule: Jamaican Lake Basin Model (in progress (under design))","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","s":"2022-10-01"},{"d":"2026-08-04","k":"milestone","t":"County project map: in progress, 10% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/0/query?where=OBJECTID%3D3903&outFields=*&outSR=4326&f=json","s":"2026-08-04"}],"flags":[{"r":"late","sev":"high","note":"Programmed for FY2023; the county map shows it in progress at 10%."}],"gaps":[],"base":{"a":100000,"t":"programmed in the schedule"},"surtax":"p3903","pct":10,"sev":"high","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2022-10-01","last":"2026-08-04","money":100000,"vendor":null},{"id":"st-l54","n":"County Road 388 Roadway Repaving","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"CR 2301 to U.S. Hwy 231","what":"This project will include resurfacing County Road 388 from County Road 2301 to U.S. Highway 231. County Road 388 is a heavily traveled corridor spanning northeastern Bay County with significant failures in the existing pavement.","funding":"Half-cent infrastructure sales tax","status":"complete","src":"surtax","ev":[{"d":"FY2021","k":"budget","a":2361570,"t":"Programmed in the county's sales tax schedule: CR 388 (completed)","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","s":"2020-10-01"},{"d":null,"k":"complete","t":"County project map: completed, 100% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(54)&outFields=*&outSR=4326&f=json","s":"9999"}],"flags":[],"gaps":[],"base":{"a":2361570,"t":"programmed in the schedule"},"surtax":"l54","pct":100,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2020-10-01","last":"2020-10-01","money":2361570,"vendor":null},{"id":"st-l61","n":"North Lagoon Drive Repaving and Roadway Safety Project","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Joan Ave to Thomas Dr","what":"This heavily traveled collector road is a main thoroughfare used by tourists and residents to avoid traffic on Thomas Drive, causing significant pavement deterioration. Sidewalks and bike lanes will be installed along this section of roadway increasing pedestrian safety. The project consists of repa","funding":"Half-cent infrastructure sales tax","status":"complete","src":"surtax","ev":[{"d":"FY2017","k":"budget","a":56000,"t":"Programmed in the county's sales tax schedule: North Lagoon (Joan Ave to Thomas Drive)/Multi Use Path (completed)","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","s":"2016-10-01"},{"d":"FY2018","k":"budget","a":523416,"t":"Programmed in the county's sales tax schedule: North Lagoon (Joan Ave to Thomas Drive)/Multi Use Path (completed)","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","s":"2017-10-01"},{"d":null,"k":"complete","t":"County project map: completed, 100% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(61)&outFields=*&outSR=4326&f=json","s":"9999"}],"flags":[],"gaps":[],"base":{"a":579416,"t":"programmed in the schedule"},"surtax":"l61","pct":100,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2016-10-01","last":"2017-10-01","money":579416,"vendor":null},{"id":"st-l65","n":"County Road 389 (East Avenue) Repaving","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"SR390 to Baldwin Rd","what":"This heavily traveled collector road connects Lynn Haven and State Road 390 traffic with U.S. Highway 231. The roadway is also a primary travel corridor for families with children in Hiland Park Elementary School and Bay Haven Charter Academy. This section of road is significantly deteriorated. This","funding":"Half-cent infrastructure sales tax","status":"complete","src":"surtax","ev":[{"d":"FY2020","k":"budget","a":1348197,"t":"Programmed in the county's sales tax schedule: CR 389 (East Ave) 390 to Baldwin (completed)","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","s":"2019-10-01"},{"d":null,"k":"complete","t":"County project map: completed, 100% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(65)&outFields=*&outSR=4326&f=json","s":"9999"}],"flags":[],"gaps":[],"base":{"a":1348197,"t":"programmed in the schedule"},"surtax":"l65","pct":100,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2019-10-01","last":"2019-10-01","money":1348197,"vendor":null},{"id":"st-l66","n":"County Road 2297 Repaving","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Airway St to Allanton Rd","what":"County Road 2297 is a collector road serving as the main access to Allanton and the Eastern Shipbuilding facility. This section of road is severely rutted and cracked. This project consists of repaving County Road 2297 from Airway Road to Allanton Road.","funding":"Half-cent infrastructure sales tax","status":"complete","src":"surtax","ev":[{"d":"FY2023","k":"budget","a":3428273,"t":"Programmed in the county's sales tax schedule: CR 2297 (Grant 75%) (completed)","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","s":"2022-10-01"},{"d":null,"k":"complete","t":"County project map: completed, 100% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(66)&outFields=*&outSR=4326&f=json","s":"9999"}],"flags":[],"gaps":[],"base":{"a":3428273,"t":"programmed in the schedule"},"surtax":"l66","pct":100,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2022-10-01","last":"2022-10-01","money":3428273,"vendor":null},{"id":"st-l67","n":"County Road 2300 Repaving","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Hwy 77 to Dead end","what":"This project consists of repaving County Road 2300 from State Road 77 to the Lansing Smith facility entrance. County Road 2300 serves as the link to the steam plant and the Bay County Emergency Operations Center, as well as ongoing residential development in the area. With substantial pavement deter","funding":"Half-cent infrastructure sales tax","status":"complete","src":"surtax","ev":[{"d":null,"k":"complete","t":"County project map: completed, 100% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(67)&outFields=*&outSR=4326&f=json","s":"9999"}],"flags":[],"gaps":[],"base":{"a":0,"t":"programmed in the schedule"},"surtax":"l67","pct":100,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":null,"last":null,"money":0,"vendor":null},{"id":"st-l71","n":"Wildwood Road Repaving","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Big Daddy Dr to US 98","what":"Wildwood Rd is the only collector road to service the residential area near West Bay and the Hathaway Bridge. This section of road has experienced significant pavement deterioration resulting in rutting and cracking. The project consists of repaving Wildwood Rd from Big Daddy Dr St to US Highway 98.","funding":"Half-cent infrastructure sales tax","status":"complete","src":"surtax","ev":[{"d":"FY2020","k":"budget","a":235750,"t":"Programmed in the county's sales tax schedule: Wildwood Road (completed)","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","s":"2019-10-01"},{"d":null,"k":"complete","t":"County project map: completed, 100% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(71)&outFields=*&outSR=4326&f=json","s":"9999"}],"flags":[],"gaps":[],"base":{"a":235750,"t":"programmed in the schedule"},"surtax":"l71","pct":100,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2019-10-01","last":"2019-10-01","money":235750,"vendor":null},{"id":"st-l75","n":"New Church Road Repaving","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Long Rd to Kingwood Rd","what":"New Church Road is deteriorated due to weathering and block cracking. The project consists of repaving New Church Road from Long Road to Kingwood Road.","funding":"Half-cent infrastructure sales tax","status":"complete","src":"surtax","ev":[{"d":"FY2019","k":"budget","a":133400,"t":"Programmed in the county's sales tax schedule: New Church Road (completed)","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","s":"2018-10-01"},{"d":null,"k":"complete","t":"County project map: completed, 100% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(75)&outFields=*&outSR=4326&f=json","s":"9999"}],"flags":[],"gaps":[],"base":{"a":133400,"t":"programmed in the schedule"},"surtax":"l75","pct":100,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2018-10-01","last":"2018-10-01","money":133400,"vendor":null},{"id":"st-l79","n":"Center Drive","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Camellia St to Silver Lake Rd","what":"This is a local road that services the Fountain community and has experienced significant pavement deterioration in the form of block cracking and longitudinal cracking. The project consists of repaving Center Dr from Camellia St to Silver Lake Rd.","funding":"Half-cent infrastructure sales tax","status":"complete","src":"surtax","ev":[{"d":"FY2017","k":"budget","a":262092,"t":"Programmed in the county's sales tax schedule: Center Dr (completed)","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","s":"2016-10-01"},{"d":null,"k":"complete","t":"County project map: completed, 100% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(79)&outFields=*&outSR=4326&f=json","s":"9999"}],"flags":[],"gaps":[],"base":{"a":262092,"t":"programmed in the schedule"},"surtax":"l79","pct":100,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2016-10-01","last":"2016-10-01","money":262092,"vendor":null},{"id":"st-l82","n":"Frankford Avenue Repaving","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Bridge to End of the Road","what":"This collector road is used primarily by local traffic to access businesses on the north end of the corridor. This section of road is deteriorated, resulting in pavement rutting and cracking. This project consists of repaving Frankford Avenue from the bridge to the end of the road.","funding":"Half-cent infrastructure sales tax","status":"complete","src":"surtax","ev":[{"d":"FY2021","k":"budget","a":300000,"t":"Programmed in the county's sales tax schedule: Frankford Ave (completed)","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","s":"2020-10-01"},{"d":null,"k":"complete","t":"County project map: completed, 100% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(82)&outFields=*&outSR=4326&f=json","s":"9999"}],"flags":[],"gaps":[],"base":{"a":300000,"t":"programmed in the schedule"},"surtax":"l82","pct":100,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2020-10-01","last":"2020-10-01","money":300000,"vendor":null},{"id":"st-l85","n":"East Callaway Drive Repaving","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"SR22 to End of Pavement","what":"This collector road is used primarily by local traffic but is also heavily traveled by logging trucks. This section of road is significantly deteriorated, resulting in rutting and cracking. It is especially bad at the stop sign at the intersection of State Road 22 where heavy trucks come to a stop. ","funding":"Half-cent infrastructure sales tax","status":"complete","src":"surtax","ev":[{"d":"FY2021","k":"budget","a":740000,"t":"Programmed in the county's sales tax schedule: East Callaway Dr (completed)","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","s":"2020-10-01"},{"d":null,"k":"complete","t":"County project map: completed, 100% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(85)&outFields=*&outSR=4326&f=json","s":"9999"}],"flags":[],"gaps":[],"base":{"a":740000,"t":"programmed in the schedule"},"surtax":"l85","pct":100,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2020-10-01","last":"2020-10-01","money":740000,"vendor":null},{"id":"st-l92","n":"County Road 389 (East Avenue) North Repaving","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"SR 390 to Hwy 77","what":"This section of East Ave is an arterial road that provides alternative traffic flow for State Road 390. This section of road has experienced pavement deterioration resulting in rutting and cracking. The project consists of repaving County Road 389 (East Avenue) from State Road 390 to State Road 77.","funding":"Half-cent infrastructure sales tax","status":"complete","src":"surtax","ev":[{"d":"FY2019","k":"budget","a":1325143,"t":"Programmed in the county's sales tax schedule: CR 389 (East Ave) SR 77 to 390 (completed)","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","s":"2018-10-01"},{"d":null,"k":"complete","t":"County project map: completed, 100% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(92)&outFields=*&outSR=4326&f=json","s":"9999"}],"flags":[],"gaps":[],"base":{"a":1325143,"t":"programmed in the schedule"},"surtax":"l92","pct":100,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2018-10-01","last":"2018-10-01","money":1325143,"vendor":null},{"id":"st-l1799","n":"W Linger Longer Road Paving","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"W Linger Longer Road Paving","what":"This section of West Linger Longer Road is under an environmental Notice of Violation (NOV). This project consists of paving West Linger Longer Road from US 231 to Joshua Drive to reduce sedimentation from entering adjacent waterbodies.","funding":"Half-cent infrastructure sales tax","status":"construction","src":"surtax","ev":[{"d":"FY2023","k":"budget","a":2174270,"t":"Programmed in the county's sales tax schedule: W. Linger Longer Rd (V33-34) (DEP Grant 40%) (in progress (construction/advertising))","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","s":"2022-10-01"},{"d":null,"k":"milestone","t":"County project map: in progress, 33% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(1799)&outFields=*&outSR=4326&f=json","s":"9999"}],"flags":[{"r":"late","sev":"high","note":"Programmed for FY2023; the county map shows it in progress at 33%."}],"gaps":[],"base":{"a":2174270,"t":"programmed in the schedule"},"surtax":"l1799","pct":33,"sev":"high","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2022-10-01","last":"2022-10-01","money":2174270,"vendor":null},{"id":"st-l1800","n":"Webber Road Paving","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Webber Road Paving","what":"This unpaved connector is the subject of several environmental Notices of Violation (NOV 35-37). This project consists of paving Webber Road from US 231 to Sorrells Drive to reduce sedimentation entering the adjacent waterbodies.","funding":"Half-cent infrastructure sales tax","status":"complete","src":"surtax","ev":[{"d":"FY2017","k":"budget","a":587379,"t":"Programmed in the county's sales tax schedule: Webber Road (NOV 35-37) (Non Sales Tax Funds = $500,000) (completed)","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","s":"2016-10-01"},{"d":null,"k":"complete","t":"County project map: completed, 100% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(1800)&outFields=*&outSR=4326&f=json","s":"9999"}],"flags":[],"gaps":[],"base":{"a":587379,"t":"programmed in the schedule"},"surtax":"l1800","pct":100,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2016-10-01","last":"2016-10-01","money":587379,"vendor":null},{"id":"st-l2602","n":"Bertha Nelson Road Paving","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Bertha Nelson Road Paving","what":"This local road is the only County-owned road between Highway 2321, Titus Road and US 231 that remains unpaved. This project consists of paving Bertha Nelson Road from US 231 to Titus Road.","funding":"Half-cent infrastructure sales tax","status":"complete","src":"surtax","ev":[{"d":"FY2017","k":"budget","a":497710,"t":"Programmed in the county's sales tax schedule: Bertha Nelson Road (US 231 to Titus Road) (completed)","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","s":"2016-10-01"},{"d":null,"k":"complete","t":"County project map: completed, 100% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(2602)&outFields=*&outSR=4326&f=json","s":"9999"}],"flags":[],"gaps":[],"base":{"a":497710,"t":"programmed in the schedule"},"surtax":"l2602","pct":100,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2016-10-01","last":"2016-10-01","money":497710,"vendor":null},{"id":"st-l2603","n":"Wendy Road Paving","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"US 231 to Coe Road","what":"Paving this local road would provide another access to the properties northeast of Highway 2301 and help to relieve some of the traffic load on Highway 2301. This project consists of paving Wendy Road from US 231 to Coe Road.","funding":"Half-cent infrastructure sales tax","status":"complete","src":"surtax","ev":[{"d":"FY2017","k":"budget","a":428220,"t":"Programmed in the county's sales tax schedule: Wendy Road (US 231 to Coe Road) (completed)","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","s":"2016-10-01"},{"d":null,"k":"complete","t":"County project map: completed, 100% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(2603)&outFields=*&outSR=4326&f=json","s":"9999"}],"flags":[],"gaps":[],"base":{"a":428220,"t":"programmed in the schedule"},"surtax":"l2603","pct":100,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2016-10-01","last":"2016-10-01","money":428220,"vendor":null},{"id":"st-l2606","n":"Veal Road Paving","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Davenport Ave to Hwy 231 to Bear Paw Ln","what":"This section of Veal Road is the last remaining unpaved collector road in this area. This project consists of paving Veal Road from on both sides of US 231.","funding":"Half-cent infrastructure sales tax","status":"complete","src":"surtax","ev":[{"d":"FY2020","k":"budget","a":1545557,"t":"Programmed in the county's sales tax schedule: Veal Road (Grant) (completed)","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","s":"2019-10-01"},{"d":null,"k":"complete","t":"County project map: completed, 100% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(2606)&outFields=*&outSR=4326&f=json","s":"9999"}],"flags":[],"gaps":[],"base":{"a":1545557,"t":"programmed in the schedule"},"surtax":"l2606","pct":100,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2019-10-01","last":"2019-10-01","money":1545557,"vendor":null},{"id":"st-l2611","n":"Sweetwater Branch Road Paving","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Sweetwater Branch Road Paving","what":"Paving this road would provide paved access between Scott Road and Ownwood Road, two collectors roads that serve the west side population of Fountain. This project consists of paving Sweetwater Branch Road from Owenwood Road to Scotts Road.","funding":"Half-cent infrastructure sales tax","status":"complete","src":"surtax","ev":[{"d":"FY2022","k":"budget","a":3624116,"t":"Programmed in the county's sales tax schedule: Sweetwater Branch Road (DEP Grant 40%) (completed)","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","s":"2021-10-01"},{"d":null,"k":"complete","t":"County project map: completed, 100% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(2611)&outFields=*&outSR=4326&f=json","s":"9999"}],"flags":[],"gaps":[],"base":{"a":3624116,"t":"programmed in the schedule"},"surtax":"l2611","pct":100,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2021-10-01","last":"2021-10-01","money":3624116,"vendor":null},{"id":"st-l2612","n":"County Line Road Paving","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"County Line Road Paving","what":"This is the last section of County Line Road needing to be paved. Doing so would complete the paved access between Scott Road and US 231; two roads that serve the west side population of Fountain. This project consists of paving County Line Road from the currently paved section of County Line Road t","funding":"Half-cent infrastructure sales tax","status":"budgeted","src":"surtax","ev":[{"d":"FY2023","k":"budget","a":900000,"t":"Programmed in the county's sales tax schedule: County Line Road DEP Grant (in progress (under design))","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","s":"2022-10-01"},{"d":"FY2024","k":"budget","a":1300000,"t":"Programmed in the county's sales tax schedule: County Line Road DEP Grant (in progress (under design))","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","s":"2023-10-01"},{"d":null,"k":"milestone","t":"County project map: not started, 0% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(2612)&outFields=*&outSR=4326&f=json","s":"9999"}],"flags":[{"r":"late","sev":"warn","note":"Programmed for FY2024; the county map shows it not started at 0%."}],"gaps":[],"base":{"a":2200000,"t":"programmed in the schedule"},"surtax":"l2612","pct":0,"sev":"warn","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2022-10-01","last":"2023-10-01","money":2200000,"vendor":null},{"id":"st-l2615","n":"Ivydell Street Paving","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Ivydell Street Paving","what":"Ivydell Road is an unpaved collector road that serves a large portion of the population of Fountain. This project consists of paving Ivydell Road from US 231 to the dead end.","funding":"Half-cent infrastructure sales tax","status":"budgeted","src":"surtax","ev":[{"d":"FY2026","k":"budget","a":550000,"t":"Programmed in the county's sales tax schedule: Ivydell Street (planned/not started (no status colour))","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-Last-5-Years-List-of-Projects.pdf","s":"2025-10-01"},{"d":null,"k":"milestone","t":"County project map: not started, 0% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(2615)&outFields=*&outSR=4326&f=json","s":"9999"}],"flags":[{"r":"late","sev":"warn","note":"Programmed for FY2026; the county map shows it not started at 0%."}],"gaps":[],"base":{"a":550000,"t":"programmed in the schedule"},"surtax":"l2615","pct":0,"sev":"warn","reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2025-10-01","last":"2025-10-01","money":550000,"vendor":null},{"id":"st-l3010","n":"Cowels Road Paving","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Cowels Road Paving","what":"This local collector provides a more direct routing for the residents of the Bear Pond area to access their properties from Highway 231. This project consists of paving Cowels Road from Silver Lake Road to South Silver Lake Road.","funding":"Half-cent infrastructure sales tax","status":"complete","src":"surtax","ev":[{"d":"FY2018","k":"budget","a":2090708,"t":"Programmed in the county's sales tax schedule: Cowels Road (completed)","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","s":"2017-10-01"},{"d":null,"k":"complete","t":"County project map: completed, 100% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3010)&outFields=*&outSR=4326&f=json","s":"9999"}],"flags":[],"gaps":[],"base":{"a":2090708,"t":"programmed in the schedule"},"surtax":"l3010","pct":100,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2017-10-01","last":"2017-10-01","money":2090708,"vendor":null},{"id":"st-l3011","n":"Nehi Road Paving","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Star Ave to Hwy 231","what":"Nehi Road provides a more direct connection between Callaway and Lynn Haven by allowing access to East Highway 390 from Star Avenue. Paving this road would also reduce the amount of traffic on Star Avenue in the area of Merritt Brown School. This project consists of paving Nehi Road from Star Avenue","funding":"Half-cent infrastructure sales tax","status":"complete","src":"surtax","ev":[{"d":"FY2019","k":"budget","a":2144401,"t":"Programmed in the county's sales tax schedule: Nehi Road (Grant) (completed)","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","s":"2018-10-01"},{"d":null,"k":"complete","t":"County project map: completed, 100% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(3011)&outFields=*&outSR=4326&f=json","s":"9999"}],"flags":[],"gaps":[],"base":{"a":2144401,"t":"programmed in the schedule"},"surtax":"l3011","pct":100,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2018-10-01","last":"2018-10-01","money":2144401,"vendor":null},{"id":"st-l6894","n":"Merritt Brown Road Sidewalk","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Merritt Brown Road Sidewalk","what":"","funding":"Half-cent infrastructure sales tax","status":"complete","src":"surtax","ev":[{"d":"FY2020","k":"budget","a":595229,"t":"Programmed in the county's sales tax schedule: Merritt Brown Road Sidewalk (completed)","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","s":"2019-10-01"},{"d":null,"k":"complete","t":"County project map: completed, 100% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(6894)&outFields=*&outSR=4326&f=json","s":"9999"}],"flags":[],"gaps":[],"base":{"a":595229,"t":"programmed in the schedule"},"surtax":"l6894","pct":100,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2019-10-01","last":"2019-10-01","money":595229,"vendor":null},{"id":"st-l7589","n":"Pine Log Rd","gk":"county","g":"Bay County","agency":"Bay County (half-cent infrastructure sales tax)","where":"Mullins Rd to Otter Creek Bridge Rd","what":"Resurfacing partially funded by FEMA and surtax","funding":"Half-cent infrastructure sales tax","status":"complete","src":"surtax","ev":[{"d":"FY2021","k":"budget","a":750000,"t":"Programmed in the county's sales tax schedule: Pine Log Road (completed)","u":"http://bayhalfcent.com/wp-content/uploads/2024/10/Public-Works-First-5-Years-List-of-Projects.pdf","s":"2020-10-01"},{"d":null,"k":"complete","t":"County project map: completed, 100% complete","u":"https://services1.arcgis.com/QB0VWfqR9MD4lF0F/arcgis/rest/services/Surtax_Projects/FeatureServer/1/query?where=OBJECTID+IN+(7589)&outFields=*&outSR=4326&f=json","s":"9999"}],"flags":[],"gaps":[],"base":{"a":750000,"t":"programmed in the schedule"},"surtax":"l7589","pct":100,"sev":null,"reply":{"status":"not_sent","sent":null,"date":null,"text":null,"u":null},"first":"2020-10-01","last":"2020-10-01","money":750000,"vendor":null}]}